Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
20
Mon Nov 11 08:06:09 2019
Phe
test without bakeout
Ref. Chamber for Beam Diagnostic Manipulator (Hackhalle)
unknown
DONE
Accepted
11.11.2019; 10:15 am, stopped 12.11.2019
Customised
Refused
Broken gauge (cold cathode gauge).
21
Thu Nov 14 14:00:28 2019
Phe
test without bakeout
Ref. Chamber for Beam Diagnostic Manipulator
unknown
DONE
Accepted
14.11.2019; 10:30 am
Customised
22.11.2019
Cond. Accep.
N/A
N/A
Wide range gauge is now installed on the chamber.
The previous test with cold cathode gauge
failed due to broken gauge.
Another
22
Fri Nov 22 11:07:36 2019
Phe
test without bakeout
Beam Diagnostic Chambers from India for HEBT - small one
unknown
DONE
Refused
09.01.2020
Customised
10.01.2020 - still pumping
Accepted
15.01.20
Mahr Rainer
Inside of the chamber is dirty (black mark
when wiped with tissue).
At the moment
(16.12.2019), the chamber is under cleaning.
Chamber
36
Thu Dec 12 09:22:19 2019
Cristina
test without bakeout
Palmer PU Tank- Dimopoulou
January 2020
on schedule
January 2020
January 2020
DONE
Accepted
28.01.20
Customised
31.01.20
Accepted
03.02.20
Grossmontage
39
Mon Dec 16 15:27:50 2019
Phe
test without bakeout
Beam Diagnostic from Inida - big one
13.13.2019
DONE
Refused
15.01.20
Customised
19.01.20
Accepted
24.01.201
M.Müller
The chamber has a dent.
At the moment
(16.12.2019), the chamber is under test for
mechanical acceptance.
42
Thu Jan 16 09:05:12 2020
Cristina
test without bakeout
BPM SIS100- 2010-3
27.01.20
Delayed
30.01.20
30.01.20
DONE
Accepted
03.02.2020
Customised
05.02.2020
Refused
10.02.2020
M.Müller
New mobile pumping station - the controller
for the IMG did not work. The pressure is
recorded from the gauge controller of Mobile
44
Thu Feb 6 10:33:17 2020
Cristina
test without bakeout
BPM 2010-17 (keept in the new cryostat)
KW7
On schedule
KW7
10.02.2020
DONE
Accepted
12.02.2020
Mobile 3
14.02.2020
Refused
18.02.2020
M.Müller
45
Thu Feb 6 10:34:00 2020
Cristina
test without bakeout
BPM 2010-15 (from the Company)
KW8
On schedule
KW8
18.02.2020
DONE
Refused
19.02.2020
Mobile 3
21.02.2020
Cond. Accep.
25.02.2020
M.Müller
46
Thu Feb 6 10:34:25 2020
Cristina
test without bakeout
BPM 2010-16 (keep in the old cryostat)
KW9
On schedule
KW9
26.02.2020
DONE
Refused
26.02.2020
Mobile 3
28.02.2020
Cond. Accep.
27.02.2020
Müller
48
Thu Feb 6 12:45:52 2020
Cristina
test without bakeout
Protoype BV CWT
March
On schedule
26.08.20
DONE
Not Needed
14.09.20
Customised
21.09.20
Accepted
22.09.20
S. Wilfert
62
Mon Mar 9 08:46:22 2020
Phe
test without bakeout
BPM SIS100 2010-3, repeat after long pumping @ Hackhalle
On schedule
06.03.2020
DONE
Accepted
09.03.2020; 07:00 am
Mobile 3
10.03.2020
Accepted
12.03.2020
M.Müller
63
Thu Mar 12 13:47:38 2020
Phe
test without bakeout
BPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)
Received
On schedule
12.03.2020
DONE
Not Needed
12.03.2020; 11:55 am
Mobile 3
17.03.2020; 11:00 am
Accepted
19.03.2020
M.Müller
64
Thu Mar 12 13:49:09 2020
Phe
test without bakeout
BPM SIS100 2010-17 (ceramic only)
Received
On schedule
12.03.2020
DONE
Not Needed
18.03.2020; 08:25
Setup 1
19.03.2020; 11:00
Cond. Accep.
19.03.2020
M.Müller
66
Thu Mar 19 11:23:38 2020
Phe
test without bakeout
BPM SIS100 2010-15 (after cryo)
On schedule
19.03.2020
DONE
Not Needed
19.03.2020; 15:00
Mobile 3
25.03.2020
Cond. Accep.
26.03.2020
M.Müller
67
Wed Mar 25 14:22:40 2020
Phe
test without bakeout
Broken ceramic for BPM
On schedule
25.03.2020
DONE
Not Needed
26.03.2020
Setup 2
27.03.2020
Cond. Accep.
28.03.2020
M.Müller
69
Wed Apr 22 08:35:13 2020
Phe
test without bakeout
BPM 2010-15 - 2 weeks pump down in Hackhalle
On schedule
21.04.2020
DONE
Not Needed
21.04.2020; 17:00
Mobile 3
24.04.2020
Accepted
23.04.20
M.Müller
71
Wed Apr 22 13:45:53 2020
Cristina
test without bakeout
p-linac dipoles
20.04.2020
On schedule
20.04.2020
DONE
Accepted
21.04.2020
HEBT Setup
29.04.2020
Cond. Accep.
27.05.2020
Florian (Grossmontage)
76
Wed May 27 10:34:37 2020
Phe
test without bakeout
BPM SIS100 X2010-16
KW21
DONE
Not Needed
20.05.2020
Customised
22.05.2020
Cond. Accep.
26.08.20
M.Müller
78
Wed Jun 17 12:58:02 2020
Cristina
test without bakeout
SIS100 Dipole 07-6-016-4
----
------
17.06.2020
DONE
Accepted
17.06.2020
HEBT Setup
19.06.2020
Cond. Accep.
22.06.2020
brought back to the TH
79
Fri Aug 28 11:51:30 2020
Phe
test without bakeout
SIS100 dipole 07-00009-020-01
DONE
Accepted
26.08.20
HEBT Setup
28.08.20
Refused
1.09.20
in the TH
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All