Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
36
Thu Dec 12 09:22:19 2019
Cristina
test without bakeout
Palmer PU Tank- Dimopoulou
January 2020
on schedule
January 2020
January 2020
DONE
Accepted
28.01.20
Customised
31.01.20
Accepted
03.02.20
Grossmontage
43
Mon Jan 20 10:40:00 2020
Cristina
test with bakeout
Ceramic Tube Diagnostic-Dorn 06-004-01376-3
KW4
On schedule
KW4
20.01.20
DONE
Accepted
21.01.2020
Setup 1
27.01.20
Accepted
29.01.20
M.Müller
44
Thu Feb 6 10:33:17 2020
Cristina
test without bakeout
BPM 2010-17 (keept in the new cryostat)
KW7
On schedule
KW7
10.02.2020
DONE
Accepted
12.02.2020
Mobile 3
14.02.2020
Refused
18.02.2020
M.Müller
45
Thu Feb 6 10:34:00 2020
Cristina
test without bakeout
BPM 2010-15 (from the Company)
KW8
On schedule
KW8
18.02.2020
DONE
Refused
19.02.2020
Mobile 3
21.02.2020
Cond. Accep.
25.02.2020
M.Müller
46
Thu Feb 6 10:34:25 2020
Cristina
test without bakeout
BPM 2010-16 (keep in the old cryostat)
KW9
On schedule
KW9
26.02.2020
DONE
Refused
26.02.2020
Mobile 3
28.02.2020
Cond. Accep.
27.02.2020
Müller
47
Thu Feb 6 11:11:21 2020
Cristina
General
In kind contribution Sweden -Niko
March 2020
On schedule
48
Thu Feb 6 12:45:52 2020
Cristina
test without bakeout
Protoype BV CWT
March
On schedule
26.08.20
DONE
Not Needed
14.09.20
Customised
21.09.20
Accepted
22.09.20
S. Wilfert
49
Thu Feb 6 12:47:18 2020
Cristina
leak check
Interconnction bellows between Dipole and Quadrupole
October
On schedule
3.11.20
DONE
Accepted
04.11.20
Customised
04.11.20
Refused
04.11.20
in Büro of S.Wilfert
55
Fri Feb 14 13:34:54 2020
Cristina
test with bakeout
Berrilium Copper Stripes Dermati
14.02.2020
On schedule
14.02.2020
14.02.2020
DONE
Not Needed
17.02.2020; 11:30 am
Setup 1
24.02.2020
Cond. Accep.
26.02.2020
Bardonner
57
Wed Feb 19 11:42:59 2020
Cristina
pumping speed
TMP Cryring (Nikita)
KW8
On schedule
KW8
19.02.2020
DONE
Refused
9.03.2020
Fischer-Mommsen
16.03.2020
Accepted
29.05.2020
Nikita
59
Tue Mar 3 09:58:03 2020
Cristina
test with bakeout
Ferrite RI (as received)
15.March
On schedule
20.03.2020
DONE
Not Needed
23.03.2020
Setup 1
27.03.2020
Cond. Accep.
--------
---------
60
Tue Mar 3 13:50:28 2020
Cristina
test with bakeout
Macor 4 -IPM Giacomini
KW10
On schedule
03.03.2020
DONE
Not Needed
18.03.2020; 07:45 am
Mobile 2
27.03.2020
Cond. Accep.
11.05.2020
T. Giacomini
62
Mon Mar 9 08:46:22 2020
Phe
test without bakeout
BPM SIS100 2010-3, repeat after long pumping @ Hackhalle
On schedule
06.03.2020
DONE
Accepted
09.03.2020; 07:00 am
Mobile 3
10.03.2020
Accepted
12.03.2020
M.Müller
63
Thu Mar 12 13:47:38 2020
Phe
test without bakeout
BPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)
Received
On schedule
12.03.2020
DONE
Not Needed
12.03.2020; 11:55 am
Mobile 3
17.03.2020; 11:00 am
Accepted
19.03.2020
M.Müller
64
Thu Mar 12 13:49:09 2020
Phe
test without bakeout
BPM SIS100 2010-17 (ceramic only)
Received
On schedule
12.03.2020
DONE
Not Needed
18.03.2020; 08:25
Setup 1
19.03.2020; 11:00
Cond. Accep.
19.03.2020
M.Müller
66
Thu Mar 19 11:23:38 2020
Phe
test without bakeout
BPM SIS100 2010-15 (after cryo)
On schedule
19.03.2020
DONE
Not Needed
19.03.2020; 15:00
Mobile 3
25.03.2020
Cond. Accep.
26.03.2020
M.Müller
67
Wed Mar 25 14:22:40 2020
Phe
test without bakeout
Broken ceramic for BPM
On schedule
25.03.2020
DONE
Not Needed
26.03.2020
Setup 2
27.03.2020
Cond. Accep.
28.03.2020
M.Müller
68
Mon Apr 6 15:33:45 2020
Phe
test with bakeout
Unbaked Ferrites from RI (bigger size)
On schedule
06.04.2020
DONE
Not Needed
Setup 1
22.04.2020
Cond. Accep.
69
Wed Apr 22 08:35:13 2020
Phe
test without bakeout
BPM 2010-15 - 2 weeks pump down in Hackhalle
On schedule
21.04.2020
DONE
Not Needed
21.04.2020; 17:00
Mobile 3
24.04.2020
Accepted
23.04.20
M.Müller
71
Wed Apr 22 13:45:53 2020
Cristina
test without bakeout
p-linac dipoles
20.04.2020
On schedule
20.04.2020
DONE
Accepted
21.04.2020
HEBT Setup
29.04.2020
Cond. Accep.
27.05.2020
Florian (Grossmontage)
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All