Entry  Fri May 28 14:40:03 2021, Jan, Runs, run0175 - BaF calib. 22Na, 2021 
 
Entry  Fri May 28 15:15:06 2021, Jan, Analysis, 118Te(p,g) counts runs 135 to 174, 2021 run135to174_Si_map.pngrun135to174_Si_projection.png
This is the summary of all Si data collected at 6 MeV/u until run174 before the Alvarez problem.
We have roughly 50-60 counts in the peak region.
This data corresponds roughly to 36hours of beam, which means ~1.5 to 2 counts/hour.
Entry  Wed Jun 2 09:14:04 2021, Jan, General, Telegram Chat Export, 2021 E127_TelegramChat.pdfE127_TelegramChat_json.zip
Attached is the exported Telegram chat.
There is the simple PDF and the zip-file containing the chat in json-format as well as all media files.
Entry  Thu Jul 8 13:39:34 2021, Jan, Calibration, Electron cooler parameters, 2021 
Below are the results from the e-cooler voltage offset measurments done by Regina Hess et al. using the voltage divider (VD).

--7 MeV-- 
Entry  Thu Jul 8 14:07:19 2021, Jan, Calibration, beam energies, 2021 CodeCogsEqn.pngCodeCogsEqn(1).png
Table of ion energies calculated from cooler parameters

[TABLE border="1"]
Entry  Wed Oct 13 15:09:04 2021, Jan, Collaboration, K-REC cross sections A. Surzhykov, 2021 DCS_Z_52_Tp_7.049MeV_NEW.datDCS_Z_54_Tp_7.049MeV_NEW.datDCS_Z_52_Tp_6.042MeV_NEW.dat
Attached are the theory K-REC cross sections as calculated by Andrey Surzhykov (August 2021).

They are done for 118Te52+ on H2 at 7.049 and 6.042 MeV/u as well as for 124Xe54+ on H2 at 7.049 MeV/u.
Entry  Wed Oct 13 15:15:53 2021, Jan, DAQ, root-file header for analysis, 2021 e127b.h
Attached is the header file needed for root analysis.
Entry  Thu May 13 17:38:13 2021, Jacobus Swartz, Calibration, Runlist for X-ray detector calibrations, 2021 E127_Runlist-calibrations-4-3.xlsx
Here is a run summary of all the calibration measurements performed so far on the three X-ray detectors. 
Entry  Mon May 24 05:20:36 2021, Helmut, Yuri, Faraz, Sergey, Accelerator, FRS setup, 2021 14x
Logbook from start of FRS until 118Te injection
Entry  Wed May 19 15:09:22 2021, Helmut Weick, General, FRS settings, LISE file, 2021 frequencies-E127.xlsxFRS-settings-E127.docx124Xe_ESR_Predrilling.lpp124Xe_118Te_2mmSci_oldmode.lpp124Xe_118Te_2mmSci_newoptics.lpp
Here is a setting plan for FRS and corresponding LISE files.
2 LISE files still use the old FRS-ESR optics, one the new with S6 focus on slits. 
But this does not make a big difference for the simulation, only dispersion S2-S6 is lower.
Entry  Thu May 27 13:48:18 2021, Helmut Weick, Accelerator, FRS wrong status display for one day, 2021 drivestat-log.JPG
By checking the log files we realized that from yesterday 26.05. 13:44 - today 13:05 the FRS degrader was shown as out.
TS3ET7US should be at -420.0mm not at -580mm (=out). This 3.26mm Sci is used as a degrader and is essential.
Entry  Sun Mar 22 14:23:50 2020, Esther, Ragan, Michael, Laszlo, Runs, run entry - run084, Uli working with gas jet target,  
Uli is still working with gas jet target. 
open file : run084
Entry  Sun Mar 22 09:52:09 2020, Esther, Ragan, Runs, run entry - run079,  
open file : run079

beam: 118Te52+
Entry  Sun Mar 22 10:05:37 2020, Esther, Ragan, General, run entry - run079,  
The intensity of beam from SIS is less due to some issues with UNILAc.
Entry  Sun Mar 22 10:22:27 2020, Esther, Ragan, Runs, run entry - run079,  
open file : run079

beam: 118Te52+
Entry  Sun Mar 22 10:28:27 2020, Esther, Ragan, General, run entry - run079,  
The problem at UNILAC seems to have solved itself. Intensity is returning to normal.
Entry  Sun Mar 22 10:53:36 2020, Esther, Ragan, Runs, run entry - run080,  
open file : run080

beam: 118Te52+
Entry  Sun Mar 22 11:28:02 2020, Esther, Ragan, Runs, run entry - run080,  
open file : run080

beam: 118Te52+
Entry  Sun Mar 22 11:37:37 2020, Esther, Ragan, Runs, run entry - run081, Uli working with gas jet target,  
Uli is here to work with the gas jet target.

open file : run081
Entry  Sun Mar 22 12:01:44 2020, Esther, Ragan, General, Vacuum problem with SIS,  
There is some problem with the vacuum in SIS and thus data recording is stopped.