HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 26 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Category Subject Year Text Attachments
  522   Fri May 28 14:40:03 2021 JanRunsrun0175 - BaF calib. 22Na2021    
  523   Fri May 28 15:15:06 2021 JanAnalysis118Te(p,g) counts runs 135 to 1742021This is the summary of all Si data collected
at 6 MeV/u until run174 before the Alvarez
problem.
 run135to174_Si_map.pngrun135to174_Si_projection.png 
  571   Wed Jun 2 09:14:04 2021 JanGeneralTelegram Chat Export2021Attached is the exported Telegram chat.
There is the simple PDF and the zip-file
containing the chat in json-format as well
 E127_TelegramChat.pdfE127_TelegramChat_json.zip 
  575   Thu Jul 8 13:39:34 2021 JanCalibrationElectron cooler parameters2021Below are the results from the e-cooler voltage
offset measurments done by Regina Hess et
al. using the voltage divider (VD).
  
  576   Thu Jul 8 14:07:19 2021 JanCalibrationbeam energies2021Table of ion energies calculated from cooler
parameters
 CodeCogsEqn.pngCodeCogsEqn(1).png 
  578   Wed Oct 13 15:09:04 2021 JanCollaborationK-REC cross sections A. Surzhykov2021Attached are the theory K-REC cross sections
as calculated by Andrey Surzhykov (August
2021).
 DCS_Z_52_Tp_7.049MeV_NEW.datDCS_Z_54_Tp_7.049MeV_NEW.datDCS_Z_52_Tp_6.042MeV_NEW.dat 
  579   Wed Oct 13 15:15:53 2021 JanDAQroot-file header for analysis2021Attached is the header file needed for root
analysis.
 e127b.h 
  335   Thu May 13 17:38:13 2021 Jacobus SwartzCalibrationRunlist for X-ray detector calibrations2021Here is a run summary of all the calibration
measurements performed so far on the three
X-ray detectors. 
 E127_Runlist-calibrations-4-3.xlsx 
  413   Mon May 24 05:20:36 2021 Helmut, Yuri, Faraz, SergeyAcceleratorFRS setup2021Logbook from start of FRS until 118Te injection  14x 
  352   Wed May 19 15:09:22 2021 Helmut WeickGeneralFRS settings, LISE file2021Here is a setting plan for FRS and corresponding
LISE files.
2 LISE files still use the old FRS-ESR optics,
 frequencies-E127.xlsxFRS-settings-E127.docx124Xe_ESR_Predrilling.lpp124Xe_118Te_2mmSci_oldmode.lpp124Xe_118Te_2mmSci_newoptics.lpp 
  497   Thu May 27 13:48:18 2021 Helmut WeickAcceleratorFRS wrong status display for one day2021By checking the log files we realized that
from yesterday 26.05. 13:44 - today 13:05
the FRS degrader was shown as out.
 drivestat-log.JPG 
  189   Sun Mar 22 14:23:50 2020 Esther, Ragan, Michael, LaszloRunsrun entry - run084, Uli working with gas jet target Uli is still working with gas jet target.

open file : run084
  
  176   Sun Mar 22 09:52:09 2020 Esther, RaganRunsrun entry - run079 open file : run079

beam: 118Te52+
  
  177   Sun Mar 22 10:05:37 2020 Esther, RaganGeneralrun entry - run079 The intensity of beam from SIS is less due
to some issues with UNILAc.
  
  178   Sun Mar 22 10:22:27 2020 Esther, RaganRunsrun entry - run079 open file : run079

beam: 118Te52+
  
  179   Sun Mar 22 10:28:27 2020 Esther, RaganGeneralrun entry - run079 The problem at UNILAC seems to have solved
itself. Intensity is returning to normal.
  
  180   Sun Mar 22 10:53:36 2020 Esther, RaganRunsrun entry - run080 open file : run080

beam: 118Te52+
  
  181   Sun Mar 22 11:28:02 2020 Esther, RaganRunsrun entry - run080 open file : run080

beam: 118Te52+
  
  182   Sun Mar 22 11:37:37 2020 Esther, RaganRunsrun entry - run081, Uli working with gas jet target Uli is here to work with the gas jet target.

open file : run081
  
  183   Sun Mar 22 12:01:44 2020 Esther, RaganGeneralVacuum problem with SIS There is some problem with the vacuum in SIS
and thus data recording is stopped.
  
ELOG V3.1.5-fc6679b