HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Bound beta decay experiment on Tl-205, Page 6 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Category Subject
  163   Mon Apr 6 05:28:55 2020 Ragan, Laszlo, NikosRunsZero hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0555.lmd

_______________________________________________________________________________

time when accumulation starts: 04:51
time when storage starts: 05:28
time when storage ends: 05:28
I_cooler during storage time: -1 mA (20 mA)

I_cooler = 179 mA  


I_SIS: 1.75e9      
ESR particles after stacking: 2.2e6 (offset 5e5)
Number of stackings:  100 
Target ON density: 4.45e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 :  2mins
(i.e. time for which electron cooler is on after gas jet) 



NTCAp file:
SC_2020-04-06_00-59-46
\IQ_2020-04-06_00-59-38
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 46C168E2-D1D5-4CD3-B87F-7F82D045D527.jpeg
46C168E2-D1D5-4CD3-B87F-7F82D045D527.jpeg
Attachment 2: C55A1803-E814-412F-B3DC-40FE24946F8A.MOV
Attachment 3: 75662B09-68EE-49FD-9BB2-71766305ECF8.jpeg
75662B09-68EE-49FD-9BB2-71766305ECF8.jpeg
Attachment 4: 1C0040AA-3CE4-4019-B85E-0049EBE85384.jpeg
1C0040AA-3CE4-4019-B85E-0049EBE85384.jpeg
Attachment 5: 2020-04-06_05-40-47-352.png
2020-04-06_05-40-47-352.png
  164   Mon Apr 6 05:43:50 2020 Ragan, Laszlo, NikosRunsOne and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0558.lmd

_______________________________________________________________________________

time when accumulation starts: 05:41
time when storage starts: 06:19
time when storage ends: 07:49
I_cooler during storage time: -1 mA (20 mA)

I_cooler = 179 mA  


I_SIS: 1.75e9      
ESR particles after stacking: 2.3e6 (offset 5e5)
Number of stackings:  100 
Target ON density: 4.36e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 



NTCAp file:
SC_2020-04-06_00-59-46
\IQ_2020-04-06_00-59-38
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2020-04-06_06-18-59-809.png
2020-04-06_06-18-59-809.png
Attachment 2: 946073FA-3077-4CBF-900B-565BD19CF040.jpeg
946073FA-3077-4CBF-900B-565BD19CF040.jpeg
Attachment 3: 10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg
10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg
Attachment 4: 2020-04-06_08-03-40-493.png
2020-04-06_08-03-40-493.png
  116   Thu Apr 2 05:00:44 2020 Ragan, Esther, OliverRunsSecond measurement with 2 hrs storage time
Electron cooler was off here. Thus, this measurement is not what we needed.
(in the picture below, it can be seen that the beam is not cooled)


beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 2 hrs

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at 01:48 , first file: run0287.lmd
file running:    0287.lmd

_______________________________________________________________________________

time when accumulation starts: 04:45
time when storage starts: 04:55
time when storage ends: 06:55
I_cooler during storage time: 10 mA

I_cooler =  mA


I_SIS: 1.8e9      
ESR particles after stacking: ~e5  
Number of stackings: 20
Target ON density:   4e12
Target on time: 06:56:30
Target off time: 07:06:30
Target on time for measurement: 10 mins (by local mode)       


NTCAp file:
SC_2020-04-01_16-36-43/0000xxx.iq.tdms
\IQ_2020-04-01_16-36-43/0000xxx.iq.tdms
IQ rate: 8 MS/s
(saved in drive : o)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg
734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg
  118   Thu Apr 2 07:01:32 2020 Ragan, Esther, OliverRunsMeasurement with 4 hrs storage time
beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 4 hrs

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at 01:48 , first file: run0287.lmd
file running:    0287.lmd

_______________________________________________________________________________

time when accumulation starts: 04:45
time when storage starts: 04:55
time when storage ends: 06:55
I_cooler during storage time: 10 mA

I_cooler =  mA


I_SIS: 1.8e9      
ESR particles after stacking: ~e5  
Number of stackings: 20
Target ON density:   4e12
Target on time: 06:56:30
Target off time: 07:06:30
Target on time for measurement: 10 mins (by local mode)       


NTCAp file:
SC_2020-04-01_16-36-43/0000xxx.iq.tdms
\IQ_2020-04-01_16-36-43/0000xxx.iq.tdms
IQ rate: 8 MS/s
(saved in drive : o)

copy and repeat the above (below the line) for every storage time measurement
  148   Sat Apr 4 17:32:01 2020 Ragan, Alex, EstherGeneralNo beam in ESR
The beam is coming from SIS but doesn't arrive in ESR because the quadrupole magnets in ESR have failed.

Update (18:01): Problem has been resolved. 
  149   Sat Apr 4 18:29:44 2020 Ragan, Alex, EstherRuns0 hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 22:11,  run0308.lmd 
file running: 0339.lmd

_______________________________________________________________________________

time when accumulation starts: 17:56
time when storage starts: 18:28
time when storage ends: 18:28
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 1.75e9      
ESR particles after stacking: 1.4e6 (offset 3.5e5)
Number of stackings: ~65 (was set to 80 but stacking broke down after ~65)  
Target ON density: 4.05e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 2 mins
(i.e. time for which electron cooler is on after gas jet)  



NTCAp file:
SC_2020-04-03_22-12-50
\IQ_2020-04-03_22-13-48
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 2020-04-04_18-27-53-442.png
2020-04-04_18-27-53-442.png
Attachment 2: 2020-04-04_18-41-54-901.png
2020-04-04_18-41-54-901.png
Attachment 3: F5D184AC-FB3E-4F9F-B839-F71BC55C0996.jpeg
F5D184AC-FB3E-4F9F-B839-F71BC55C0996.jpeg
Attachment 4: E4176CCB-1828-4E2E-85FB-0AC4BDC2808B.jpeg
E4176CCB-1828-4E2E-85FB-0AC4BDC2808B.jpeg
  150   Sat Apr 4 18:57:49 2020 Ragan, Alex, EstherGeneralTiming problem with SIS & ESR and problems with stacking
There are further problems with beam stacking in ESR. It works occasionally but keeps failing.
There is also timing problem between SIS and FRS.
  151   Sat Apr 4 19:55:37 2020 Ragan, Alex, EstherRunsFailed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm)
FAILED - measurement was stopped by sudden loss of the beam 

beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:02,  run0343.lmd 
file running: 0347.lmd

_______________________________________________________________________________

time when accumulation starts: 19:17
time when storage starts: 19:55
time when storage ends: 05:55
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 1.8e9      
ESR particles after stacking: 2.5e6 (offset 3e5)
Number of stackings: 100  
Target ON density: xxe12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 


I_ESR (20:30) :  2.25e6
I_ESR (21:00) :  2.1e6
I_ESR (21:30) :  2.0e6
I_ESR (22:00) :  1.8e6

NTCAp file:
SC_2020-04-04_19-04-52
\IQ_2020-04-04_19-04-52
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 2020-04-04_19-54-47-760.png
2020-04-04_19-54-47-760.png
Attachment 2: 2020-04-04_20-02-26-363.png
2020-04-04_20-02-26-363.png
  158   Sun Apr 5 15:28:35 2020 Ragan, Alex, EstherRunsFour hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:02,  run0343.lmd 
file running: 0539.lmd

_______________________________________________________________________________

time when accumulation starts: 15:27
time when storage starts: 16:05
time when storage ends: 20:05
I_cooler during storage time: -1 mA

I_cooler = -1 mA  (20 mA)


I_SIS: 2e9      
ESR particles after stacking: 2e6 (offset 5e5)
Number of stackings: 100  
Target ON density: 3.92e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 



I_ESR (16:30) :  1.9e6
I_ESR (17:00) :  1.75e6
I_ESR (17:30) :  1.6e6
I_ESR (18:00) :  1.55e6
I_ESR (18:30) :  1.45e6
I_ESR (19:00) :  1.3e6
I_ESR (19:30) :  1.25e6
I_ESR (20:00) :  1.2e6



NTCAp file:
SC_2020-04-04_19-04-52
\IQ_2020-04-04_19-04-52
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2020-04-05_15-27-32-971.png
2020-04-05_15-27-32-971.png
Attachment 2: A2DFA8C1-D623-42FA-BBD5-1F75F51D51DD.jpeg
A2DFA8C1-D623-42FA-BBD5-1F75F51D51DD.jpeg
Attachment 3: 2020-04-05_16-23-38-007.png
2020-04-05_16-23-38-007.png
Attachment 4: B17A216F-15D8-48F2-9403-37C8236A38C0.jpeg
B17A216F-15D8-48F2-9403-37C8236A38C0.jpeg
Attachment 5: 87D9890E-AC6D-4E3F-B45B-FED6A301253B.jpeg
87D9890E-AC6D-4E3F-B45B-FED6A301253B.jpeg
Attachment 6: 2020-04-05_20-16-54-054.png
2020-04-05_20-16-54-054.png
Attachment 7: 43239EE6-100B-4540-894C-B98E659BE472.jpeg
43239EE6-100B-4540-894C-B98E659BE472.jpeg
  159   Sun Apr 5 20:23:02 2020 Ragan, Alex, EstherRunsHalf-hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0540.lmd

_______________________________________________________________________________

time when accumulation starts: 20:21
time when storage starts: 20:59
time when storage ends: 21:29
I_cooler during storage time: -1 mA

I_cooler = 179 mA  (20 mA)


I_SIS: 2e9      
ESR particles after stacking: 2.2e6 (offset 2.5e5)
Number of stackings: 100  
Target ON density: 4.14e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 





NTCAp file:
SC_2020-04-04_19-04-52
\IQ_2020-04-04_19-04-52
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2B066703-2B92-4FBD-94F0-01C50424A7DB.MOV
Attachment 2: 2020-04-05_21-00-05-018.png
2020-04-05_21-00-05-018.png
Attachment 3: 57175364-4FA3-4C56-8DC0-D4E1FE3BFFA9.jpeg
57175364-4FA3-4C56-8DC0-D4E1FE3BFFA9.jpeg
Attachment 4: 523688CD-02EB-4A57-ADFC-77122CD205F5.MOV
Attachment 5: E55589A9-3C71-4CF6-ACAB-63FD23B00BE3.jpeg
E55589A9-3C71-4CF6-ACAB-63FD23B00BE3.jpeg
Attachment 6: 2020-04-05_21-42-32-717.png
2020-04-05_21-42-32-717.png
Attachment 7: 39A3C392-8E7D-44A3-8564-29AC89A4CC7C.jpeg
39A3C392-8E7D-44A3-8564-29AC89A4CC7C.jpeg
  160   Sun Apr 5 21:50:02 2020 Ragan, Alex, EstherRunsHalf-hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0546.lmd

_______________________________________________________________________________

time when accumulation starts: 21:43
time when storage starts: 22:21
time when storage ends: 22:51
I_cooler during storage time: -1 mA

I_cooler = 179 mA  (20 mA)


I_SIS: 1.75e9      
ESR particles after stacking: 2.2e6 (offset 3e5)
Number of stackings:  ~90 (was set to 100 but ~10 were missed) 
Target ON density: 4.2e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 





NTCAp file:
SC_2020-04-04_19-04-52
\IQ_2020-04-04_19-04-52
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2020-04-05_22-21-44-967.png
2020-04-05_22-21-44-967.png
Attachment 2: 8F69C30E-2A79-405C-85D2-CFA061720E14.jpeg
8F69C30E-2A79-405C-85D2-CFA061720E14.jpeg
Attachment 3: 922E0C48-BC5F-4B8B-B35F-F7E2E823CFB2.MOV
Attachment 4: 76898BAD-3A48-4E8F-A830-BA0F158C9DB8.MOV
Attachment 5: AEB662B9-D22B-4213-9D4F-1F723404DF2C.jpeg
AEB662B9-D22B-4213-9D4F-1F723404DF2C.jpeg
Attachment 6: B601FDD9-8CA7-4DD0-A17B-678C44EDBDD9.jpeg
B601FDD9-8CA7-4DD0-A17B-678C44EDBDD9.jpeg
Attachment 7: 2020-04-05_23-04-35-616.png
2020-04-05_23-04-35-616.png
  161   Sun Apr 5 23:28:01 2020 Ragan, Alex, EstherRunsOne-hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0549.lmd

_______________________________________________________________________________

time when accumulation starts: 23:04
time when storage starts: 23:42
time when storage ends: 00:42
I_cooler during storage time: -2 mA (20 mA)

I_cooler = 180 mA  


I_SIS: 1.8e9      
ESR particles after stacking: 2.2e6 (offset 3e5)
Number of stackings:  100
Target ON density: 4.24e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 





NTCAp file:
SC_2020-04-04_19-04-52
\IQ_2020-04-04_19-04-52
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2020-04-05_23-42-50-224.png
2020-04-05_23-42-50-224.png
Attachment 2: 2020-04-06_00-56-01-052.png
2020-04-06_00-56-01-052.png
Attachment 3: 0A9DA63C-7DBD-42B3-9CE9-08E9785B33B2.jpeg
0A9DA63C-7DBD-42B3-9CE9-08E9785B33B2.jpeg
Attachment 4: C885A387-78BB-49BF-AD5C-D7FEAB8248DE.jpeg
C885A387-78BB-49BF-AD5C-D7FEAB8248DE.jpeg
Attachment 5: 7487031D-7B12-4ACF-B0C8-55D5B928C0CE.jpeg
7487031D-7B12-4ACF-B0C8-55D5B928C0CE.jpeg
Attachment 6: 3EE56236-447E-4EAE-8394-B1F05BC9D1C7.jpeg
3EE56236-447E-4EAE-8394-B1F05BC9D1C7.jpeg
Attachment 7: D809F5FB-214D-486B-A4F0-912FD2C0CB94.MOV
  18   Thu Mar 26 17:21:40 2020 RaganGeneralStochastic cooling
1) From SIS, 206Pb67+ @401.17 MeV/u goes to FRS where only SEETRAM is placed in the target area to strip off 206Pb67+ to get 206Pb81+.
2) There is 206Pb81+ (H-like primary beam) inside ESR at 400 MeV/u.
3) The ESR team is now trying Stochastic cooling with 206Pb81+ beam at 400 MeV/u.
  19   Fri Mar 27 13:02:07 2020 RaganGeneralStochastic cooling
1) ESR team is successful with the Stochstic cooling of primary H-like 206Pb81+ beam @400 MeV/u.
2) Now, they are trying for stacking of the beam.
Attachment 1: stochastic_cooling.PNG
stochastic_cooling.PNG
  20   Fri Mar 27 13:04:17 2020 RaganGeneralFRS Settings until now
Yuri and Helmut have been extensively involved in tuning and optimizing of the FRS.

26th March, 2020 (Evening setting):
1) 206Pb67+ beam from SIS @401.17 MeV/u.
2) SEETRAM in target area of FRS is used for stripping the beam from SIS to get 206Pb81+ and is then transported to ESR @400 MeV/u. (SEETRAM consists of three Ti foils of ~10 um thickness which are used for stripping purpose (more info: https://www-win.gsi.de/frs-setup/ ))
3) SL1 slits are opened +-10 mm to get rid of other charge states of 206Pb and only transport 206Pb81+ through FRS.

27th March, 2020 (Evening setting):
1) Different target (Be 1-6 g/cm2 with Nb backing) and degrader (Al)thicknesses are used for the optimization of 206Pb81+ with matter in FRS to get the beam with @400 MeV/u in ESR.
2) 206Pb67+ beam from SIS @540-560 MeV/u.
Attachment 1: frs.pdf
frs.pdf frs.pdf frs.pdf frs.pdf
Attachment 2: FRS.pdf
FRS.pdf FRS.pdf FRS.pdf FRS.pdf FRS.pdf FRS.pdf FRS.pdf FRS.pdf
  21   Fri Mar 27 13:40:54 2020 RaganGeneralNTCap start and shutdown information
The attachment contains information on how to start and shutdown NTCap and bridge computer.
Attachment 1: ntcapmanual.pdf
ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf ntcapmanual.pdf
  22   Fri Mar 27 19:51:37 2020 RaganGeneralESR Machine
By changing the tune to Qx=2.33, Qy=2.36 the momentum acceptance was significantly improved. A variation of the cooler voltage of 10300 V was possible without beam loss. That corresponds to a momentum acceptance of 2.7 %. That should provide good conditions for longitudinal stacking.

Thanks to the ESR team !
  23   Fri Mar 27 19:59:09 2020 RaganGeneralBeam stacking in ESR is achieved
Thanks to Sergey and Markus, stacking of primary H-like 206Pb81+ beam in ESR is achieved.

The stacking of the primary beam was established. There is continuous cooling on the injection orbit by stochastic cooling and by electron cooling on the stack orbit. (Time controlled operation of stochastic cooling could not be achieved due to controls issues). After stchastic cooling on the injection orbit the rf system decelerates the beam by 1.5 % in momentum and at the lower momentum electron cooling keeps the beam. The DC trafo shows accumulation of 10 injections of primary low intensity Pb81+ beam. Losses during the accumulation seems to be small.
Attachment 1: 8B7F254E-DB10-48B6-9E2E-9CA0FF998C12.MOV
Attachment 2: stacking.png
stacking.png
  24   Fri Mar 27 20:05:43 2020 RaganGeneralH2 gas jet ready
Thanks to Nikos, stable H2 gas jet target with 10^14 particles/cm^3 is ready.
(More information can be found on: https://ulpc24.gsi.de/cgi-bin/jet.py?gasart=Helium )
Attachment 1: BAFA7906-5F66-4108-86F9-6D61573B43CD.MOV
  25   Fri Mar 27 20:52:31 2020 RaganGeneralPlans for the measurement with 206Pb81+
We plan to measure:

1. Lifetime of H-like 206Pb81+ beam with two electron cooler currents:
a) 200 mA
b) 10 mA (so that recombination rate is less)
using MWPC (capture detector in outer pocket) and CsISiPHOS (loss detector in inner pocket). 

2. To find the efficiency of the MWPC.
ELOG V3.1.5-fc6679b