  171   Mon Mar 28 11:50:59 2022 Cristinatest without bakeoutMissing dipole   28.03.22TO DO           
  170   Tue Mar 22 11:27:51 2022 Cristinatest with bakeoutSIS100 Qpole    on-goingNot Needed22.03.22Customised        
  169   Tue Mar 15 14:06:51 2022 Cristina Indian diagnostic chamber   11.03.22DONENot Needed15.03.22Customised16.03.22Accepted      
  168   Fri Feb 25 09:37:36 2022 Cristinatest without bakeout2 BMP   23.02.22DONE 28.02.22Mobile 304.03.22Accepted04.03.22M.Müller    
  167   Fri Feb 25 09:36:32 2022 Cristinatest with bakeoutGrid+manipolator   KW7DONE 23.02.22Setup 111.03.22Accepted      
  166   Tue Feb 15 09:56:13 2022 Cristinatest without bakeoutNTG chamber HEBT special installation   03.02.22DONENot Needed10.02.22Customised14.02.22Cond. Accep.25.06.22S.Zeller    
  165   Wed Feb 9 14:19:51 2022 Cristinatest without bakeoutCECOM chamber   KW5DONENot Needed08.02.2022Customised09.02.22Accepted M.Müller    
  164   Tue Jan 18 08:51:15 2022 Cristinatest without bakeoutGrids for pLinac (Siebert)07.01.22  17.01.22DONENot Needed19.01.22HEBT Setup31.01.22Cond. Accep.31.01.22T.Sieber    
  163   Tue Jan 18 08:50:13 2022 Cristinatest with bakeoutMirror chamber ESR (Brandau)   16.01.22DONENot Needed17.01.22Customised31.01.22Cond. Accep.31.01.22ESR    
  162   Wed Jan 12 08:40:41 2022 Cristina XHU detector ESR   16.12.21DONENot Needed12.01.22Setup 126.01.22Cond. Accep.24.02.22D.Winters    
  161   Wed Jan 12 08:40:00 2022 Cristina Windows for ESR   10.01.22DONENot Needed13.01.22Setup 221.10.22Cond. Accep.03.02.22R.Sanchez    
  160   Thu Dec 9 11:42:50 2021 Cristinatest without bakeoutBPM   07.12.21DONENot Needed09.12.21Mobile 313.12.21Cond. Accep.17.12.21Müller    
  159   Thu Dec 9 11:41:47 2021 Cristinatest with bakeoutTube with ceramic gap- resistence study   03.12.21DONENot Needed06.12.21Setup 109.12.21 Dec 21     
  158   Thu Dec 2 11:08:38 2021 Cristinatest without bakeoutBPM   30.11.21DONENot Needed02.12.21Mobile 306.12.21Accepted23.02.22M.Müller    
  157   Wed Nov 17 11:51:00 2021 Cristinatest with bakeoutSecond SIS100 injection Septa     DONENot Needed11.11.21Customised19.11.21Cond. Accep.      
  156   Wed Nov 17 11:50:00 2021 Cristinaleak checkSIS100 bunch compressor   15.11.21DONENot Needed16.11.21Customised17.11.21Accepted      
  155   Wed Nov 17 11:48:30 2021 Cristinatest without bakeoutFluorescence chamber SIS100   12.11.21DONEAccepted17.11.21Mobile 318.11.21Accepted      
  154   Wed Nov 17 11:46:15 2021 Cristinatest with bakeoutCoated Al sheet metall bent (Brandau)   5.11.21DONENot Needed8.11.21Setup 115.11.21Cond. Accep.03.02.22R.Sanchez    
  153   Mon Nov 8 15:10:43 2021 Phetest with bakeoutSIS100 bunch compressor with ceramic gap On schedule 08.11.2021DONENot Needed25.11.21Setup 101.12.21Accepted      
  Draft   Tue Nov 2 09:06:05 2021 Phetest without bakeoutCecom chamber for FAT K2030-1123, 06004016122 On schedule  on-going           