Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 9 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expectedup Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  64   Thu Mar 12 13:49:09 2020 Phetest without bakeoutBPM SIS100 2010-17 (ceramic only)ReceivedOn schedule 12.03.2020DONENot Needed18.03.2020; 08:25Setup 119.03.2020; 11:00Cond. Accep.19.03.2020M.Müller    
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller    
  98   Tue Nov 3 09:55:20 2020 Cristinatest with bakeoutMCPs for IPM SIS18SeptemberDelayed 2.11.20DONEAccepted2.11.20Setup 109.11.2020Cond. Accep.10.11.2020T.Giacomini    
  51   Tue Feb 11 09:53:14 2020 Cristinaleak checkSIS100 Sextupole (6)September 2020Delayed              
  52   Tue Feb 11 09:54:49 2020 Cristinatest with bakeoutSIS100 Injection Kicker September 2020Delayed              