ID Date Author Category Subjectdown Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  71   Wed Apr 22 13:45:53 2020 Cristinatest without bakeoutp-linac dipoles20.04.2020On schedule 20.04.2020DONEAccepted21.04.2020HEBT Setup29.04.2020Cond. Accep.27.05.2020Florian (Grossmontage)    
  162   Wed Jan 12 08:40:41 2022 Cristina XHU detector ESR   16.12.21DONENot Needed12.01.22Setup 126.01.22Cond. Accep.24.02.22D.Winters    
  161   Wed Jan 12 08:40:00 2022 Cristina Windows for ESR   10.01.22DONENot Needed13.01.22Setup 221.10.22Cond. Accep.03.02.22R.Sanchez    
  122   Wed Mar 10 12:11:04 2021 Cristinatest with bakeoutViewports DN100 ESR   16.02.21on-goingNot Needed16.02.21Setup 116.03.21Cond. Accep.26.03.21R.Sanchez    
  68   Mon Apr 6 15:33:45 2020 Phetest with bakeoutUnbaked Ferrites from RI (bigger size) On schedule 06.04.2020DONENot Needed Setup 122.04.2020Cond. Accep.      
  75   Tue May 19 12:03:40 2020 PheProblemTurbo Pump from Thomas Seiber On schedule KW19DONENot Needed19.05.2020Customised20.05.2020Refused27.05.2020Student from T.SieberDie Pumpe hat den Fehlercode 088 und hat eine
Störung des Axiallagersensors.(checked by
Graziano)
 pump_Sieber.jpg 
  159   Thu Dec 9 11:41:47 2021 Cristinatest with bakeoutTube with ceramic gap- resistence study   03.12.21DONENot Needed06.12.21Setup 109.12.21 Dec 21     
  15   Mon Oct 21 10:24:59 2019 CristinaOtherTube Heidelberg   17.10.2019DONEAcceptedFirst Test: 24.10.2019; Second Test:30.01.20 Horizontal Coating Setup29.10.2019: Refused; Second Test: 05.02.2020Accepted11.02.2020C.SchröterTube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
 HD_tube.jpg 
  95   Wed Sep 30 13:39:48 2020 Cristinatest with bakeoutTube CCC Cryring   30.09.2020DONEAccepted5.10.20Setup 107.10.20Accepted8.10.20T. Sieber    
  61   Wed Mar 4 10:06:09 2020 Pheleak checkTransistion tube for SIS100 string test_Second testBeginning 2020DelayedFebruaryEnd of FebruaryDONEAccepted03.03.2020Customised03.03.2020Accepted5.03.2020Ivan and Stefan (for integration @BNG)   IMG-20200304-WA0001.jpg 
  41   Wed Dec 18 11:27:54 2019 Pheleak checkTransistion tube for SIS100 string testBeginning 2020DelayedFebruary06.02.2020DONERefused   Refused      
  142   Mon Jul 12 13:47:03 2021 Cristinatest without bakeoutTrafos for isolation vacuum-Piotr   02.07.21DONENot Needed07.07.21Mobile 312.07.21Refused19.08.21P. Kowina    
  130   Tue May 18 14:10:04 2021 Cristinatest without bakeoutTrafos BPM   12.05.21DONENot Needed18.05.21Customised21.05.21Refused07.06.21M.Müller    
  87   Mon Sep 14 10:38:59 2020 Cristinatest without bakeoutTest on Viton gasket   14.09.2020TO DONot Needed          
  138   Thu Jun 24 12:06:49 2021 Cristinatest with bakeoutTest for polymide coated sample- Fischer    DONE 2.07.21HEBT Setup6.07.21Cond. Accep.8.07.21L.Fischer    
  32   Mon Dec 2 14:28:58 2019 CristinaGeneralTS1MU1-test with magnetAugust 2019 delayed to KW6 2020DelayedUnkwonN/ADONEAccepted04.03.2020Customised Accepted GrossmontageTest bakeout inside the magnet   
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  102   Mon Nov 30 11:14:30 2020 CristinaCoatingT-piece CryringOct  KW48DONEAccepted26.11.20Horizontal Coating Setup3.12.20Accepted10.12.20Nikita    
  92   Mon Sep 21 11:39:27 2020 Cristinatest without bakeoutSteel with epoxy glueAugust 20Delayed 21.09.20DONE 22.09.2020 03.10.20Refused??    
  7   Mon Sep 30 14:06:07 2019 Cristinapumping speedSlim SIP 150   9.08.2019DONEAccepted07.02.2020Fischer-Mommsen06.03.2020Accepted     Comparison.jpg 