Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken bydown Text Attachments
  79   Fri Aug 28 11:51:30 2020 Phetest without bakeoutSIS100 dipole 07-00009-020-01    DONEAccepted26.08.20HEBT Setup28.08.20Refused1.09.20in the TH    
  49   Thu Feb 6 12:47:18 2020 Cristinaleak checkInterconnction bellows between Dipole and QuadrupoleOctober On schedule 3.11.20DONEAccepted04.11.20Customised04.11.20Refused04.11.20in Büro of S.Wilfert    
  78   Wed Jun 17 12:58:02 2020 Cristinatest without bakeoutSIS100 Dipole 07-6-016-4---- ------17.06.2020DONEAccepted17.06.2020HEBT Setup19.06.2020Cond. Accep.22.06.2020brought back to the TH    
  82   Fri Sep 11 09:59:20 2020 Cristinatest without bakeoutBellows IPM SIS18   01.09.2020DONERefused02.09.2020HEBT Setup03.09.2020Refused11.09.2020Zentrale Dienst (back to Giacomini)    
  105   Tue Dec 1 11:49:07 2020 Cristinatest with bakeoutBellows IPM SIS18-Second measurement after cleaning   12.10.20DONENot Needed12.10.20HEBT Setup14.10.20Accepted15.10.20Zentrale Dienst     
  58   Tue Mar 3 09:34:40 2020 CristinaCoatingSPARC chambers June 2019DelayedFebraury 202012.02.2020DONEAccepted01.09.2020Horizontal Coating Setup03.11.20Accepted10.12.20Track to JülichHR11VU61 (21.09.20); HR18VU63 (06.10.20);
HR19VU64 (26.10.20); HR12VU62(02.11.20)
  
  70   Wed Apr 22 10:14:43 2020 Cristinatest with bakeoutCeramic Tube for Cryring (SieberKW13Delayed22.04.202024.04.2020DONENot Needed27.04.2020Setup 206.05.2020Refused8.05.2020T.Sieber    
  164   Tue Jan 18 08:51:15 2022 Cristinatest without bakeoutGrids for pLinac (Siebert)07.01.22  17.01.22DONENot Needed19.01.22HEBT Setup31.01.22Cond. Accep.31.01.22T.Sieber    
  98   Tue Nov 3 09:55:20 2020 Cristinatest with bakeoutMCPs for IPM SIS18SeptemberDelayed 2.11.20DONEAccepted2.11.20Setup 109.11.2020Cond. Accep.10.11.2020T.Giacomini    
  95   Wed Sep 30 13:39:48 2020 Cristinatest with bakeoutTube CCC Cryring   30.09.2020DONEAccepted5.10.20Setup 107.10.20Accepted8.10.20T. Sieber    
  19   Fri Nov 8 10:52:43 2019 Cristinatest with bakeoutMacor 2 for IPM   8.11.19DONEAccepted11.11.2019Mobile 218.11.2019Accepted04.12.19T. Giacomini    
  34   Wed Dec 4 10:08:42 2019 Cristinatest with bakeoutMacor 3 charge   04.12.19DONEAccepted11.02.2020Customised20.03.2020Cond. Accep.23.03.2020T. Giacomini    
  60   Tue Mar 3 13:50:28 2020 Cristinatest with bakeoutMacor 4 -IPM GiacominiKW10On schedule 03.03.2020DONENot Needed18.03.2020; 07:45 amMobile 227.03.2020Cond. Accep.11.05.2020T. Giacomini    
  75   Tue May 19 12:03:40 2020 PheProblemTurbo Pump from Thomas Seiber On schedule KW19DONENot Needed19.05.2020Customised20.05.2020Refused27.05.2020Student from T.SieberDie Pumpe hat den Fehlercode 088 und hat eine
Störung des Axiallagersensors.(checked by
Graziano)
 pump_Sieber.jpg 
  12   Mon Oct 14 10:08:14 2019 Cristinaleak checkDipole chamber SIS100 First charge   10.10.2019DONEAccepted11.10.2019Customised29.11.2019Accepted Stored in the TH6 dipole received on the KW41. Integral leak
check and 1 test without bakeout
After the
vacuum test the chambers must be inserted
  
  37   Thu Dec 12 10:19:06 2019 Cristinatest with bakeoutPumping chamber SIS100 -StefanEnd 2019DelayedBeginning202010.12.19DONEAcceptedJanuaryCustomised05.02.2020Accepted Stored in the TH    
  13   Mon Oct 14 10:09:36 2019 Cristinaleak checkRoughing CWT 3 charge   10.10.2019DONEAccepted14.10.2019Customised14.11.19Accepted Stored in WeiterstadtIntegral leak check to be done for all CWT.

DONE:
07-51-23-0; 07-51-26-1; 07-51-30-8;
07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6
 CWT.jpg 
  28   Fri Nov 22 11:11:24 2019 Pheleak check4th batch of roughing CWT for SIS100   06.01.20DONEAccepted10.02.2020Customised13.03.20Accepted Stored in Weiterstadt07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9;
07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK
WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1;
  
  38   Fri Dec 13 09:03:27 2019 Christianleak checkFasersonde Unilac   12.12.19DONEAccepted12.12.19Customised16.12.19Refused16.12.19Sthraldiagnose    
  9   Wed Oct 9 07:57:44 2019 Phetest with bakeoutCryring Detector Tube    09.10.2019DONEAccepted10.10.2019Setup 122.10.2019Accepted24.10.2019SpillmannDetector tube has been received from Grossmontage
(given to Andreas Kraemer).  This Detector
tube is for Cryring - measurement request
 20191008_094940.jpg 