ID Date Author Category Subject Expecteddown Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  51   Tue Feb 11 09:53:14 2020 Cristinaleak checkSIS100 Sextupole (6)September 2020Delayed              
  52   Tue Feb 11 09:54:49 2020 Cristinatest with bakeoutSIS100 Injection Kicker September 2020Delayed              
  98   Tue Nov 3 09:55:20 2020 Cristinatest with bakeoutMCPs for IPM SIS18SeptemberDelayed 2.11.20DONEAccepted2.11.20Setup 109.11.2020Cond. Accep.10.11.2020T.Giacomini    
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller    
  64   Thu Mar 12 13:49:09 2020 Phetest without bakeoutBPM SIS100 2010-17 (ceramic only)ReceivedOn schedule 12.03.2020DONENot Needed18.03.2020; 08:25Setup 119.03.2020; 11:00Cond. Accep.19.03.2020M.Müller    
  49   Thu Feb 6 12:47:18 2020 Cristinaleak checkInterconnction bellows between Dipole and QuadrupoleOctober On schedule 3.11.20DONEAccepted04.11.20Customised04.11.20Refused04.11.20in Büro of S.Wilfert    
  102   Mon Nov 30 11:14:30 2020 CristinaCoatingT-piece CryringOct  KW48DONEAccepted26.11.20Horizontal Coating Setup3.12.20Accepted10.12.20Nikita    
  50   Thu Feb 6 12:48:46 2020 Cristinaleak check30 SIS 100 pumping chambersMay 20DelayedDecember 20         1 chamber required: acceptance test without
bakeout
  
  47   Thu Feb 6 11:11:21 2020 CristinaGeneralIn kind contribution Sweden -NikoMarch 2020On schedule              
  54   Tue Feb 11 09:59:48 2020 Cristinaleak checkSIS100 Quadrupole chambersMarch 2020DelayedSeptember 20September 20DONEAccepted30.09.20HEBT Setup06.10.20Accepted8.10.20I.Pongrac    
  48   Thu Feb 6 12:45:52 2020 Cristinatest without bakeoutProtoype BV CWTMarchOn schedule 26.08.20DONENot Needed14.09.20Customised21.09.20Accepted22.09.20S. Wilfert    
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller    
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller    
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  44   Thu Feb 6 10:33:17 2020 Cristinatest without bakeoutBPM 2010-17 (keept in the new cryostat)KW7On scheduleKW710.02.2020DONEAccepted12.02.2020Mobile 314.02.2020Refused18.02.2020M.Müller    
  43   Mon Jan 20 10:40:00 2020 Cristinatest with bakeoutCeramic Tube Diagnostic-Dorn 06-004-01376-3KW4On scheduleKW420.01.20DONEAccepted21.01.2020Setup 127.01.20Accepted29.01.20M.Müller    
  90   Mon Sep 21 11:31:47 2020 Cristinatest without bakeoutHEBT BPMKW39On schedule 28.09.20on-goingAccepted05.10.20. Test started again: 08.12.20Mobile 3 Refused  Since 19. Okt we wait for the decision of
the diagnostic group on how(who has to clean
the BPM. Since then the test is stopped.
Meeting
  
  137   Thu Jun 24 12:05:07 2021 Cristinatest with bakeoutBearings for HEBT-foil-stripper -ZellerKW26  01.07.21DONENot Needed14.07.21Mobile 205.08.21Refused      
  135   Tue Jun 8 10:28:46 2021 Cristinatest with bakeoutPockets for ESRKW25  21.06.21DONENot Needed24.06.21Setup 112.07.21Accepted19.07.21Glorious    
  72   Fri Apr 24 09:56:27 2020 Cristinatest with bakeoutBe windows-SpillmanKW18On schedule 28.04.2020DONENot Needed26.05.2020Setup 2MEASUREMENTS STOPPED 02.10.20Collegue Spillman    