ID Date Author Categorydown Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  20   Mon Nov 11 08:06:09 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator (Hackhalle)   unknownDONEAccepted11.11.2019; 10:15 am, stopped 12.11.2019Customised Refused  Broken gauge (cold cathode gauge).     
  21   Thu Nov 14 14:00:28 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator   unknownDONEAccepted14.11.2019; 10:30 amCustomised22.11.2019Cond. Accep.N/AN/AWide range gauge is now installed on the chamber.
 The previous test with cold cathode gauge
failed due to broken gauge.  

Another
  
  22   Fri Nov 22 11:07:36 2019 Phetest without bakeoutBeam Diagnostic Chambers from India for HEBT - small one   unknownDONERefused09.01.2020Customised10.01.2020 - still pumpingAccepted15.01.20Mahr Rainer
Inside of the chamber is dirty (black mark
when wiped with tissue).

At the moment
(16.12.2019), the chamber is under cleaning.

Chamber
  
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage    
  39   Mon Dec 16 15:27:50 2019 Phetest without bakeoutBeam Diagnostic from Inida - big one   13.13.2019 DONERefused15.01.20Customised19.01.20Accepted24.01.201M.Müller
The chamber has a dent.

At the moment
(16.12.2019), the chamber is under test for
mechanical acceptance.
  
  42   Thu Jan 16 09:05:12 2020 Cristinatest without bakeoutBPM SIS100- 2010-327.01.20Delayed30.01.2030.01.20DONEAccepted03.02.2020Customised05.02.2020Refused10.02.2020M.Müller
New mobile pumping station - the controller
for the IMG did not work.  The pressure is
recorded from the gauge controller of Mobile
  
  44   Thu Feb 6 10:33:17 2020 Cristinatest without bakeoutBPM 2010-17 (keept in the new cryostat)KW7On scheduleKW710.02.2020DONEAccepted12.02.2020Mobile 314.02.2020Refused18.02.2020M.Müller    
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller    
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller    
  48   Thu Feb 6 12:45:52 2020 Cristinatest without bakeoutProtoype BV CWTMarchOn schedule 26.08.20DONENot Needed14.09.20Customised21.09.20Accepted22.09.20S. Wilfert    
  62   Mon Mar 9 08:46:22 2020 Phetest without bakeoutBPM SIS100 2010-3, repeat after long pumping @ Hackhalle On schedule 06.03.2020DONEAccepted09.03.2020; 07:00 amMobile 310.03.2020Accepted12.03.2020M.Müller    
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller    
  64   Thu Mar 12 13:49:09 2020 Phetest without bakeoutBPM SIS100 2010-17 (ceramic only)ReceivedOn schedule 12.03.2020DONENot Needed18.03.2020; 08:25Setup 119.03.2020; 11:00Cond. Accep.19.03.2020M.Müller    
  66   Thu Mar 19 11:23:38 2020 Phetest without bakeoutBPM SIS100 2010-15 (after cryo) On schedule 19.03.2020DONENot Needed19.03.2020; 15:00Mobile 325.03.2020Cond. Accep.26.03.2020M.Müller    
  67   Wed Mar 25 14:22:40 2020 Phetest without bakeoutBroken ceramic for BPM On schedule 25.03.2020DONENot Needed26.03.2020Setup 227.03.2020Cond. Accep.28.03.2020M.Müller    
  69   Wed Apr 22 08:35:13 2020 Phetest without bakeoutBPM 2010-15 - 2 weeks pump down in Hackhalle On schedule 21.04.2020DONENot Needed21.04.2020; 17:00Mobile 324.04.2020Accepted23.04.20M.Müller    
  71   Wed Apr 22 13:45:53 2020 Cristinatest without bakeoutp-linac dipoles20.04.2020On schedule 20.04.2020DONEAccepted21.04.2020HEBT Setup29.04.2020Cond. Accep.27.05.2020Florian (Grossmontage)    
  76   Wed May 27 10:34:37 2020 Phetest without bakeoutBPM SIS100 X2010-16   KW21DONENot Needed20.05.2020Customised22.05.2020Cond. Accep.26.08.20M.Müller    
  78   Wed Jun 17 12:58:02 2020 Cristinatest without bakeoutSIS100 Dipole 07-6-016-4---- ------17.06.2020DONEAccepted17.06.2020HEBT Setup19.06.2020Cond. Accep.22.06.2020brought back to the TH    
  79   Fri Aug 28 11:51:30 2020 Phetest without bakeoutSIS100 dipole 07-00009-020-01    DONEAccepted26.08.20HEBT Setup28.08.20Refused1.09.20in the TH    