  522  
 | 
Fri May 28 14:40:03 2021 | 
Jan | Runs | run0175 - BaF calib. 22Na | 2021 |   | 
   | 
| 
  523  
 | 
Fri May 28 15:15:06 2021 | 
Jan | Analysis | 118Te(p,g) counts runs 135 to 174 | 2021 | This is the summary of all Si data collected 
at 6 MeV/u until run174 before the Alvarez 
problem.
 | 
     | 
| 
  571  
 | 
Wed Jun  2 09:14:04 2021 | 
Jan | General | Telegram Chat Export | 2021 | Attached is the exported Telegram chat.
 
There is the simple PDF and the zip-file 
containing the chat in json-format as well | 
     | 
| 
  575  
 | 
Thu Jul  8 13:39:34 2021 | 
Jan | Calibration | Electron cooler parameters | 2021 | Below are the results from the e-cooler voltage 
offset measurments done by Regina Hess et 
al. using the voltage divider (VD).
 | 
   | 
| 
  576  
 | 
Thu Jul  8 14:07:19 2021 | 
Jan | Calibration | beam energies | 2021 | Table of ion energies calculated from cooler 
parameters
 
 | 
     | 
| 
  578  
 | 
Wed Oct 13 15:09:04 2021 | 
Jan | Collaboration | K-REC cross sections A. Surzhykov | 2021 | Attached are the theory K-REC cross sections 
as calculated by Andrey Surzhykov (August 
2021).
 | 
      | 
| 
  579  
 | 
Wed Oct 13 15:15:53 2021 | 
Jan | DAQ | root-file header for analysis | 2021 | Attached is the header file needed for root 
analysis. | 
    | 
| 
  335  
 | 
Thu May 13 17:38:13 2021 | 
Jacobus Swartz | Calibration | Runlist for X-ray detector calibrations | 2021 | Here is a run summary of all the calibration 
measurements performed so far on the three 
X-ray detectors.  | 
    | 
| 
  413  
 | 
Mon May 24 05:20:36 2021 | 
Helmut, Yuri, Faraz, Sergey | Accelerator | FRS setup | 2021 | Logbook from start of FRS until 118Te injection | 
 14x   | 
| 
  352  
 | 
Wed May 19 15:09:22 2021 | 
Helmut Weick | General | FRS settings, LISE file | 2021 | Here is a setting plan for FRS and corresponding 
LISE files.
 
2 LISE files still use the old FRS-ESR optics, | 
        | 
| 
  497  
 | 
Thu May 27 13:48:18 2021 | 
Helmut Weick | Accelerator | FRS wrong status display for one day | 2021 | By checking the log files we realized that 
from yesterday 26.05. 13:44 - today 13:05 
the FRS degrader was shown as out.
 | 
    | 
| 
  189  
 | 
Sun Mar 22 14:23:50 2020 | 
Esther, Ragan, Michael, Laszlo | Runs | run entry - run084, Uli working with gas jet target |   | Uli is still working with gas jet target. 
 
open file : run084
 | 
   | 
| 
  176  
 | 
Sun Mar 22 09:52:09 2020 | 
Esther, Ragan | Runs | run entry - run079 |   | open file : run079
 
 
beam: 118Te52+
 | 
   | 
| 
  177  
 | 
Sun Mar 22 10:05:37 2020 | 
Esther, Ragan | General | run entry - run079 |   | The intensity of beam from SIS is less due 
to some issues with UNILAc. | 
   | 
| 
  178  
 | 
Sun Mar 22 10:22:27 2020 | 
Esther, Ragan | Runs | run entry - run079 |   | open file : run079
 
 
beam: 118Te52+
 | 
   | 
| 
  179  
 | 
Sun Mar 22 10:28:27 2020 | 
Esther, Ragan | General | run entry - run079 |   | The problem at UNILAC seems to have solved 
itself. Intensity is returning to normal. | 
   | 
| 
  180  
 | 
Sun Mar 22 10:53:36 2020 | 
Esther, Ragan | Runs | run entry - run080 |   | open file : run080
 
 
beam: 118Te52+
 | 
   | 
| 
  181  
 | 
Sun Mar 22 11:28:02 2020 | 
Esther, Ragan | Runs | run entry - run080 |   | open file : run080
 
 
beam: 118Te52+
 | 
   | 
| 
  182  
 | 
Sun Mar 22 11:37:37 2020 | 
Esther, Ragan | Runs | run entry - run081, Uli working with gas jet target |   | Uli is here to work with the gas jet target.
 
 
open file : run081
 | 
   | 
| 
  183  
 | 
Sun Mar 22 12:01:44 2020 | 
Esther, Ragan | General | Vacuum problem with SIS |   | There is some problem with the vacuum in SIS 
and thus data recording is stopped. | 
   |