Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Statusdown Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  Draft   Thu Nov 28 11:11:16 2019 Cristinatest with bakeoutReference chamber for Monitor for beam diagnostic   09.01.2020on-goingNot Needed08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 amSetup 2        
  88   Tue Sep 15 11:14:44 2020 Cristinaleak checkSIS100 Dipole chambers    on-going July 2019Customised    07-00006-001-0; 07-00006-002-7; 07-00006-003-4;
07-00006-004-1; 07-00006-005-8; 07-00006-006-5;
07-00006-007-2; 07-00006-009-6; 07-00006-010-2;
  
  90   Mon Sep 21 11:31:47 2020 Cristinatest without bakeoutHEBT BPMKW39On schedule 28.09.20on-goingAccepted05.10.20. Test started again: 08.12.20Mobile 3 Refused  Since 19. Okt we wait for the decision of
the diagnostic group on how(who has to clean
the BPM. Since then the test is stopped.
Meeting
  
  114   Wed Feb 3 11:50:09 2021 Cristinatest with bakeoutDetector Pockets for scintillators SIS18   02.02.2021on-going 08.02.21HEBT Setup11.03.21Cond. Accep.12.03.21M.Müller    
  122   Wed Mar 10 12:11:04 2021 Cristinatest with bakeoutViewports DN100 ESR   16.02.21on-goingNot Needed16.02.21Setup 116.03.21Cond. Accep.26.03.21R.Sanchez    
  124   Wed Apr 28 10:05:13 2021 Cristinatest without bakeoutSIS100 pumping chambers -after cleaning by the Company   23.04.21on-goingAccepted26.04.Customised21.05.21Cond. Accep.  5 chambers checked: 07-00052-05-3; 06-00052-06-0;
07-00052-02-2; 07-00052-03-9; 07-00052-04-6
  
  Draft   Tue Nov 2 09:06:05 2021 Phetest without bakeoutCecom chamber for FAT K2030-1123, 06004016122 On schedule  on-going           
  170   Tue Mar 22 11:27:51 2022 Cristinatest with bakeoutSIS100 Qpole    on-goingNot Needed22.03.22Customised        
  87   Mon Sep 14 10:38:59 2020 Cristinatest without bakeoutTest on Viton gasket   14.09.2020TO DONot Needed          
  171   Mon Mar 28 11:50:59 2022 Cristinatest without bakeoutMissing dipole   28.03.22TO DO           
  25   Fri Nov 22 11:09:59 2019 PheOtherSeptum SIS100 - NEG coated chamberEnd 2019Delayed unknownTO COME           
  Draft   Fri Nov 22 11:11:00 2019 Phetest with bakeoutQuad Chambers for SIS100   unknownTO COME           
  29   Fri Nov 22 11:11:56 2019 Phetest with bakeout'Spill-Cavitaet" ???August 2019DelayedKW26 TO COME           
  2   Mon Sep 30 11:04:15 2019 Cristinaleak checkCryo collimator 11-1-18-8   24.09.2019DONEAccepted25.09.2019Customised25.09.2019Accepted26.09.2019L. Bozyk    
  3   Mon Sep 30 11:11:26 2019 Cristinatest with bakeoutLaser chamber -WintersBeginning 2019Delayed 16.08.2019DONEAccepted30.08.2019Customised12.02.2020AcceptedKW10D.Winters
The measurement was stopped because of the
wrong heating jackets
 Laser_chamber.jpg 
  4   Mon Sep 30 11:15:47 2019 Cristina test with bakeoutDetector Recoil chamber ESR   2.09.2019DONEAccepted9.09.2019Customised29.10.2019Cond. Accep.1.11.19HillenbrandThe chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
 Recoil_ESR_chamber.jpg 
  5   Mon Sep 30 14:00:51 2019 Cristinapumping speed800 l/s Agilent   20.09.2019DONEAccepted1Test:7.10.2019; 2Test: 14.11.2019Fischer-Mommsen1.11.19Cond. Accep. Sent back to AgilentPumping Speed measured a bit lower than stated   
  6   Mon Sep 30 14:04:43 2019 Cristinapumping speedCombi pump DN40   09.08.2019DONEAccepted20.08.2019Fischer-Mommsen20.09.2019Accepted Sent back to Agilent   Agilent_combi_DN40.jpg 
  7   Mon Sep 30 14:06:07 2019 Cristinapumping speedSlim SIP 150   9.08.2019DONEAccepted07.02.2020Fischer-Mommsen06.03.2020Accepted     Comparison.jpg 
  8   Wed Oct 9 07:55:47 2019 Pheleak checkAll metal gate valve (Bender)   08.10.2019DONEAccepted21.10.2019Customised24.10.2019Accepted24.10.2019M.BenderLeak check required by Markus Bender for a
"all metal gate valve".  The gate valve was
received on the 08.10.2019.  No deadline.
 All_metal_valve.jpg 