  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Starteddown Setup Test Ended Result Outgoing Date Taken by Text Attachments
  88   Tue Sep 15 11:14:44 2020 Cristinaleak checkSIS100 Dipole chambers    on-going July 2019Customised    07-00006-001-0; 07-00006-002-7; 07-00006-003-4;
07-00006-004-1; 07-00006-005-8; 07-00006-006-5;
07-00006-007-2; 07-00006-009-6; 07-00006-010-2;
  
  37   Thu Dec 12 10:19:06 2019 Cristinatest with bakeoutPumping chamber SIS100 -StefanEnd 2019DelayedBeginning202010.12.19DONEAcceptedJanuaryCustomised05.02.2020Accepted Stored in the TH    
  15   Mon Oct 21 10:24:59 2019 CristinaOtherTube Heidelberg   17.10.2019DONEAcceptedFirst Test: 24.10.2019; Second Test:30.01.20 Horizontal Coating Setup29.10.2019: Refused; Second Test: 05.02.2020Accepted11.02.2020C.SchröterTube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
 HD_tube.jpg 
  4   Mon Sep 30 11:15:47 2019 Cristina test with bakeoutDetector Recoil chamber ESR   2.09.2019DONEAccepted9.09.2019Customised29.10.2019Cond. Accep.1.11.19HillenbrandThe chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
 Recoil_ESR_chamber.jpg 
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  154   Wed Nov 17 11:46:15 2021 Cristinatest with bakeoutCoated Al sheet metall bent (Brandau)   5.11.21DONENot Needed8.11.21Setup 115.11.21Cond. Accep.03.02.22R.Sanchez    
  86   Mon Sep 14 09:16:54 2020 Cristinatest with bakeoutMirror Laser cooling SIS100   14.09.2020DONEAccepted6.10.20Mobile 221.10.20Cond. Accep.KW47D.Winters    
  95   Wed Sep 30 13:39:48 2020 Cristinatest with bakeoutTube CCC Cryring   30.09.2020DONEAccepted5.10.20Setup 107.10.20Accepted8.10.20T. Sieber    
  81   Fri Sep 11 09:56:40 2020 Cristinatest without bakeoutBPM SIS100 X2010-63    DONEAccepted31.08.2020Mobile 301.09.20Accepted09.09.20S. Fiedler    
  54   Tue Feb 11 09:59:48 2020 Cristinaleak checkSIS100 Quadrupole chambersMarch 2020DelayedSeptember 20September 20DONEAccepted30.09.20HEBT Setup06.10.20Accepted8.10.20I.Pongrac    
  3   Mon Sep 30 11:11:26 2019 Cristinatest with bakeoutLaser chamber -WintersBeginning 2019Delayed 16.08.2019DONEAccepted30.08.2019Customised12.02.2020AcceptedKW10D.Winters
The measurement was stopped because of the
wrong heating jackets
 Laser_chamber.jpg 
  103   Mon Nov 30 11:15:48 2020 Cristinatest with bakeoutAntrieb for ESR-Beata1 Dec.Delayed?3.12.20DONENot Needed3.12.20Setup 110.12.2020Accepted11.12.20Müller    
  168   Fri Feb 25 09:37:36 2022 Cristinatest without bakeout2 BMP   23.02.22DONE 28.02.22Mobile 304.03.22Accepted04.03.22M.Müller    
  110   Fri Jan 29 11:54:20 2021 Cristinaleak checkGate Valve   14.01.21DONEAccepted28.01.21Customised28.01.21Refused29.01.21A.Tauschwitz    
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage    
  101   Thu Nov 19 10:17:06 2020 CristinaCoatingCoating chamber Glorius   16.11.20DONEAccepted27.11.20Horizontal Coating Setup3.12.20Accepted14.12.20Glorius    
  70   Wed Apr 22 10:14:43 2020 Cristinatest with bakeoutCeramic Tube for Cryring (SieberKW13Delayed22.04.202024.04.2020DONENot Needed27.04.2020Setup 206.05.2020Refused8.05.2020T.Sieber    
  102   Mon Nov 30 11:14:30 2020 CristinaCoatingT-piece CryringOct  KW48DONEAccepted26.11.20Horizontal Coating Setup3.12.20Accepted10.12.20Nikita    
  79   Fri Aug 28 11:51:30 2020 Phetest without bakeoutSIS100 dipole 07-00009-020-01    DONEAccepted26.08.20HEBT Setup28.08.20Refused1.09.20in the TH    
  80   Fri Aug 28 11:52:43 2020 Phetest without bakeoutBPM SIS100 2010-61   26.08.20DONEAccepted26.08.20Mobile 328.08.20Cond. Accep.09.09.20S. Fiedler    