Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 9 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
3
Mon Sep 30 11:11:26 2019
Cristina
test with bakeout
Laser chamber -Winters
Beginning 2019
Delayed
16.08.2019
DONE
Accepted
30.08.2019
Customised
12.02.2020
Accepted
KW10
D.Winters
The measurement was stopped because of the
wrong heating jackets
86
Mon Sep 14 09:16:54 2020
Cristina
test with bakeout
Mirror Laser cooling SIS100
14.09.2020
DONE
Accepted
6.10.20
Mobile 2
21.10.20
Cond. Accep.
KW47
D.Winters
35
Thu Dec 12 09:20:54 2019
Cristina
test with bakeout
IPM SIS100-Giacomini
Jannuary 2020
Delayed
Unknown
21.04.2020
DONE
Not Needed
04.05.2020
Customised
15.05.2020
Accepted
Mai/Juni
Brough to the TH
21
Thu Nov 14 14:00:28 2019
Phe
test without bakeout
Ref. Chamber for Beam Diagnostic Manipulator
unknown
DONE
Accepted
14.11.2019; 10:30 am
Customised
22.11.2019
Cond. Accep.
N/A
N/A
Wide range gauge is now installed on the chamber.
The previous test with cold cathode gauge
failed due to broken gauge.
Another
133
Tue Jun 8 10:19:14 2021
Cristina
test without bakeout
Dipole Module
25.05.21
DONE
Not Needed
25.05.21
Customised
27.07.21
Cond. Accep.
TH
F.Kaether