Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 9 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspectionup Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller    
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller    
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  82   Fri Sep 11 09:59:20 2020 Cristinatest without bakeoutBellows IPM SIS18   01.09.2020DONERefused02.09.2020HEBT Setup03.09.2020Refused11.09.2020Zentrale Dienst (back to Giacomini)    
  97   Wed Oct 21 10:51:47 2020 Cristinatest with bakeoutIPM SIS18 mit diagnostic parts   25.09.2020DONERefused20.10.20 29.10.20Cond. Accep.2.11.20Grossmontage    