Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 9 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken byup Text Attachments
  105   Tue Dec 1 11:49:07 2020 Cristinatest with bakeoutBellows IPM SIS18-Second measurement after cleaning   12.10.20DONENot Needed12.10.20HEBT Setup14.10.20Accepted15.10.20Zentrale Dienst     
  82   Fri Sep 11 09:59:20 2020 Cristinatest without bakeoutBellows IPM SIS18   01.09.2020DONERefused02.09.2020HEBT Setup03.09.2020Refused11.09.2020Zentrale Dienst (back to Giacomini)    
  78   Wed Jun 17 12:58:02 2020 Cristinatest without bakeoutSIS100 Dipole 07-6-016-4---- ------17.06.2020DONEAccepted17.06.2020HEBT Setup19.06.2020Cond. Accep.22.06.2020brought back to the TH    
  49   Thu Feb 6 12:47:18 2020 Cristinaleak checkInterconnction bellows between Dipole and QuadrupoleOctober On schedule 3.11.20DONEAccepted04.11.20Customised04.11.20Refused04.11.20in Büro of S.Wilfert    
  79   Fri Aug 28 11:51:30 2020 Phetest without bakeoutSIS100 dipole 07-00009-020-01    DONEAccepted26.08.20HEBT Setup28.08.20Refused1.09.20in the TH    
ELOG V3.1.5-fc6679b