  proton-capture on 118Te, Page 21 of 29  Not logged in ELOG logo
ID Date Author Categorydown Subject Year Text Attachments
  288   Wed Mar 31 13:52:04 2021 JanDetectorsBaF Na22 Testing2021On 30. and 31.03.2021 we did some testing
with the 6 BaF detectors.
  
  289   Wed Mar 31 13:57:27 2021 JanDetectorsBaF HV settings2021The setting below is a start value for final
gain matching with a full ADC range of 12MeV:
  
  290   Wed Apr 14 09:42:50 2021 JanDetectorsBaF HV gain matching2021The preliminary gain matching settings for
a full ADC range of ~12MeV:
 BaF_Na22_gain_match_v1.pngbaf_gain_match_v1.dat 
  291   Thu Apr 22 10:56:20 2021 JanDetectorstarget-chamber det. distances2021This is the lookup table for the distance
of each x-ray detector to the target.
See attached foto for explanation.
 E127_xray_distances.jpg 
  292   Wed Apr 28 09:12:47 2021 Jan, YuriDetectorsUI-diagram2021The UI-curve of the detector
U I
10 0.11
 UI_meas_curve.pdf 
  307   Tue May 4 14:34:51 2021 Jan GloriusDetectorsXray weight control induces signals2021When the readout/control of the det. weight
control via serial connection is active,
there is a clear signal induced in the Xray
  
  363   Fri May 21 11:55:24 2021 JanDetectorsSI MSCF settings v12021attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not
BaF!
 setting_test.1621590878 
  390   Sat May 22 17:13:48 2021 LaszloDetectorsSi position changed2021Si was moved from -25 mm to -19 mm before
run 0072.
  
  397   Sat May 22 21:33:22 2021 LaszloDetectorsXray detectors are filled at 90 and 352021    
  478   Wed May 26 20:34:50 2021 Ragan, ThanassisDetectorsDetector filling2021Jan is filling the detector after run0137.   
  567   Sun May 30 14:40:55 2021 Jan, SophiaDetectorsreal detector assignment2021************************************
GEM1800 @ 90deg (xray1) 
GLP2000 @ 35deg (xray2)
  
  577   Wed Jul 14 14:46:05 2021 Jan, SophiaDetectorscollimator geometry2021We have measured the collimator geometry.
The annotations of the variables can be found
in the attached sketch  
 10x 
  5   Fri Apr 5 05:46:20 2019 JanDAQrunning DRASI for (p,g) We now have a drasi DAQ running for our (p,g)
experiments.
The RIO we have it installed right now is:
  
  6   Fri Apr 5 06:05:55 2019 JanDAQmaking changes to the DAQ  If you need to add or change a module of the
VME crate you need to follow this proceedure:
  
  12   Fri Jun 7 15:57:41 2019 JanDAQDAQ with & without MDPP-16 The DAQ located in 

../esrdaq_2018/r4l-58/ 
  
  25   Wed Oct 23 14:51:43 2019 Jan, LaszloDAQVME modules & main.cfg Here is the current list of VME modules in
our DRASI daq including HW addresses:
 main.cfg 
  26   Wed Oct 23 15:35:29 2019 JanDAQDAQ with & without MDPP-16 the DAQ located in
../esrdaq_2018/r4l-58_dev/
  
  31   Thu Jan 23 16:35:47 2020 LaszloDAQcable documentation    cable_documentation_e127.pdfcable_documentation_e127.ods 
  34   Fri Feb 21 09:39:40 2020 LaszloDAQcable documentation    cable_documentation_e127.pdfcable_documentation_e127.ods 
  39   Wed Mar 11 09:08:21 2020 JanDAQDAQ & controls - OVERVIEW For all DAQ & slow control buissines the user