Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 1 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
165 Entries
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
11
Wed Oct 9 14:19:09 2019
Phe
test with bakeout
Scrapper for ESR (for Markus Steck)
09.10.2019
DONE
Accepted
14.10.2019
Setup 2
18.10.2019
Accepted
24.10.2019
Schwarz
Measurements asked as "urgent" for ESR. This
piece was already measured in 2014, and then
stored in an unkwon place.
23
Fri Nov 22 11:08:19 2019
Phe
test with bakeout
SEM-Monitor for Beam Diagnostic SIS18
02.12.2019
DONE
Accepted
03.12.2019
Setup 2
13.12.2019
Cond. Accep.
06.01.2020
Fiedler, Sebastian
Draft
Thu Nov 28 11:11:16 2019
Cristina
test with bakeout
Reference chamber for Monitor for beam diagnostic
09.01.2020
on-going
Not Needed
08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 am
Setup 2
67
Wed Mar 25 14:22:40 2020
Phe
test without bakeout
Broken ceramic for BPM
On schedule
25.03.2020
DONE
Not Needed
26.03.2020
Setup 2
27.03.2020
Cond. Accep.
28.03.2020
M.Müller
70
Wed Apr 22 10:14:43 2020
Cristina
test with bakeout
Ceramic Tube for Cryring (Sieber
KW13
Delayed
22.04.2020
24.04.2020
DONE
Not Needed
27.04.2020
Setup 2
06.05.2020
Refused
8.05.2020
T.Sieber
72
Fri Apr 24 09:56:27 2020
Cristina
test with bakeout
Be windows-Spillman
KW18
On schedule
28.04.2020
DONE
Not Needed
26.05.2020
Setup 2
MEASUREMENTS STOPPED
02.10.20
Collegue Spillman
161
Wed Jan 12 08:40:00 2022
Cristina
Windows for ESR
10.01.22
DONE
Not Needed
13.01.22
Setup 2
21.10.22
Cond. Accep.
03.02.22
R.Sanchez
9
Wed Oct 9 07:57:44 2019
Phe
test with bakeout
Cryring Detector Tube
09.10.2019
DONE
Accepted
10.10.2019
Setup 1
22.10.2019
Accepted
24.10.2019
Spillmann
Detector tube has been received from Grossmontage
(given to Andreas Kraemer). This Detector
tube is for Cryring - measurement request
24
Fri Nov 22 11:09:19 2019
Phe
test with bakeout
Grid for Beam Diagnostic SIS18
02.12.2019
DONE
Accepted
03.12.2019
Setup 1
13.12.2019
Cond. Accep.
06.01.2020
Fiedler, Sebastian
30
Thu Nov 28 11:09:29 2019
Cristina
test with bakeout
Reference chamber for Grid for beam diagnostic SIS18
06.01.2020
DONE
Not Needed
09.01.2020;
Setup 1
19.01.20
Accepted
----------
----------
43
Mon Jan 20 10:40:00 2020
Cristina
test with bakeout
Ceramic Tube Diagnostic-Dorn 06-004-01376-3
KW4
On schedule
KW4
20.01.20
DONE
Accepted
21.01.2020
Setup 1
27.01.20
Accepted
29.01.20
M.Müller
55
Fri Feb 14 13:34:54 2020
Cristina
test with bakeout
Berrilium Copper Stripes Dermati
14.02.2020
On schedule
14.02.2020
14.02.2020
DONE
Not Needed
17.02.2020; 11:30 am
Setup 1
24.02.2020
Cond. Accep.
26.02.2020
Bardonner
59
Tue Mar 3 09:58:03 2020
Cristina
test with bakeout
Ferrite RI (as received)
15.March
On schedule
20.03.2020
DONE
Not Needed
23.03.2020
Setup 1
27.03.2020
Cond. Accep.
--------
---------
64
Thu Mar 12 13:49:09 2020
Phe
test without bakeout
BPM SIS100 2010-17 (ceramic only)
Received
On schedule
12.03.2020
DONE
Not Needed
18.03.2020; 08:25
Setup 1
19.03.2020; 11:00
Cond. Accep.
19.03.2020
M.Müller
68
Mon Apr 6 15:33:45 2020
Phe
test with bakeout
Unbaked Ferrites from RI (bigger size)
On schedule
06.04.2020
DONE
Not Needed
Setup 1
22.04.2020
Cond. Accep.
73
Wed May 13 15:26:53 2020
Phe
test with bakeout
Big Baked Ferrites PLT 90/50/30 8C11 and Small baked Ferrites CMD5005
On schedule
11.05.2020
DONE
Not Needed
13.05.2020; 7:40 am
Setup 1
25.05.2020
Cond. Accep.
---------
-----------
74
Tue May 19 09:20:24 2020
Cristina
test with bakeout
Ceramic parts Hillenbrand
25.05.20
On schedule
25.05.2020
DONE
Accepted
26.05.2020
Setup 1
30.05.2020
Accepted
09.06.2020
Hillenbrand
84
Fri Sep 11 10:13:59 2020
Cristina
test without bakeout
Cecom diagnostic chamber HEBT
01.09.2020
DONE
Accepted
02.09.2020
Setup 1
04.09.2020
Cond. Accep.
23.09.20
M.Müller
91
Mon Sep 21 11:32:46 2020
Cristina
test with bakeout
Ferrite RI after firing
18.09.20
DONE
Accepted
22.09.2020
Setup 1
1.10.20
Accepted
---------
---------
95
Wed Sep 30 13:39:48 2020
Cristina
test with bakeout
Tube CCC Cryring
30.09.2020
DONE
Accepted
5.10.20
Setup 1
07.10.20
Accepted
8.10.20
T. Sieber
Goto page 1,
2
,
3
...
7
,
8
,
9
Next
All
ELOG V3.1.5-fc6679b