HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
proton-capture on 118Te, Page 25 of 29
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
Simulations
Accelerator
572 Entries
Goto page
Previous
1
,
2
,
3
...
24
, 25,
26
,
27
,
28
,
29
Next
ID
Date
Author
Category
Subject
Year
Text
286
Tue Nov 24 15:35:49 2020
Jan
Calibration
DSSD X/Y channel mapping
2021
During the detector test [URL=https://elog.gsi.de/esr/E127/284]test
measurements[/URL] with alpha source the
allocation of the 16 X- and 16 Y-channels
287
Tue Feb 2 13:59:00 2021
Jan
Detectors
DSSD installation and alignment
2021
The DSSD has been exchanged and aligned in
November 2020. After bakeout at 140°C
288
Wed Mar 31 13:52:04 2021
Jan
Detectors
BaF Na22 Testing
2021
On 30. and 31.03.2021 we did some testing
with the 6 BaF detectors.
289
Wed Mar 31 13:57:27 2021
Jan
Detectors
BaF HV settings
2021
The setting below is a start value for final
gain matching with a full ADC range of 12MeV:
290
Wed Apr 14 09:42:50 2021
Jan
Detectors
BaF HV gain matching
2021
The preliminary gain matching settings for
a full ADC range of ~12MeV:
291
Thu Apr 22 10:56:20 2021
Jan
Detectors
target-chamber det. distances
2021
This is the lookup table for the distance
of each x-ray detector to the target.
See attached foto for explanation.
361
Fri May 21 10:00:51 2021
Jan
Accelerator
target bump
2021
The target overlap was optimized on xray and
si rates.
The setting now is -10mm in SC9
363
Fri May 21 11:55:24 2021
Jan
Detectors
SI MSCF settings v1
2021
attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not
BaF!
364
Fri May 21 12:21:57 2021
Jan
Runs
Run 0053
2021
open file : e127b_run0053.lmd
beam: 124Xe54+
365
Fri May 21 14:06:23 2021
Jan
Runs
Run 0054
2021
open file : e127b_run0054.lmd
beam: 124Xe54+
366
Fri May 21 15:15:59 2021
Jan
Runs
Run 0055
2021
open file : e127b_run0055.lmd
beam: 124Xe54+
369
Fri May 21 19:36:46 2021
Jan
Runs
Run 0056
2021
open file : e127b_run0056.lmd
beam: 124Xe54+
370
Fri May 21 20:09:00 2021
Jan
Runs
Run 0057
2021
open file : e127b_run0057.lmd
beam: 124Xe54+
371
Fri May 21 21:02:53 2021
Jan
Runs
Run 0058
2021
open file : e127b_run0058.lmd
beam: 124Xe54+
412
Sun May 23 23:44:37 2021
Jan
Runs
Run 0088 - background BaF/Xray
2021
open file : e127b_run0088.lmd
no beam
438
Tue May 25 07:51:48 2021
Jan
Accelerator
ESR stacking cycle length
2021
The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
439
Tue May 25 08:36:15 2021
Jan
General
lessons learned
2021
1. before using stoch. cooling in ESR, boot
and update the windows PC
2. better diagnostics for low energy/intensity
445
Tue May 25 11:58:30 2021
Jan
Analysis
118(p,g) counts until run0115
2021
The two attached plots show the collected
Si data up to run0115.
469
Wed May 26 14:28:23 2021
Jan
Analysis
Xrays from 118Te & 124Xe
2021
Attached is a plot of the uncalibrated energy
spectra taken with the 90 degree xray detector
for 118Te (red) and 124Xe (blue).
496
Thu May 27 13:26:35 2021
Jan
Accelerator
FRS degrader failure
2021
Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
Goto page
Previous
1
,
2
,
3
...
24
, 25,
26
,
27
,
28
,
29
Next
ELOG V3.1.5-fc6679b