Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Endeddown Result Outgoing Date Taken by Text Attachments
  72   Fri Apr 24 09:56:27 2020 Cristinatest with bakeoutBe windows-SpillmanKW18On schedule 28.04.2020DONENot Needed26.05.2020Setup 2MEASUREMENTS STOPPED 02.10.20Collegue Spillman    
  26   Fri Nov 22 11:10:33 2019 Phetest with bakeoutDipole Chambers for SIS100 (2box)25.11.19DelayedUnknown17.01.20DONEAccepted12.02.2020 End februarAccepted  All chambers are inserted with success into
the magnet. Leak check for: 07-6-013-3; 07-6-009-6;
07-6-011-9
  
  10   Wed Oct 9 08:01:51 2019 Phetest with bakeoutMacor Samples from Tino Giacomini   02.10.2019DONEAccepted10.10.2019Mobile 26.11.19Accepted8.11.19GiacominiMacor samples have been received from Tino
Giacomini on the 02.10.2019.  These Macor
samples will be used for IPM chamber.  The
  
  138   Thu Jun 24 12:06:49 2021 Cristinatest with bakeoutTest for polymide coated sample- Fischer    DONE 2.07.21HEBT Setup6.07.21Cond. Accep.8.07.21L.Fischer    
  77   Wed Jun 17 10:13:57 2020 Cristinatest with bakeoutIPM SIS18End MayOn schedule End May (the gewind had to be redone by Pfeiffer)DONEAccepted17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20Customised31.08.20Cond. Accep.04.09.2020Back to Tino G.    
  163   Tue Jan 18 08:50:13 2022 Cristinatest with bakeoutMirror chamber ESR (Brandau)   16.01.22DONENot Needed17.01.22Customised31.01.22Cond. Accep.31.01.22ESR    
  164   Tue Jan 18 08:51:15 2022 Cristinatest without bakeoutGrids for pLinac (Siebert)07.01.22  17.01.22DONENot Needed19.01.22HEBT Setup31.01.22Cond. Accep.31.01.22T.Sieber    
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage    
  74   Tue May 19 09:20:24 2020 Cristinatest with bakeoutCeramic parts Hillenbrand25.05.20On schedule 25.05.2020DONEAccepted26.05.2020Setup 130.05.2020Accepted09.06.2020Hillenbrand    
  101   Thu Nov 19 10:17:06 2020 CristinaCoatingCoating chamber Glorius   16.11.20DONEAccepted27.11.20Horizontal Coating Setup3.12.20Accepted14.12.20Glorius    
  102   Mon Nov 30 11:14:30 2020 CristinaCoatingT-piece CryringOct  KW48DONEAccepted26.11.20Horizontal Coating Setup3.12.20Accepted10.12.20Nikita    
  12   Mon Oct 14 10:08:14 2019 Cristinaleak checkDipole chamber SIS100 First charge   10.10.2019DONEAccepted11.10.2019Customised29.11.2019Accepted Stored in the TH6 dipole received on the KW41. Integral leak
check and 1 test without bakeout
After the
vacuum test the chambers must be inserted
  
  15   Mon Oct 21 10:24:59 2019 CristinaOtherTube Heidelberg   17.10.2019DONEAcceptedFirst Test: 24.10.2019; Second Test:30.01.20 Horizontal Coating Setup29.10.2019: Refused; Second Test: 05.02.2020Accepted11.02.2020C.SchröterTube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
 HD_tube.jpg 
  4   Mon Sep 30 11:15:47 2019 Cristina test with bakeoutDetector Recoil chamber ESR   2.09.2019DONEAccepted9.09.2019Customised29.10.2019Cond. Accep.1.11.19HillenbrandThe chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
 Recoil_ESR_chamber.jpg 
  96   Tue Oct 13 07:54:31 2020 Phetest without bakeoutEpoxy - baked in the oven @ 80 deg C09.10.2020On schedule 09.10.2020DONENot Needed22.10.20Mobile 229.10.20Refused      
  97   Wed Oct 21 10:51:47 2020 Cristinatest with bakeoutIPM SIS18 mit diagnostic parts   25.09.2020DONERefused20.10.20 29.10.20Cond. Accep.2.11.20Grossmontage    
  71   Wed Apr 22 13:45:53 2020 Cristinatest without bakeoutp-linac dipoles20.04.2020On schedule 20.04.2020DONEAccepted21.04.2020HEBT Setup29.04.2020Cond. Accep.27.05.2020Florian (Grossmontage)    
  127   Wed Apr 28 10:28:18 2021 Cristinatest without bakeoutCeramic for SIS100 BPM   22.03.21DONE 22.03.21Mobile 329.03.21Accepted M.Müller    
  146   Thu Aug 19 10:00:46 2021 Cristina BPM Kyocera (8 pieces)28.07.21  30.07.21DONENot Needed02.08.21Mobile 328.08.21Accepted31.08.21F.Wolf    
  79   Fri Aug 28 11:51:30 2020 Phetest without bakeoutSIS100 dipole 07-00009-020-01    DONEAccepted26.08.20HEBT Setup28.08.20Refused1.09.20in the TH    