ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
71
Wed Apr 22 13:45:53 2020
Cristina
test without bakeout
p-linac dipoles
20.04.2020
On schedule
20.04.2020
DONE
Accepted
21.04.2020
HEBT Setup
29.04.2020
Cond. Accep.
27.05.2020
Florian (Grossmontage)
162
Wed Jan 12 08:40:41 2022
Cristina
XHU detector ESR
16.12.21
DONE
Not Needed
12.01.22
Setup 1
26.01.22
Cond. Accep.
24.02.22
D.Winters
161
Wed Jan 12 08:40:00 2022
Cristina
Windows for ESR
10.01.22
DONE
Not Needed
13.01.22
Setup 2
21.10.22
Cond. Accep.
03.02.22
R.Sanchez
122
Wed Mar 10 12:11:04 2021
Cristina
test with bakeout
Viewports DN100 ESR
16.02.21
on-going
Not Needed
16.02.21
Setup 1
16.03.21
Cond. Accep.
26.03.21
R.Sanchez
68
Mon Apr 6 15:33:45 2020
Phe
test with bakeout
Unbaked Ferrites from RI (bigger size)
On schedule
06.04.2020
DONE
Not Needed
Setup 1
22.04.2020
Cond. Accep.
75
Tue May 19 12:03:40 2020
Phe
Problem
Turbo Pump from Thomas Seiber
On schedule
KW19
DONE
Not Needed
19.05.2020
Customised
20.05.2020
Refused
27.05.2020
Student from T.Sieber
Die Pumpe hat den Fehlercode 088 und hat eine
Störung des Axiallagersensors.(checked by
Graziano)
159
Thu Dec 9 11:41:47 2021
Cristina
test with bakeout
Tube with ceramic gap- resistence study
03.12.21
DONE
Not Needed
06.12.21
Setup 1
09.12.21
Dec 21
15
Mon Oct 21 10:24:59 2019
Cristina
Other
Tube Heidelberg
17.10.2019
DONE
Accepted
First Test: 24.10.2019; Second Test:30.01.20
Horizontal Coating Setup
29.10.2019: Refused; Second Test: 05.02.2020
Accepted
11.02.2020
C.Schröter
Tube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
95
Wed Sep 30 13:39:48 2020
Cristina
test with bakeout
Tube CCC Cryring
30.09.2020
DONE
Accepted
5.10.20
Setup 1
07.10.20
Accepted
8.10.20
T. Sieber
61
Wed Mar 4 10:06:09 2020
Phe
leak check
Transistion tube for SIS100 string test_Second test
Beginning 2020
Delayed
February
End of February
DONE
Accepted
03.03.2020
Customised
03.03.2020
Accepted
5.03.2020
Ivan and Stefan (for integration @BNG)
41
Wed Dec 18 11:27:54 2019
Phe
leak check
Transistion tube for SIS100 string test
Beginning 2020
Delayed
February
06.02.2020
DONE
Refused
Refused
142
Mon Jul 12 13:47:03 2021
Cristina
test without bakeout
Trafos for isolation vacuum-Piotr
02.07.21
DONE
Not Needed
07.07.21
Mobile 3
12.07.21
Refused
19.08.21
P. Kowina
130
Tue May 18 14:10:04 2021
Cristina
test without bakeout
Trafos BPM
12.05.21
DONE
Not Needed
18.05.21
Customised
21.05.21
Refused
07.06.21
M.Müller
87
Mon Sep 14 10:38:59 2020
Cristina
test without bakeout
Test on Viton gasket
14.09.2020
TO DO
Not Needed
138
Thu Jun 24 12:06:49 2021
Cristina
test with bakeout
Test for polymide coated sample- Fischer
DONE
2.07.21
HEBT Setup
6.07.21
Cond. Accep.
8.07.21
L.Fischer
32
Mon Dec 2 14:28:58 2019
Cristina
General
TS1MU1-test with magnet
August 2019 delayed to KW6 2020
Delayed
Unkwon
N/A
DONE
Accepted
04.03.2020
Customised
Accepted
Grossmontage
Test bakeout inside the magnet
57
Wed Feb 19 11:42:59 2020
Cristina
pumping speed
TMP Cryring (Nikita)
KW8
On schedule
KW8
19.02.2020
DONE
Refused
9.03.2020
Fischer-Mommsen
16.03.2020
Accepted
29.05.2020
Nikita
102
Mon Nov 30 11:14:30 2020
Cristina
Coating
T-piece Cryring
Oct
KW48
DONE
Accepted
26.11.20
Horizontal Coating Setup
3.12.20
Accepted
10.12.20
Nikita
92
Mon Sep 21 11:39:27 2020
Cristina
test without bakeout
Steel with epoxy glue
August 20
Delayed
21.09.20
DONE
22.09.2020
03.10.20
Refused
?
?
7
Mon Sep 30 14:06:07 2019
Cristina
pumping speed
Slim SIP 150
9.08.2019
DONE
Accepted
07.02.2020
Fischer-Mommsen
06.03.2020
Accepted