Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
133
Tue Jun 8 10:19:14 2021
Cristina
test without bakeout
Dipole Module
25.05.21
DONE
Not Needed
25.05.21
Customised
27.07.21
Cond. Accep.
TH
F.Kaether
21
Thu Nov 14 14:00:28 2019
Phe
test without bakeout
Ref. Chamber for Beam Diagnostic Manipulator
unknown
DONE
Accepted
14.11.2019; 10:30 am
Customised
22.11.2019
Cond. Accep.
N/A
N/A
Wide range gauge is now installed on the chamber.
The previous test with cold cathode gauge
failed due to broken gauge.
Another
35
Thu Dec 12 09:20:54 2019
Cristina
test with bakeout
IPM SIS100-Giacomini
Jannuary 2020
Delayed
Unknown
21.04.2020
DONE
Not Needed
04.05.2020
Customised
15.05.2020
Accepted
Mai/Juni
Brough to the TH
86
Mon Sep 14 09:16:54 2020
Cristina
test with bakeout
Mirror Laser cooling SIS100
14.09.2020
DONE
Accepted
6.10.20
Mobile 2
21.10.20
Cond. Accep.
KW47
D.Winters
3
Mon Sep 30 11:11:26 2019
Cristina
test with bakeout
Laser chamber -Winters
Beginning 2019
Delayed
16.08.2019
DONE
Accepted
30.08.2019
Customised
12.02.2020
Accepted
KW10
D.Winters
The measurement was stopped because of the
wrong heating jackets
159
Thu Dec 9 11:41:47 2021
Cristina
test with bakeout
Tube with ceramic gap- resistence study
03.12.21
DONE
Not Needed
06.12.21
Setup 1
09.12.21
Dec 21
92
Mon Sep 21 11:39:27 2020
Cristina
test without bakeout
Steel with epoxy glue
August 20
Delayed
21.09.20
DONE
22.09.2020
03.10.20
Refused
?
?
10
Wed Oct 9 08:01:51 2019
Phe
test with bakeout
Macor Samples from Tino Giacomini
02.10.2019
DONE
Accepted
10.10.2019
Mobile 2
6.11.19
Accepted
8.11.19
Giacomini
Macor samples have been received from Tino
Giacomini on the 02.10.2019. These Macor
samples will be used for IPM chamber. The
54
Tue Feb 11 09:59:48 2020
Cristina
leak check
SIS100 Quadrupole chambers
March 2020
Delayed
September 20
September 20
DONE
Accepted
30.09.20
HEBT Setup
06.10.20
Accepted
8.10.20
I.Pongrac
95
Wed Sep 30 13:39:48 2020
Cristina
test with bakeout
Tube CCC Cryring
30.09.2020
DONE
Accepted
5.10.20
Setup 1
07.10.20
Accepted
8.10.20
T. Sieber
138
Thu Jun 24 12:06:49 2021
Cristina
test with bakeout
Test for polymide coated sample- Fischer
DONE
2.07.21
HEBT Setup
6.07.21
Cond. Accep.
8.07.21
L.Fischer
70
Wed Apr 22 10:14:43 2020
Cristina
test with bakeout
Ceramic Tube for Cryring (Sieber
KW13
Delayed
22.04.2020
24.04.2020
DONE
Not Needed
27.04.2020
Setup 2
06.05.2020
Refused
8.05.2020
T.Sieber
61
Wed Mar 4 10:06:09 2020
Phe
leak check
Transistion tube for SIS100 string test_Second test
Beginning 2020
Delayed
February
End of February
DONE
Accepted
03.03.2020
Customised
03.03.2020
Accepted
5.03.2020
Ivan and Stefan (for integration @BNG)
146
Thu Aug 19 10:00:46 2021
Cristina
BPM Kyocera (8 pieces)
28.07.21
30.07.21
DONE
Not Needed
02.08.21
Mobile 3
28.08.21
Accepted
31.08.21
F.Wolf
163
Tue Jan 18 08:50:13 2022
Cristina
test with bakeout
Mirror chamber ESR (Brandau)
16.01.22
DONE
Not Needed
17.01.22
Customised
31.01.22
Cond. Accep.
31.01.22
ESR
164
Tue Jan 18 08:51:15 2022
Cristina
test without bakeout
Grids for pLinac (Siebert)
07.01.22
17.01.22
DONE
Not Needed
19.01.22
HEBT Setup
31.01.22
Cond. Accep.
31.01.22
T.Sieber
57
Wed Feb 19 11:42:59 2020
Cristina
pumping speed
TMP Cryring (Nikita)
KW8
On schedule
KW8
19.02.2020
DONE
Refused
9.03.2020
Fischer-Mommsen
16.03.2020
Accepted
29.05.2020
Nikita
123
Thu Mar 18 11:40:02 2021
Cristina
test with bakeout
SIS100/HEBT Manipulator C.Dorn
17.03.21
DONE
Not Needed
18.03.21
Setup 1
24.03.21
Accepted
29.03.21
M.Müller
110
Fri Jan 29 11:54:20 2021
Cristina
leak check
Gate Valve
14.01.21
DONE
Accepted
28.01.21
Customised
28.01.21
Refused
29.01.21
A.Tauschwitz
43
Mon Jan 20 10:40:00 2020
Cristina
test with bakeout
Ceramic Tube Diagnostic-Dorn 06-004-01376-3
KW4
On schedule
KW4
20.01.20
DONE
Accepted
21.01.2020
Setup 1
27.01.20
Accepted
29.01.20
M.Müller