Entry  Tue Nov 24 15:35:49 2020, Jan, Calibration, DSSD X/Y channel mapping, 2021 
During the detector test test measurements with alpha source the allocation of the 16 X- and 16 Y-channels has been checked.

For the following final allocation, it is always assumed that the (horizontal) y-strips are placed to face the beam directly, while the (vertical) x-strips are on the backside.

Now, all cables from the preamp to the ADC/TDCs are either labeled BLACK (= X-strips, pos. signals) or labeled RED (= Y-strips, neg. signals). These red or black connections should be kept consistently in order to ensure a well known orientation of the DSSD during the experiment. The test run Si2_run006.lmd was taken with this final assignment and serves as reference.

BLACK LABEL > X1 to X16 > pos. MSCF > ADC/TDC ch 0-15 > 50 Ohm resistor at preamps HV-input
RED LABEL > Y1 to Y16 > neg. MSCF > ADC/TDC ch 16-31 > neg. bias voltage at preamps HV-input

Additionally, the RED label indicates the section on the preamp to which negative bias voltage should be applied.
Entry  Tue Feb 2 13:59:00 2021, Jan, Detectors, DSSD installation and alignment, 2021 
The DSSD has been exchanged and aligned in 
November 2020. After bakeout at 140°C 
(externally, 120°C at internal temp. Sensor) 
for more than a week, the vacuum in the setup 
is roughly 4.5e-10 mbar.

After the bakeout the detector had to be 
realigned, it was lower by 1-2 mm. Using the 
line laser the realignment was done by 
touching only the screws on the far part of 
the base of the flange. These screws have been 
thightend by about a 1/4 turn after releasing 
the headless positioning screw accordingly.
Entry  Wed Mar 31 13:52:04 2021, Jan, Detectors, BaF Na22 Testing, 2021 
On 30. and 31.03.2021 we did some testing with the 6 BaF detectors.

Trigger & threshold:
With a threshold at ~250 keV, each detector has an trigger rate of about 0.5kHz due to internal activity.

Energy spectra
All detectors showed the Na22 lines (511 + 1275 keV) and also the lines from internal activity.
The energy resolution was on the order of 8.5 - 11 keV, depending on the detector.

Time spectra
Raw TDC spectra showed self-stop peak.
TDC diff spectra (between detectors) show one main (sharp) correlation peak about 8ns = 30ch*0.293ns/ch off the zero. 
At very low intensity a time structure around this peak is visible in a region of 120ns around the main peak. This is not understood, the energy spectra look similar for all these time regions (above/on/below the main peak).
Additionally, the coincidence E-specta between detector 1 and 2 (gating on the main time peak), nicely showed only the 511 keV line from Na22 and some gras.

Overnight test run:
Det. 1, 2, 3, 4 with the Na22 source

lxg1275:/data.local3/e127/lmd_2021/test/
e127b_run0021.lmd
e127b_run0022.lmd
e127b_run0023.lmd
e127b_run0024.lmd
e127b_run0025.lmd
e127b_run0026.lmd
e127b_run0027.lmd
e127b_run0028.lmd
e127b_run0029.lmd
e127b_run0030.lmd
e127b_run0031.lmd
e127b_run0032.lmd
e127b_run0033.lmd
e127b_run0034.lmd

Gain matched HV settings: https://elog.gsi.de/esr/E127/289

Issues to solve:
- 2 missing HV channels
- Go4 Analysis not stable
- trigger not on Baf but on Si
Entry  Wed Mar 31 13:57:27 2021, Jan, Detectors, BaF HV settings, 2021 
The setting below is a start value for final gain matching with a full ADC range of 12MeV:

Det.Nr. ADC/TDC ch HV MSCF Gain
1 20 2400V 6
2 21 1780V 6
3 22 2350V 6
4 23 2130V 6
5 24 2050V 6
6 25 1780V 6
Entry  Wed Apr 14 09:42:50 2021, Jan, Detectors, BaF HV gain matching, 2021 BaF_Na22_gain_match_v1.pngbaf_gain_match_v1.dat
The preliminary gain matching settings for a full ADC range of ~12MeV:

Det.Nr. ADC/TDC ch HV I comment
1 20 2400V 390uA CAEN HV ch0
2 21 1763V 287uA CAEN HV ch1
3 22 2340V 380uA CAEN HV ch2
4 23 2175V 354uA CAEN HV ch3
5 24 2017.5V ? emetron HV
6 25 1780V ? not yet biased


Attached is a 22Na-spectrum taken with detectors 1 - 5.
The used MSCF settings are also attached.

Detector 6 does not yet have a HV channel available.
Entry  Thu Apr 22 10:56:20 2021, Jan, Detectors, target-chamber det. distances, 2021 E127_xray_distances.jpg
This is the lookup table for the distance of each x-ray detector to the target.
See attached foto for explanation.

It is the same values as in 2020: https://elog.gsi.de/esr/E127/36

Detector A (dA) [mm] B (dB) [mm] C (dC) [mm] calculate result [mm]
35° 136.0 (1.0) 20.0 (0.2) 450.0 (0.5) C + B - A 334.0 (?)
90° 76.0 (0.5) 20.0 (0.2) 447.0/2 = 223.5 (1.0) C + B - A 167.5 (?)
145° 165.0 (1.0) 20.0 (0.2) 450.0 (0.5) C + B - A 305.0 (?)

Errors are estimated after measurement, final errorbars have to be double checked!
Entry  Fri May 21 10:00:51 2021, Jan, Accelerator, target bump, 2021 
The target overlap was optimized on xray and si rates.
The setting now is -10mm in SC9
Entry  Fri May 21 11:55:24 2021, Jan, Detectors, SI MSCF settings v1, 2021 setting_test.1621590878
attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not BaF!
Entry  Fri May 21 12:21:57 2021, Jan, Runs, Run 0053, 2021 
open file : e127b_run0053.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 12:21:34 21-05-2021
run stop: 14:05:27 21-05-2021

_______________________________________________________________________________

ON Rates
Si_bdt: 15 Hz
Xray_35: 20 Hz
Xray_90: 200 Hz
Xray_145: 70 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 360 uA


SIS particles before:
ESR current at injection: 3e7
ESR particles after decel.: 5e6
Target ON density: 9e13
Entry  Fri May 21 14:06:23 2021, Jan, Runs, Run 0054, 2021 
open file : e127b_run0054.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 14:06:04 21-05-2021
run stop: 15:14:48 21-05-2021

_______________________________________________________________________________

ON Rates
Si_bdt: 31 Hz
Xray_35: 145 Hz
Xray_90: 10 Hz
Xray_145: 56 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 350 uA


SIS particles before:
ESR current at injection: 3e7
ESR particles after decel.: 5e6
Target ON density: 9e13
Entry  Fri May 21 15:15:59 2021, Jan, Runs, Run 0055, 2021 
open file : e127b_run0055.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 15:14:48 21-05-2021
run stop: 15:10:10 21-05-2021

_______________________________________________________________________________

ON Rates
Si_bdt: 21 Hz
Xray_35: 143 Hz
Xray_90: 7 Hz
Xray_145: 63 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 350 uA


SIS particles before:
ESR current at injection:
ESR particles after decel.:
Target ON density: 10e13
Entry  Fri May 21 19:36:46 2021, Jan, Runs, Run 0056, 2021 
open file : e127b_run0056.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 19:19:52 21-05-2021
run stop: 20:08:08 21-05-2021

_______________________________________________________________________________

ON Rates
Si_bdt: 81 Hz
Xray_35: 514 Hz
Xray_90: 20 Hz
Xray_145: 127 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 4e7
ESR particles after decel.: 4e6
Target ON density: 9e13
Entry  Fri May 21 20:09:00 2021, Jan, Runs, Run 0057, 2021 
open file : e127b_run0057.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 20:08:08 21-05-2021
run stop: 21:01:58 21-05-2021
_______________________________________________________________________________

ON Rates
Si_bdt: 73 Hz
Xray_35: 584 Hz
Xray_90: 20 Hz
Xray_145: 130 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 2.5e7
ESR particles after decel.: 4e6
Target ON density: 9e13
Entry  Fri May 21 21:02:53 2021, Jan, Runs, Run 0058, 2021 
open file : e127b_run0058.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 21:01:58 21-05-2021
run stop: 22:00:05 21-05-2021
_______________________________________________________________________________

ON Rates
Si_bdt: 94 Hz
Xray_35: 581 Hz
Xray_90: 15 Hz
Xray_145: 123 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.4e7
ESR current at injection: 2.8e7
ESR particles after decel.: 2.5e6
Target ON density: 9.8e13
Entry  Sun May 23 23:44:37 2021, Jan, Runs, Run 0088 - background BaF/Xray, 2021 
open file : e127b_run0088.lmd

no beam

purpose:
BG measurement for Xray and BaF

run start: 23:44:09 23.05.2021
run stop:
_______________________________________________________________________________

ON Rates
Si_OFF_bdt: Hz
Xray_ON_bdt: 60Hz
BaF_OR: 3000Hz
Entry  Tue May 25 07:51:48 2021, Jan, Accelerator, ESR stacking cycle length, 2021 
The full cycle length of ESR with 30 stacks is about 7:45 minutes, out of which 15.5 sec are with target switched ON.
This is without CMB/HTD in parallel.
Entry  Tue May 25 08:36:15 2021, Jan, General, lessons learned, 2021 
1. before using stoch. cooling in ESR, boot and update the windows PC
2. better diagnostics for low energy/intensity beam-target overlapp in ESR is needed (either a clever analysis or a new detector)
more to come
Entry  Tue May 25 11:58:30 2021, Jan, Analysis, 118(p,g) counts until run0115, 2021 run91to115_Si_map.pngrun91to115_Si_projection.png
The two attached plots show the collected Si data up to run0115.

Within this ~15h we have about ~70 counts in the peak region.

This translates to ~4.5 counts per hour.
And shall be compared to the 1 count/hour we had last year.
Entry  Wed May 26 14:28:23 2021, Jan, Analysis, Xrays from 118Te & 124Xe, 2021 xray90_124Xe_118Te.png
Attached is a plot of the uncalibrated energy spectra taken with the 90 degree xray detector for 118Te (red) and 124Xe (blue).
Shown is the region covering the K-alpha and K-REC peaks.

Calculating the ratios (Te/Xe) for K_alpha and K-REC energies from theory one gets:

K_alpha (theory): 0.9236  
K-REC   (theory): 0.9308

Without energy calibration we get the following ratio (using channel numbers):

K_alpha (exp): 0.9293  
K-REC   (exp): 0.9344

Taking into account that the channel numbers are not calibrated, the agreement is still very good.

In summary we can be sure that we have 118Te stored at 7AMeV.
Entry  Thu May 27 13:26:35 2021, Jan, Accelerator, FRS degrader failure, 2021 
Maybe, our degrader in FRS was removed by hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
All runs taken in this period have to be double checked!

However, the xray lines from this night show Te for k_alpha and K-KREC

It is also possible that the readout of this degrader motor was just wrong due to its state as hand-controlled.