HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 25 of 29  Not logged in ELOG logo
ID Date Authordown Category Subject Year Text Attachments
  286   Tue Nov 24 15:35:49 2020 JanCalibrationDSSD X/Y channel mapping2021During the detector test [URL=https://elog.gsi.de/esr/E127/284]test
measurements[/URL] with alpha source the
allocation of the 16 X- and 16 Y-channels
  
  287   Tue Feb 2 13:59:00 2021 JanDetectorsDSSD installation and alignment2021The DSSD has been exchanged and aligned in

November 2020. After bakeout at 140°C 
  
  288   Wed Mar 31 13:52:04 2021 JanDetectorsBaF Na22 Testing2021On 30. and 31.03.2021 we did some testing
with the 6 BaF detectors.
  
  289   Wed Mar 31 13:57:27 2021 JanDetectorsBaF HV settings2021The setting below is a start value for final
gain matching with a full ADC range of 12MeV:
  
  290   Wed Apr 14 09:42:50 2021 JanDetectorsBaF HV gain matching2021The preliminary gain matching settings for
a full ADC range of ~12MeV:
 BaF_Na22_gain_match_v1.pngbaf_gain_match_v1.dat 
  291   Thu Apr 22 10:56:20 2021 JanDetectorstarget-chamber det. distances2021This is the lookup table for the distance
of each x-ray detector to the target.
See attached foto for explanation.
 E127_xray_distances.jpg 
  361   Fri May 21 10:00:51 2021 JanAcceleratortarget bump2021The target overlap was optimized on xray and
si rates.
The setting now is -10mm in SC9
  
  363   Fri May 21 11:55:24 2021 JanDetectorsSI MSCF settings v12021attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not
BaF!
 setting_test.1621590878 
  364   Fri May 21 12:21:57 2021 JanRunsRun 00532021open file : e127b_run0053.lmd

beam: 124Xe54+
  
  365   Fri May 21 14:06:23 2021 JanRunsRun 00542021open file : e127b_run0054.lmd

beam: 124Xe54+
  
  366   Fri May 21 15:15:59 2021 JanRunsRun 00552021open file : e127b_run0055.lmd

beam: 124Xe54+
  
  369   Fri May 21 19:36:46 2021 JanRunsRun 00562021open file : e127b_run0056.lmd

beam: 124Xe54+
  
  370   Fri May 21 20:09:00 2021 JanRunsRun 00572021open file : e127b_run0057.lmd

beam: 124Xe54+
  
  371   Fri May 21 21:02:53 2021 JanRunsRun 00582021open file : e127b_run0058.lmd

beam: 124Xe54+
  
  412   Sun May 23 23:44:37 2021 JanRunsRun 0088 - background BaF/Xray2021open file : e127b_run0088.lmd

no beam
  
  438   Tue May 25 07:51:48 2021 JanAcceleratorESR stacking cycle length2021The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
  
  439   Tue May 25 08:36:15 2021 JanGenerallessons learned20211. before using stoch. cooling in ESR, boot
and update the windows PC
2. better diagnostics for low energy/intensity
  
  445   Tue May 25 11:58:30 2021 JanAnalysis118(p,g) counts until run01152021The two attached plots show the collected
Si data up to run0115.
 run91to115_Si_map.pngrun91to115_Si_projection.png 
  469   Wed May 26 14:28:23 2021 JanAnalysisXrays from 118Te & 124Xe2021Attached is a plot of the uncalibrated energy
spectra taken with the 90 degree xray detector
for 118Te (red) and 124Xe (blue).
 xray90_124Xe_118Te.png 
  496   Thu May 27 13:26:35 2021 JanAcceleratorFRS degrader failure2021Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
  
ELOG V3.1.5-fc6679b