ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspectiondown Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  18   Fri Nov 1 10:41:45 2019 Cristinatest with bakeoutIPM Chamber   4.09.2019DONERefused   Refused1.11.19AngeloBellows to short   
  22   Fri Nov 22 11:07:36 2019 Phetest without bakeoutBeam Diagnostic Chambers from India for HEBT - small one   unknownDONERefused09.01.2020Customised10.01.2020 - still pumpingAccepted15.01.20Mahr Rainer
Inside of the chamber is dirty (black mark
when wiped with tissue).

At the moment
(16.12.2019), the chamber is under cleaning.

Chamber
  
  39   Mon Dec 16 15:27:50 2019 Phetest without bakeoutBeam Diagnostic from Inida - big one   13.13.2019 DONERefused15.01.20Customised19.01.20Accepted24.01.201M.Müller
The chamber has a dent.

At the moment
(16.12.2019), the chamber is under test for
mechanical acceptance.
  
  41   Wed Dec 18 11:27:54 2019 Pheleak checkTransistion tube for SIS100 string testBeginning 2020DelayedFebruary06.02.2020DONERefused   Refused      
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller    
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller    
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  82   Fri Sep 11 09:59:20 2020 Cristinatest without bakeoutBellows IPM SIS18   01.09.2020DONERefused02.09.2020HEBT Setup03.09.2020Refused11.09.2020Zentrale Dienst (back to Giacomini)    
  97   Wed Oct 21 10:51:47 2020 Cristinatest with bakeoutIPM SIS18 mit diagnostic parts   25.09.2020DONERefused20.10.20 29.10.20Cond. Accep.2.11.20Grossmontage    
  14   Wed Oct 16 08:24:29 2019 Tonileak checkKryokollimator June 2019DelayedAugustfrom September 2019DONENot Needed02.09.2019Customised09.12.2020Accepted  Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01;
11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9;
11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4;
 criocollimator.jpg 
  30   Thu Nov 28 11:09:29 2019 Cristinatest with bakeoutReference chamber for Grid for beam diagnostic SIS18   06.01.2020DONENot Needed09.01.2020; Setup 119.01.20Accepted--------------------    
  Draft   Thu Nov 28 11:11:16 2019 Cristinatest with bakeoutReference chamber for Monitor for beam diagnostic   09.01.2020on-goingNot Needed08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 amSetup 2        
  35   Thu Dec 12 09:20:54 2019 Cristinatest with bakeoutIPM SIS100-GiacominiJannuary 2020DelayedUnknown21.04.2020DONENot Needed04.05.2020Customised15.05.2020AcceptedMai/JuniBrough to the TH    
  40   Tue Dec 17 13:39:20 2019 Pheleak checkFasersonde Unilac -2 test   17.12.2019DONENot Needed17.12.2019Customised17.12.2019Accepted20.12.2019Beam diagnosticThis phase probe was tested by Christian Kolligs
on the 12.12.2019 and it has leak rate of
1E-6 mbar.l/s.
 20191217_134243.jpg 
  48   Thu Feb 6 12:45:52 2020 Cristinatest without bakeoutProtoype BV CWTMarchOn schedule 26.08.20DONENot Needed14.09.20Customised21.09.20Accepted22.09.20S. Wilfert    
  53   Tue Feb 11 09:57:17 2020 Cristinatest with bakeoutSIS100 diagnostic chambersJune 2020Delayed 17.11.2020DONENot Needed17.11.20Customised25.11.20Cond. Accep.01.12.20GrossmontageThere are a total of 6 chambers. We have to
do leak check to all 6, and a complete SAT
(with bakeout) to 1 chamber
  
  55   Fri Feb 14 13:34:54 2020 Cristinatest with bakeoutBerrilium Copper Stripes Dermati14.02.2020On schedule14.02.202014.02.2020DONENot Needed17.02.2020; 11:30 amSetup 124.02.2020Cond. Accep.26.02.2020Bardonner    
  59   Tue Mar 3 09:58:03 2020 Cristinatest with bakeoutFerrite RI (as received)15.MarchOn schedule 20.03.2020DONENot Needed23.03.2020Setup 127.03.2020Cond. Accep.-----------------    
  60   Tue Mar 3 13:50:28 2020 Cristinatest with bakeoutMacor 4 -IPM GiacominiKW10On schedule 03.03.2020DONENot Needed18.03.2020; 07:45 amMobile 227.03.2020Cond. Accep.11.05.2020T. Giacomini    
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller    