Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
72
Fri Apr 24 09:56:27 2020
Cristina
test with bakeout
Be windows-Spillman
KW18
On schedule
28.04.2020
DONE
Not Needed
26.05.2020
Setup 2
MEASUREMENTS STOPPED
02.10.20
Collegue Spillman
26
Fri Nov 22 11:10:33 2019
Phe
test with bakeout
Dipole Chambers for SIS100 (2box)
25.11.19
Delayed
Unknown
17.01.20
DONE
Accepted
12.02.2020
End februar
Accepted
All chambers are inserted with success into
the magnet. Leak check for: 07-6-013-3; 07-6-009-6;
07-6-011-9
10
Wed Oct 9 08:01:51 2019
Phe
test with bakeout
Macor Samples from Tino Giacomini
02.10.2019
DONE
Accepted
10.10.2019
Mobile 2
6.11.19
Accepted
8.11.19
Giacomini
Macor samples have been received from Tino
Giacomini on the 02.10.2019. These Macor
samples will be used for IPM chamber. The
138
Thu Jun 24 12:06:49 2021
Cristina
test with bakeout
Test for polymide coated sample- Fischer
DONE
2.07.21
HEBT Setup
6.07.21
Cond. Accep.
8.07.21
L.Fischer
77
Wed Jun 17 10:13:57 2020
Cristina
test with bakeout
IPM SIS18
End May
On schedule
End May (the gewind had to be redone by Pfeiffer)
DONE
Accepted
17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20
Customised
31.08.20
Cond. Accep.
04.09.2020
Back to Tino G.
163
Tue Jan 18 08:50:13 2022
Cristina
test with bakeout
Mirror chamber ESR (Brandau)
16.01.22
DONE
Not Needed
17.01.22
Customised
31.01.22
Cond. Accep.
31.01.22
ESR
164
Tue Jan 18 08:51:15 2022
Cristina
test without bakeout
Grids for pLinac (Siebert)
07.01.22
17.01.22
DONE
Not Needed
19.01.22
HEBT Setup
31.01.22
Cond. Accep.
31.01.22
T.Sieber
36
Thu Dec 12 09:22:19 2019
Cristina
test without bakeout
Palmer PU Tank- Dimopoulou
January 2020
on schedule
January 2020
January 2020
DONE
Accepted
28.01.20
Customised
31.01.20
Accepted
03.02.20
Grossmontage
74
Tue May 19 09:20:24 2020
Cristina
test with bakeout
Ceramic parts Hillenbrand
25.05.20
On schedule
25.05.2020
DONE
Accepted
26.05.2020
Setup 1
30.05.2020
Accepted
09.06.2020
Hillenbrand
101
Thu Nov 19 10:17:06 2020
Cristina
Coating
Coating chamber Glorius
16.11.20
DONE
Accepted
27.11.20
Horizontal Coating Setup
3.12.20
Accepted
14.12.20
Glorius
102
Mon Nov 30 11:14:30 2020
Cristina
Coating
T-piece Cryring
Oct
KW48
DONE
Accepted
26.11.20
Horizontal Coating Setup
3.12.20
Accepted
10.12.20
Nikita
12
Mon Oct 14 10:08:14 2019
Cristina
leak check
Dipole chamber SIS100 First charge
10.10.2019
DONE
Accepted
11.10.2019
Customised
29.11.2019
Accepted
Stored in the TH
6 dipole received on the KW41. Integral leak
check and 1 test without bakeout
After the
vacuum test the chambers must be inserted
15
Mon Oct 21 10:24:59 2019
Cristina
Other
Tube Heidelberg
17.10.2019
DONE
Accepted
First Test: 24.10.2019; Second Test:30.01.20
Horizontal Coating Setup
29.10.2019: Refused; Second Test: 05.02.2020
Accepted
11.02.2020
C.Schröter
Tube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
4
Mon Sep 30 11:15:47 2019
Cristina
test with bakeout
Detector Recoil chamber ESR
2.09.2019
DONE
Accepted
9.09.2019
Customised
29.10.2019
Cond. Accep.
1.11.19
Hillenbrand
The chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
96
Tue Oct 13 07:54:31 2020
Phe
test without bakeout
Epoxy - baked in the oven @ 80 deg C
09.10.2020
On schedule
09.10.2020
DONE
Not Needed
22.10.20
Mobile 2
29.10.20
Refused
97
Wed Oct 21 10:51:47 2020
Cristina
test with bakeout
IPM SIS18 mit diagnostic parts
25.09.2020
DONE
Refused
20.10.20
29.10.20
Cond. Accep.
2.11.20
Grossmontage
71
Wed Apr 22 13:45:53 2020
Cristina
test without bakeout
p-linac dipoles
20.04.2020
On schedule
20.04.2020
DONE
Accepted
21.04.2020
HEBT Setup
29.04.2020
Cond. Accep.
27.05.2020
Florian (Grossmontage)
127
Wed Apr 28 10:28:18 2021
Cristina
test without bakeout
Ceramic for SIS100 BPM
22.03.21
DONE
22.03.21
Mobile 3
29.03.21
Accepted
M.Müller
146
Thu Aug 19 10:00:46 2021
Cristina
BPM Kyocera (8 pieces)
28.07.21
30.07.21
DONE
Not Needed
02.08.21
Mobile 3
28.08.21
Accepted
31.08.21
F.Wolf
79
Fri Aug 28 11:51:30 2020
Phe
test without bakeout
SIS100 dipole 07-00009-020-01
DONE
Accepted
26.08.20
HEBT Setup
28.08.20
Refused
1.09.20
in the TH