Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 9 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
45
Thu Feb 6 10:34:00 2020
Cristina
test without bakeout
BPM 2010-15 (from the Company)
KW8
On schedule
KW8
18.02.2020
DONE
Refused
19.02.2020
Mobile 3
21.02.2020
Cond. Accep.
25.02.2020
M.Müller
46
Thu Feb 6 10:34:25 2020
Cristina
test without bakeout
BPM 2010-16 (keep in the old cryostat)
KW9
On schedule
KW9
26.02.2020
DONE
Refused
26.02.2020
Mobile 3
28.02.2020
Cond. Accep.
27.02.2020
Müller
57
Wed Feb 19 11:42:59 2020
Cristina
pumping speed
TMP Cryring (Nikita)
KW8
On schedule
KW8
19.02.2020
DONE
Refused
9.03.2020
Fischer-Mommsen
16.03.2020
Accepted
29.05.2020
Nikita
82
Fri Sep 11 09:59:20 2020
Cristina
test without bakeout
Bellows IPM SIS18
01.09.2020
DONE
Refused
02.09.2020
HEBT Setup
03.09.2020
Refused
11.09.2020
Zentrale Dienst (back to Giacomini)
97
Wed Oct 21 10:51:47 2020
Cristina
test with bakeout
IPM SIS18 mit diagnostic parts
25.09.2020
DONE
Refused
20.10.20
29.10.20
Cond. Accep.
2.11.20
Grossmontage