Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Receiveddown Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  20   Mon Nov 11 08:06:09 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator (Hackhalle)   unknownDONEAccepted11.11.2019; 10:15 am, stopped 12.11.2019Customised Refused  Broken gauge (cold cathode gauge).     
  21   Thu Nov 14 14:00:28 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator   unknownDONEAccepted14.11.2019; 10:30 amCustomised22.11.2019Cond. Accep.N/AN/AWide range gauge is now installed on the chamber.
 The previous test with cold cathode gauge
failed due to broken gauge.  

Another
  
  22   Fri Nov 22 11:07:36 2019 Phetest without bakeoutBeam Diagnostic Chambers from India for HEBT - small one   unknownDONERefused09.01.2020Customised10.01.2020 - still pumpingAccepted15.01.20Mahr Rainer
Inside of the chamber is dirty (black mark
when wiped with tissue).

At the moment
(16.12.2019), the chamber is under cleaning.

Chamber
  
  25   Fri Nov 22 11:09:59 2019 PheOtherSeptum SIS100 - NEG coated chamberEnd 2019Delayed unknownTO COME           
  Draft   Fri Nov 22 11:11:00 2019 Phetest with bakeoutQuad Chambers for SIS100   unknownTO COME           
  14   Wed Oct 16 08:24:29 2019 Tonileak checkKryokollimator June 2019DelayedAugustfrom September 2019DONENot Needed02.09.2019Customised09.12.2020Accepted  Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01;
11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9;
11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4;
 criocollimator.jpg 
  54   Tue Feb 11 09:59:48 2020 Cristinaleak checkSIS100 Quadrupole chambersMarch 2020DelayedSeptember 20September 20DONEAccepted30.09.20HEBT Setup06.10.20Accepted8.10.20I.Pongrac    
  32   Mon Dec 2 14:28:58 2019 CristinaGeneralTS1MU1-test with magnetAugust 2019 delayed to KW6 2020DelayedUnkwonN/ADONEAccepted04.03.2020Customised Accepted GrossmontageTest bakeout inside the magnet   
  167   Fri Feb 25 09:36:32 2022 Cristinatest with bakeoutGrid+manipolator   KW7DONE 23.02.22Setup 111.03.22Accepted      
  165   Wed Feb 9 14:19:51 2022 Cristinatest without bakeoutCECOM chamber   KW5DONENot Needed08.02.2022Customised09.02.22Accepted M.Müller    
  102   Mon Nov 30 11:14:30 2020 CristinaCoatingT-piece CryringOct  KW48DONEAccepted26.11.20Horizontal Coating Setup3.12.20Accepted10.12.20Nikita    
  76   Wed May 27 10:34:37 2020 Phetest without bakeoutBPM SIS100 X2010-16   KW21DONENot Needed20.05.2020Customised22.05.2020Cond. Accep.26.08.20M.Müller    
  75   Tue May 19 12:03:40 2020 PheProblemTurbo Pump from Thomas Seiber On schedule KW19DONENot Needed19.05.2020Customised20.05.2020Refused27.05.2020Student from T.SieberDie Pumpe hat den Fehlercode 088 und hat eine
Störung des Axiallagersensors.(checked by
Graziano)
 pump_Sieber.jpg 
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage    
  61   Wed Mar 4 10:06:09 2020 Pheleak checkTransistion tube for SIS100 string test_Second testBeginning 2020DelayedFebruaryEnd of FebruaryDONEAccepted03.03.2020Customised03.03.2020Accepted5.03.2020Ivan and Stefan (for integration @BNG)   IMG-20200304-WA0001.jpg 
  77   Wed Jun 17 10:13:57 2020 Cristinatest with bakeoutIPM SIS18End MayOn schedule End May (the gewind had to be redone by Pfeiffer)DONEAccepted17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20Customised31.08.20Cond. Accep.04.09.2020Back to Tino G.    
  109   Fri Jan 29 11:52:53 2021 Cristinapumping speedNEG strips CRYRing   End Dec 20DONEAccepted25.01.21Fischer-Mommsen17.02.2021Accepted02.03.21Nikos    
  111   Fri Jan 29 11:55:45 2021 CristinaGeneralLower pressure of primary pumps   Dec 20DONEAccepted18.01.21Customised22.01.21Accepted-----G.Savino    
  100   Thu Nov 19 10:15:23 2020 CristinaCoatingParts for Cryring    Beginning October 20DONEAccepted16.11.20Horizontal Coating Setup17.11.20Accepted26.11.20David (Cryring)There are some parts which were not coated:
2 bellows (the Cryring people still did not
receive them from the company) and a T-piece,
  
  99   Tue Nov 17 09:43:55 2020 Cristinatest without bakeoutBPM 2010-16   ?DONEAccepted16.11.20Mobile 317.11.20Cond. Accep.01.12.20Grossmontage    
ELOG V3.1.5-fc6679b