Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
88
Tue Sep 15 11:14:44 2020
Cristina
leak check
SIS100 Dipole chambers
on-going
July 2019
Customised
07-00006-001-0; 07-00006-002-7; 07-00006-003-4;
07-00006-004-1; 07-00006-005-8; 07-00006-006-5;
07-00006-007-2; 07-00006-009-6; 07-00006-010-2;
37
Thu Dec 12 10:19:06 2019
Cristina
test with bakeout
Pumping chamber SIS100 -Stefan
End 2019
Delayed
Beginning2020
10.12.19
DONE
Accepted
January
Customised
05.02.2020
Accepted
Stored in the TH
15
Mon Oct 21 10:24:59 2019
Cristina
Other
Tube Heidelberg
17.10.2019
DONE
Accepted
First Test: 24.10.2019; Second Test:30.01.20
Horizontal Coating Setup
29.10.2019: Refused; Second Test: 05.02.2020
Accepted
11.02.2020
C.Schröter
Tube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
4
Mon Sep 30 11:15:47 2019
Cristina
test with bakeout
Detector Recoil chamber ESR
2.09.2019
DONE
Accepted
9.09.2019
Customised
29.10.2019
Cond. Accep.
1.11.19
Hillenbrand
The chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
57
Wed Feb 19 11:42:59 2020
Cristina
pumping speed
TMP Cryring (Nikita)
KW8
On schedule
KW8
19.02.2020
DONE
Refused
9.03.2020
Fischer-Mommsen
16.03.2020
Accepted
29.05.2020
Nikita
154
Wed Nov 17 11:46:15 2021
Cristina
test with bakeout
Coated Al sheet metall bent (Brandau)
5.11.21
DONE
Not Needed
8.11.21
Setup 1
15.11.21
Cond. Accep.
03.02.22
R.Sanchez
86
Mon Sep 14 09:16:54 2020
Cristina
test with bakeout
Mirror Laser cooling SIS100
14.09.2020
DONE
Accepted
6.10.20
Mobile 2
21.10.20
Cond. Accep.
KW47
D.Winters
95
Wed Sep 30 13:39:48 2020
Cristina
test with bakeout
Tube CCC Cryring
30.09.2020
DONE
Accepted
5.10.20
Setup 1
07.10.20
Accepted
8.10.20
T. Sieber
81
Fri Sep 11 09:56:40 2020
Cristina
test without bakeout
BPM SIS100 X2010-63
DONE
Accepted
31.08.2020
Mobile 3
01.09.20
Accepted
09.09.20
S. Fiedler
54
Tue Feb 11 09:59:48 2020
Cristina
leak check
SIS100 Quadrupole chambers
March 2020
Delayed
September 20
September 20
DONE
Accepted
30.09.20
HEBT Setup
06.10.20
Accepted
8.10.20
I.Pongrac
3
Mon Sep 30 11:11:26 2019
Cristina
test with bakeout
Laser chamber -Winters
Beginning 2019
Delayed
16.08.2019
DONE
Accepted
30.08.2019
Customised
12.02.2020
Accepted
KW10
D.Winters
The measurement was stopped because of the
wrong heating jackets
103
Mon Nov 30 11:15:48 2020
Cristina
test with bakeout
Antrieb for ESR-Beata
1 Dec.
Delayed
?
3.12.20
DONE
Not Needed
3.12.20
Setup 1
10.12.2020
Accepted
11.12.20
Müller
168
Fri Feb 25 09:37:36 2022
Cristina
test without bakeout
2 BMP
23.02.22
DONE
28.02.22
Mobile 3
04.03.22
Accepted
04.03.22
M.Müller
110
Fri Jan 29 11:54:20 2021
Cristina
leak check
Gate Valve
14.01.21
DONE
Accepted
28.01.21
Customised
28.01.21
Refused
29.01.21
A.Tauschwitz
36
Thu Dec 12 09:22:19 2019
Cristina
test without bakeout
Palmer PU Tank- Dimopoulou
January 2020
on schedule
January 2020
January 2020
DONE
Accepted
28.01.20
Customised
31.01.20
Accepted
03.02.20
Grossmontage
101
Thu Nov 19 10:17:06 2020
Cristina
Coating
Coating chamber Glorius
16.11.20
DONE
Accepted
27.11.20
Horizontal Coating Setup
3.12.20
Accepted
14.12.20
Glorius
70
Wed Apr 22 10:14:43 2020
Cristina
test with bakeout
Ceramic Tube for Cryring (Sieber
KW13
Delayed
22.04.2020
24.04.2020
DONE
Not Needed
27.04.2020
Setup 2
06.05.2020
Refused
8.05.2020
T.Sieber
102
Mon Nov 30 11:14:30 2020
Cristina
Coating
T-piece Cryring
Oct
KW48
DONE
Accepted
26.11.20
Horizontal Coating Setup
3.12.20
Accepted
10.12.20
Nikita
79
Fri Aug 28 11:51:30 2020
Phe
test without bakeout
SIS100 dipole 07-00009-020-01
DONE
Accepted
26.08.20
HEBT Setup
28.08.20
Refused
1.09.20
in the TH
80
Fri Aug 28 11:52:43 2020
Phe
test without bakeout
BPM SIS100 2010-61
26.08.20
DONE
Accepted
26.08.20
Mobile 3
28.08.20
Cond. Accep.
09.09.20
S. Fiedler
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All