Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Datedown Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  32   Mon Dec 2 14:28:58 2019 CristinaGeneralTS1MU1-test with magnetAugust 2019 delayed to KW6 2020DelayedUnkwonN/ADONEAccepted04.03.2020Customised Accepted GrossmontageTest bakeout inside the magnet   
  26   Fri Nov 22 11:10:33 2019 Phetest with bakeoutDipole Chambers for SIS100 (2box)25.11.19DelayedUnknown17.01.20DONEAccepted12.02.2020 End februarAccepted  All chambers are inserted with success into
the magnet. Leak check for: 07-6-013-3; 07-6-009-6;
07-6-011-9
  
  35   Thu Dec 12 09:20:54 2019 Cristinatest with bakeoutIPM SIS100-GiacominiJannuary 2020DelayedUnknown21.04.2020DONENot Needed04.05.2020Customised15.05.2020AcceptedMai/JuniBrough to the TH    
  54   Tue Feb 11 09:59:48 2020 Cristinaleak checkSIS100 Quadrupole chambersMarch 2020DelayedSeptember 20September 20DONEAccepted30.09.20HEBT Setup06.10.20Accepted8.10.20I.Pongrac    
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller    
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller    
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita   pumpingspeed.jpg 
  44   Thu Feb 6 10:33:17 2020 Cristinatest without bakeoutBPM 2010-17 (keept in the new cryostat)KW7On scheduleKW710.02.2020DONEAccepted12.02.2020Mobile 314.02.2020Refused18.02.2020M.Müller    
  43   Mon Jan 20 10:40:00 2020 Cristinatest with bakeoutCeramic Tube Diagnostic-Dorn 06-004-01376-3KW4On scheduleKW420.01.20DONEAccepted21.01.2020Setup 127.01.20Accepted29.01.20M.Müller    
  29   Fri Nov 22 11:11:56 2019 Phetest with bakeout'Spill-Cavitaet" ???August 2019DelayedKW26 TO COME           
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage    
  41   Wed Dec 18 11:27:54 2019 Pheleak checkTransistion tube for SIS100 string testBeginning 2020DelayedFebruary06.02.2020DONERefused   Refused      
  61   Wed Mar 4 10:06:09 2020 Pheleak checkTransistion tube for SIS100 string test_Second testBeginning 2020DelayedFebruaryEnd of FebruaryDONEAccepted03.03.2020Customised03.03.2020Accepted5.03.2020Ivan and Stefan (for integration @BNG)   IMG-20200304-WA0001.jpg 
  58   Tue Mar 3 09:34:40 2020 CristinaCoatingSPARC chambers June 2019DelayedFebraury 202012.02.2020DONEAccepted01.09.2020Horizontal Coating Setup03.11.20Accepted10.12.20Track to JülichHR11VU61 (21.09.20); HR18VU63 (06.10.20);
HR19VU64 (26.10.20); HR12VU62(02.11.20)
  
  50   Thu Feb 6 12:48:46 2020 Cristinaleak check30 SIS 100 pumping chambersMay 20DelayedDecember 20         1 chamber required: acceptance test without
bakeout
  
  37   Thu Dec 12 10:19:06 2019 Cristinatest with bakeoutPumping chamber SIS100 -StefanEnd 2019DelayedBeginning202010.12.19DONEAcceptedJanuaryCustomised05.02.2020Accepted Stored in the TH    
  14   Wed Oct 16 08:24:29 2019 Tonileak checkKryokollimator June 2019DelayedAugustfrom September 2019DONENot Needed02.09.2019Customised09.12.2020Accepted  Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01;
11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9;
11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4;
 criocollimator.jpg 
  103   Mon Nov 30 11:15:48 2020 Cristinatest with bakeoutAntrieb for ESR-Beata1 Dec.Delayed?3.12.20DONENot Needed3.12.20Setup 110.12.2020Accepted11.12.20Müller    
  42   Thu Jan 16 09:05:12 2020 Cristinatest without bakeoutBPM SIS100- 2010-327.01.20Delayed30.01.2030.01.20DONEAccepted03.02.2020Customised05.02.2020Refused10.02.2020M.Müller
New mobile pumping station - the controller
for the IMG did not work.  The pressure is
recorded from the gauge controller of Mobile
  
  70   Wed Apr 22 10:14:43 2020 Cristinatest with bakeoutCeramic Tube for Cryring (SieberKW13Delayed22.04.202024.04.2020DONENot Needed27.04.2020Setup 206.05.2020Refused8.05.2020T.Sieber    