Entry  Mon Apr 6 05:28:55 2020, Ragan, Laszlo, Nikos, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm) 46C168E2-D1D5-4CD3-B87F-7F82D045D527.jpegC55A1803-E814-412F-B3DC-40FE24946F8A.MOV75662B09-68EE-49FD-9BB2-71766305ECF8.jpeg1C0040AA-3CE4-4019-B85E-0049EBE85384.jpeg2020-04-06_05-40-47-352.png
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Mon Apr 6 05:43:50 2020, Ragan, Laszlo, Nikos, Runs, One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-06_06-18-59-809.png946073FA-3077-4CBF-900B-565BD19CF040.jpeg10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg2020-04-06_08-03-40-493.png
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
Entry  Thu Apr 2 05:00:44 2020, Ragan, Esther, Oliver, Runs, Second measurement with 2 hrs storage time 734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg
Electron cooler was off here. Thus, this measurement is not what we needed.
(in the picture below, it can be seen that the beam is not cooled)
Entry  Thu Apr 2 07:01:32 2020, Ragan, Esther, Oliver, Runs, Measurement with 4 hrs storage time 
beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 4 hrs
Entry  Sat Apr 4 17:32:01 2020, Ragan, Alex, Esther, General, No beam in ESR 
The beam is coming from SIS but doesn't arrive in ESR because the quadrupole magnets in ESR have failed.

Update (18:01): Problem has been resolved. 
Entry  Sat Apr 4 18:29:44 2020, Ragan, Alex, Esther, Runs, 0 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_18-27-53-442.png2020-04-04_18-41-54-901.pngF5D184AC-FB3E-4F9F-B839-F71BC55C0996.jpegE4176CCB-1828-4E2E-85FB-0AC4BDC2808B.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Sat Apr 4 18:57:49 2020, Ragan, Alex, Esther, General, Timing problem with SIS & ESR and problems with stacking 
There are further problems with beam stacking in ESR. It works occasionally but keeps failing.
There is also timing problem between SIS and FRS.
Entry  Sat Apr 4 19:55:37 2020, Ragan, Alex, Esther, Runs, Failed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_19-54-47-760.png2020-04-04_20-02-26-363.png
FAILED - measurement was stopped by sudden loss of the beam 

beam: 205Tl81+ (no scraping , Al ~1g/cm2)
Entry  Sun Apr 5 15:28:35 2020, Ragan, Alex, Esther, Runs, Four hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
Entry  Sun Apr 5 20:23:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sun Apr 5 21:50:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sun Apr 5 23:28:01 2020, Ragan, Alex, Esther, Runs, One-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
Entry  Thu Mar 26 17:21:40 2020, Ragan, General, Stochastic cooling 
1) From SIS, 206Pb67+ @401.17 MeV/u goes to FRS where only SEETRAM is placed in the target area to strip off 206Pb67+ to get 206Pb81+.
2) There is 206Pb81+ (H-like primary beam) inside ESR at 400 MeV/u.
3) The ESR team is now trying Stochastic cooling with 206Pb81+ beam at 400 MeV/u.
Entry  Fri Mar 27 13:02:07 2020, Ragan, General, Stochastic cooling stochastic_cooling.PNG
1) ESR team is successful with the Stochstic cooling of primary H-like 206Pb81+ beam @400 MeV/u.
2) Now, they are trying for stacking of the beam.
Entry  Fri Mar 27 13:04:17 2020, Ragan, General, FRS Settings until now frs.pdfFRS.pdf
Yuri and Helmut have been extensively involved in tuning and optimizing of the FRS.

26th March, 2020 (Evening setting):
Entry  Fri Mar 27 13:40:54 2020, Ragan, General, NTCap start and shutdown information ntcapmanual.pdf
The attachment contains information on how to start and shutdown NTCap and bridge computer.
Entry  Fri Mar 27 19:51:37 2020, Ragan, General, ESR Machine 
By changing the tune to Qx=2.33, Qy=2.36 the momentum acceptance was significantly improved. A variation of the cooler voltage of 10300 V was possible without
beam loss. That corresponds to a momentum acceptance of 2.7 %. That should provide good conditions for longitudinal stacking.
Entry  Fri Mar 27 19:59:09 2020, Ragan, General, Beam stacking in ESR is achieved 8B7F254E-DB10-48B6-9E2E-9CA0FF998C12.MOVstacking.png
Thanks to Sergey and Markus, stacking of primary H-like 206Pb81+ beam in ESR is achieved.

The stacking of the primary beam was established. There is continuous cooling on the injection orbit by stochastic cooling and by electron cooling on the
Entry  Fri Mar 27 20:05:43 2020, Ragan, General, H2 gas jet ready BAFA7906-5F66-4108-86F9-6D61573B43CD.MOV
Thanks to Nikos, stable H2 gas jet target with 10^14 particles/cm^3 is ready.
(More information can be found on: https://ulpc24.gsi.de/cgi-bin/jet.py?gasart=Helium )
Entry  Fri Mar 27 20:52:31 2020, Ragan, General, Plans for the measurement with 206Pb81+ 
We plan to measure:

1. Lifetime of H-like 206Pb81+ beam with two electron cooler currents: