Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
79
Fri Aug 28 11:51:30 2020
Phe
test without bakeout
SIS100 dipole 07-00009-020-01
DONE
Accepted
26.08.20
HEBT Setup
28.08.20
Refused
1.09.20
in the TH
49
Thu Feb 6 12:47:18 2020
Cristina
leak check
Interconnction bellows between Dipole and Quadrupole
October
On schedule
3.11.20
DONE
Accepted
04.11.20
Customised
04.11.20
Refused
04.11.20
in Büro of S.Wilfert
78
Wed Jun 17 12:58:02 2020
Cristina
test without bakeout
SIS100 Dipole 07-6-016-4
----
------
17.06.2020
DONE
Accepted
17.06.2020
HEBT Setup
19.06.2020
Cond. Accep.
22.06.2020
brought back to the TH
82
Fri Sep 11 09:59:20 2020
Cristina
test without bakeout
Bellows IPM SIS18
01.09.2020
DONE
Refused
02.09.2020
HEBT Setup
03.09.2020
Refused
11.09.2020
Zentrale Dienst (back to Giacomini)
105
Tue Dec 1 11:49:07 2020
Cristina
test with bakeout
Bellows IPM SIS18-Second measurement after cleaning
12.10.20
DONE
Not Needed
12.10.20
HEBT Setup
14.10.20
Accepted
15.10.20
Zentrale Dienst
58
Tue Mar 3 09:34:40 2020
Cristina
Coating
SPARC chambers
June 2019
Delayed
Febraury 2020
12.02.2020
DONE
Accepted
01.09.2020
Horizontal Coating Setup
03.11.20
Accepted
10.12.20
Track to Jülich
HR11VU61 (21.09.20); HR18VU63 (06.10.20);
HR19VU64 (26.10.20); HR12VU62(02.11.20)
70
Wed Apr 22 10:14:43 2020
Cristina
test with bakeout
Ceramic Tube for Cryring (Sieber
KW13
Delayed
22.04.2020
24.04.2020
DONE
Not Needed
27.04.2020
Setup 2
06.05.2020
Refused
8.05.2020
T.Sieber
164
Tue Jan 18 08:51:15 2022
Cristina
test without bakeout
Grids for pLinac (Siebert)
07.01.22
17.01.22
DONE
Not Needed
19.01.22
HEBT Setup
31.01.22
Cond. Accep.
31.01.22
T.Sieber
98
Tue Nov 3 09:55:20 2020
Cristina
test with bakeout
MCPs for IPM SIS18
September
Delayed
2.11.20
DONE
Accepted
2.11.20
Setup 1
09.11.2020
Cond. Accep.
10.11.2020
T.Giacomini
95
Wed Sep 30 13:39:48 2020
Cristina
test with bakeout
Tube CCC Cryring
30.09.2020
DONE
Accepted
5.10.20
Setup 1
07.10.20
Accepted
8.10.20
T. Sieber
19
Fri Nov 8 10:52:43 2019
Cristina
test with bakeout
Macor 2 for IPM
8.11.19
DONE
Accepted
11.11.2019
Mobile 2
18.11.2019
Accepted
04.12.19
T. Giacomini
34
Wed Dec 4 10:08:42 2019
Cristina
test with bakeout
Macor 3 charge
04.12.19
DONE
Accepted
11.02.2020
Customised
20.03.2020
Cond. Accep.
23.03.2020
T. Giacomini
60
Tue Mar 3 13:50:28 2020
Cristina
test with bakeout
Macor 4 -IPM Giacomini
KW10
On schedule
03.03.2020
DONE
Not Needed
18.03.2020; 07:45 am
Mobile 2
27.03.2020
Cond. Accep.
11.05.2020
T. Giacomini
75
Tue May 19 12:03:40 2020
Phe
Problem
Turbo Pump from Thomas Seiber
On schedule
KW19
DONE
Not Needed
19.05.2020
Customised
20.05.2020
Refused
27.05.2020
Student from T.Sieber
Die Pumpe hat den Fehlercode 088 und hat eine
Störung des Axiallagersensors.(checked by
Graziano)
12
Mon Oct 14 10:08:14 2019
Cristina
leak check
Dipole chamber SIS100 First charge
10.10.2019
DONE
Accepted
11.10.2019
Customised
29.11.2019
Accepted
Stored in the TH
6 dipole received on the KW41. Integral leak
check and 1 test without bakeout
After the
vacuum test the chambers must be inserted
37
Thu Dec 12 10:19:06 2019
Cristina
test with bakeout
Pumping chamber SIS100 -Stefan
End 2019
Delayed
Beginning2020
10.12.19
DONE
Accepted
January
Customised
05.02.2020
Accepted
Stored in the TH
13
Mon Oct 14 10:09:36 2019
Cristina
leak check
Roughing CWT 3 charge
10.10.2019
DONE
Accepted
14.10.2019
Customised
14.11.19
Accepted
Stored in Weiterstadt
Integral leak check to be done for all CWT.
DONE:
07-51-23-0; 07-51-26-1; 07-51-30-8;
07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6
28
Fri Nov 22 11:11:24 2019
Phe
leak check
4th batch of roughing CWT for SIS100
06.01.20
DONE
Accepted
10.02.2020
Customised
13.03.20
Accepted
Stored in Weiterstadt
07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9;
07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK
WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1;
38
Fri Dec 13 09:03:27 2019
Christian
leak check
Fasersonde Unilac
12.12.19
DONE
Accepted
12.12.19
Customised
16.12.19
Refused
16.12.19
Sthraldiagnose
9
Wed Oct 9 07:57:44 2019
Phe
test with bakeout
Cryring Detector Tube
09.10.2019
DONE
Accepted
10.10.2019
Setup 1
22.10.2019
Accepted
24.10.2019
Spillmann
Detector tube has been received from Grossmontage
(given to Andreas Kraemer). This Detector
tube is for Cryring - measurement request
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ELOG V3.1.5-fc6679b