Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 9 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Endedup Result Outgoing Date Taken by Text Attachments
  77   Wed Jun 17 10:13:57 2020 Cristinatest with bakeoutIPM SIS18End MayOn schedule End May (the gewind had to be redone by Pfeiffer)DONEAccepted17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20Customised31.08.20Cond. Accep.04.09.2020Back to Tino G.    
  138   Thu Jun 24 12:06:49 2021 Cristinatest with bakeoutTest for polymide coated sample- Fischer    DONE 2.07.21HEBT Setup6.07.21Cond. Accep.8.07.21L.Fischer    
  10   Wed Oct 9 08:01:51 2019 Phetest with bakeoutMacor Samples from Tino Giacomini   02.10.2019DONEAccepted10.10.2019Mobile 26.11.19Accepted8.11.19GiacominiMacor samples have been received from Tino
Giacomini on the 02.10.2019.  These Macor
samples will be used for IPM chamber.  The
  
  26   Fri Nov 22 11:10:33 2019 Phetest with bakeoutDipole Chambers for SIS100 (2box)25.11.19DelayedUnknown17.01.20DONEAccepted12.02.2020 End februarAccepted  All chambers are inserted with success into
the magnet. Leak check for: 07-6-013-3; 07-6-009-6;
07-6-011-9
  
  72   Fri Apr 24 09:56:27 2020 Cristinatest with bakeoutBe windows-SpillmanKW18On schedule 28.04.2020DONENot Needed26.05.2020Setup 2MEASUREMENTS STOPPED 02.10.20Collegue Spillman    
ELOG V3.1.5-fc6679b