ID |
Date |
Author |
Category |
Subject |
Text |
|
53
|
Wed Jun 12 18:48:43 2024 |
Afternoon shift | Runs | First laser scans | [TABLE border="1"]
Time | Part. Det. Int | ESR-intensity| cooler-HV
| LMD-DAQ1 Files | LMD-DAQ2 Files | scan |
|
68
|
Thu Jun 13 18:03:36 2024 |
Afternoon shift | Runs | Continuation: First scans | [TABLE border="1"]
Time | Part. Det. Int | ESR-intensity| cooler-HV
| LMD-DAQ1 Files | LMD-DAQ2 Files | scan |
|
73
|
Fri Jun 14 06:38:41 2024 |
Konstantin Mohr, Bernhard Maass, Peter Micke, Lukas Kau, Dounia Boudefla | Runs | Morning runs | Very successful shift, no crashes until 11:10
Previous night shift had problems with the
pulse laser starting around 3am.
|
|
77
|
Fri Jun 14 14:44:51 2024 |
Afternoon shift | Runs | Afternoon shift | Pizza shift
[B]the scan direction is from higher wavelength |
|
3
|
Thu Apr 25 16:34:05 2024 |
Rodolfo | Laser | Efficiency of Fluorescein27 | The figure below shows the efficiency of Fluorescein27
vs. Wavelength. Each point was averaged over
500 laser shots.
|
|
5
|
Wed May 29 09:49:30 2024 |
Rodolfo | Laser | Laser-beam profile | Using a telescope (Plan-concave lens -500
mm and Plan-convex lens +1000 mm) after the
pulsed-dye laser system we got the following |
|
16
|
Mon Jun 3 19:42:06 2024 |
Rodolfo | Laser | Laser-beam through E-Cooler | UV-laser beam is now going through the Electron-Cooler.
|
|
20
|
Thu Jun 6 07:12:49 2024 |
Konstantin Mohr | Laser | T-Scraper | The T-Scrapers can be driven by DeviceControl,
which must be started from a console. To
do so, first open the app-launcher and then |
6x |
30
|
Fri Jun 7 11:14:04 2024 |
Rodolfo | Laser | Trigger-signal for MRC | We are using a 2-Channel Function Generator
(from Textronik) to generate the trigger
signal for the MRC Beam Stabilization.
|
|
43
|
Tue Jun 11 21:38:35 2024 |
Julian, Imke, Rodolfo | Laser | Wavemeter HeNe long time stability | The HeNe was running over night and the measured
laser frequency of the wavemeter was logged,
see picture.
|
|
51
|
Wed Jun 12 17:12:13 2024 |
Julian, Danyal, Rodolfo | Laser | Timing für 229Th89+ | We did the timing Ion-Beam Laser-beam time
overlap.
|
|
69
|
Thu Jun 13 18:23:46 2024 |
Julian | Laser | Restarting the laser controller | If the laser controller is locked up again,
the little display will show an error message
after an attempted medusa scan.
|
|
70
|
Thu Jun 13 18:38:24 2024 |
Rodolfo Sanchez, Julian Palmes, Sebastian Klammes | Laser | Laser Dye change - new MRC settings - scraper checks of laser beam | We changed the dye at ~3pm.
After some fine adjustements of the laser |
|
1
|
Tue Apr 16 14:42:37 2024 |
Jan | General | G-PAC Proposal | |
|
2
|
Tue Apr 16 16:28:21 2024 |
Danyal | General | Great | Thanks Jan! |
|
6
|
Wed May 29 10:54:21 2024 |
Shahab, Jan | General | Gas Target Events with new timing system | Using the new timing system, it is possible
to grab any events as pulses, but also as
long inter event gates under GENESYS. Many |
|
Draft
|
Thu Jun 6 07:54:15 2024 |
Danyal | General | pressure gauges and ion pumps | yesterday (05.06.2024), firstly, the two ion
pumps (underneath the fluorescence chamber)
were switched off by the vacuum group (Björn |
|
32
|
Fri Jun 7 17:10:45 2024 |
Sebastian | General | XUV LED | Maximum XUV LED Voltage: 6.5V |
|
35
|
Sat Jun 8 13:11:52 2024 |
Carsten | General | Put the go4login in atplaser .bashrc | Put the go4login in atplaser .bashrc in order
to avoid that one always has to go to the
go4 directory to set the environment variable.
|
|
42
|
Tue Jun 11 21:23:11 2024 |
Julian, Imke | General | How to read out voltage | 1.) If not already opened, open the Medusa
Laser Control software, see picture:
2.) In the "view" submenu, choose "proteus |
|