  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Statusdown New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage    
  43   Mon Jan 20 10:40:00 2020 Cristinatest with bakeoutCeramic Tube Diagnostic-Dorn 06-004-01376-3KW4On scheduleKW420.01.20DONEAccepted21.01.2020Setup 127.01.20Accepted29.01.20M.Müller    
  44   Thu Feb 6 10:33:17 2020 Cristinatest without bakeoutBPM 2010-17 (keept in the new cryostat)KW7On scheduleKW710.02.2020DONEAccepted12.02.2020Mobile 314.02.2020Refused18.02.2020M.Müller    
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller    
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller    
  47   Thu Feb 6 11:11:21 2020 CristinaGeneralIn kind contribution Sweden -NikoMarch 2020On schedule              
  48   Thu Feb 6 12:45:52 2020 Cristinatest without bakeoutProtoype BV CWTMarchOn schedule 26.08.20DONENot Needed14.09.20Customised21.09.20Accepted22.09.20S. Wilfert    
  49   Thu Feb 6 12:47:18 2020 Cristinaleak checkInterconnction bellows between Dipole and QuadrupoleOctober On schedule 3.11.20DONEAccepted04.11.20Customised04.11.20Refused04.11.20in Büro of S.Wilfert    
  55   Fri Feb 14 13:34:54 2020 Cristinatest with bakeoutBerrilium Copper Stripes Dermati14.02.2020On schedule14.02.202014.02.2020DONENot Needed17.02.2020; 11:30 amSetup 124.02.2020Cond. Accep.26.02.2020Bardonner    
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  59   Tue Mar 3 09:58:03 2020 Cristinatest with bakeoutFerrite RI (as received)15.MarchOn schedule 20.03.2020DONENot Needed23.03.2020Setup 127.03.2020Cond. Accep.-----------------    
  60   Tue Mar 3 13:50:28 2020 Cristinatest with bakeoutMacor 4 -IPM GiacominiKW10On schedule 03.03.2020DONENot Needed18.03.2020; 07:45 amMobile 227.03.2020Cond. Accep.11.05.2020T. Giacomini    
  62   Mon Mar 9 08:46:22 2020 Phetest without bakeoutBPM SIS100 2010-3, repeat after long pumping @ Hackhalle On schedule 06.03.2020DONEAccepted09.03.2020; 07:00 amMobile 310.03.2020Accepted12.03.2020M.Müller    
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller    
  64   Thu Mar 12 13:49:09 2020 Phetest without bakeoutBPM SIS100 2010-17 (ceramic only)ReceivedOn schedule 12.03.2020DONENot Needed18.03.2020; 08:25Setup 119.03.2020; 11:00Cond. Accep.19.03.2020M.Müller    
  66   Thu Mar 19 11:23:38 2020 Phetest without bakeoutBPM SIS100 2010-15 (after cryo) On schedule 19.03.2020DONENot Needed19.03.2020; 15:00Mobile 325.03.2020Cond. Accep.26.03.2020M.Müller    
  67   Wed Mar 25 14:22:40 2020 Phetest without bakeoutBroken ceramic for BPM On schedule 25.03.2020DONENot Needed26.03.2020Setup 227.03.2020Cond. Accep.28.03.2020M.Müller    
  68   Mon Apr 6 15:33:45 2020 Phetest with bakeoutUnbaked Ferrites from RI (bigger size) On schedule 06.04.2020DONENot Needed Setup 122.04.2020Cond. Accep.      
  69   Wed Apr 22 08:35:13 2020 Phetest without bakeoutBPM 2010-15 - 2 weeks pump down in Hackhalle On schedule 21.04.2020DONENot Needed21.04.2020; 17:00Mobile 324.04.2020Accepted23.04.20M.Müller    
  71   Wed Apr 22 13:45:53 2020 Cristinatest without bakeoutp-linac dipoles20.04.2020On schedule 20.04.2020DONEAccepted21.04.2020HEBT Setup29.04.2020Cond. Accep.27.05.2020Florian (Grossmontage)    