ID |
Date |
Author |
Category |
Subject |
Year |
Text |
|
567
|
Sun May 30 14:40:55 2021 |
Jan, Sophia | Detectors | real detector assignment | 2021 | ************************************
GEM1800 @ 90deg (xray1)
GLP2000 @ 35deg (xray2)
|
|
568
|
Sun May 30 14:48:09 2021 |
Jan, Sophia | Calibration | run0215 - crap | 2021 | |
|
569
|
Mon May 31 10:08:42 2021 |
Jan, Sophia | Runs | E127b runsheet | 2021 | |
|
573
|
Wed Jun 23 12:29:35 2021 |
Jan, Sophia | Calibration | Efficiency of the x-ray Detectors | 2021 | For the x-ray detectors, efficiencies have
been measured, before and after the experiment
was performed.
|
|
577
|
Wed Jul 14 14:46:05 2021 |
Jan, Sophia | Detectors | collimator geometry | 2021 | We have measured the collimator geometry.
The annotations of the variables can be found
in the attached sketch
|
10x |
420
|
Mon May 24 15:24:52 2021 |
Jan, Laszlo, Piere-Michel, Enis | Runs | Run 0096 | 2021 | No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 |
|
421
|
Mon May 24 16:06:39 2021 |
Jan, Laszlo, Piere-Michel, Enis | Runs | Run 0097 | 2021 | Changed trafo offset during this file !!
No. of stacks: 10 (before 5)
|
|
357
|
Thu May 20 17:31:50 2021 |
Jan, Laszlo, Beatriz | General | beam & target alignement | 2021 | beam and target alignement was checked by
looking at the Xray rates. Best case when:
Target bump (position) SC 9: -18.5mm
|
|
25
|
Wed Oct 23 14:51:43 2019 |
Jan, Laszlo | DAQ | VME modules & main.cfg | | Here is the current list of VME modules in
our DRASI daq including HW addresses:
|
|
28
|
Wed Nov 6 14:13:53 2019 |
Jan, Laszlo | Detectors | DSSSD - 1st movement - realignment | | We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion |
|
30
|
Thu Dec 5 10:57:57 2019 |
Jan, Laszlo | Detectors | setting up the DSSD with beam | | This is a brief how-to about getting the DSSSD
set up with stored beam and target in the
ESR.
|
|
83
|
Fri Mar 20 13:21:33 2020 |
Jan, Laszlo | Analysis | 124Xe data of first night | | The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
|
|
498
|
Thu May 27 14:33:05 2021 |
Jan, Beatriz, Alex | Runs | Run 0154 - crap run | 2021 | No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
|
|
1
|
Thu Sep 13 11:42:33 2018 |
Jan Glorius | Collaboration | Proposal | | Attached is the beam time proposal submitted
and accepted by the G-PAC in 2017. |
|
293
|
Thu Apr 29 20:32:52 2021 |
Jan Glorius | Calibration | calibration sources | 2021 | We use the following list of sources for calibration
of the Xray detectors:
|
|
294
|
Thu Apr 29 20:34:09 2021 |
Jan Glorius | Calibration | run0003 - Xray90 calib Pb210 d=167.5mm | 2021 | Efficiency calibration in the lab
Detector: GEM1800 - 90 deg
|
|
295
|
Fri Apr 30 09:27:27 2021 |
Jan Glorius | Calibration | run0004 - Xray90 calib Pb210 d=167.5mm | 2021 | Efficiency calibration in the lab
Detector: GEM1800 - 90 deg
|
|
296
|
Fri Apr 30 09:57:57 2021 |
Jan Glorius | Calibration | run0005 - Xray90 calib Pb210 d=167.5mm | 2021 | Efficiency calibration in the lab
Detector: GEM1800 - 90 deg
|
|
297
|
Fri Apr 30 10:55:34 2021 |
Jan Glorius | DAQ | Xray multi-triggers - blocking gate | 2021 | From the CFD of Xray1 (90deg) we get multiple
trigger signals every ~5sec for unknown reasons.
|
|
298
|
Fri Apr 30 11:04:31 2021 |
Jan Glorius | Calibration | run0006 - Xray90 calib Pb210 d=167.5mm | 2021 | Efficiency calibration in the lab
Detector: GEM1800 - 90 deg
|
|