Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 9 of 9  Not logged in ELOG logo
ID Date Author Category Subjectup Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  68   Mon Apr 6 15:33:45 2020 Phetest with bakeoutUnbaked Ferrites from RI (bigger size) On schedule 06.04.2020DONENot Needed Setup 122.04.2020Cond. Accep.      
  122   Wed Mar 10 12:11:04 2021 Cristinatest with bakeoutViewports DN100 ESR   16.02.21on-goingNot Needed16.02.21Setup 116.03.21Cond. Accep.26.03.21R.Sanchez    
  161   Wed Jan 12 08:40:00 2022 Cristina Windows for ESR   10.01.22DONENot Needed13.01.22Setup 221.10.22Cond. Accep.03.02.22R.Sanchez    
  162   Wed Jan 12 08:40:41 2022 Cristina XHU detector ESR   16.12.21DONENot Needed12.01.22Setup 126.01.22Cond. Accep.24.02.22D.Winters    
  71   Wed Apr 22 13:45:53 2020 Cristinatest without bakeoutp-linac dipoles20.04.2020On schedule 20.04.2020DONEAccepted21.04.2020HEBT Setup29.04.2020Cond. Accep.27.05.2020Florian (Grossmontage)    
ELOG V3.1.5-fc6679b