HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Dielectronic recombination-assisted laser spectroscopy, Page 2 of 6  Not logged in ELOG logo
ID Date Author Categorydown Subject Text Attachments
  27   Tue May 10 11:59:45 2022 Simon, Christopher, Kristian, SebastianLaserLabview VI checkupsThe lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74
  
  28   Tue May 10 15:26:35 2022 Rodolfo, MaxLaserLaser stabilisation runningIt is now possible to stabilize and move the
laser with both stages.
 MRC_Settings_for_Bismuth_10-05-2022.PNGMRC_hardware_Setting.PNG 
  35   Wed May 11 01:09:07 2022 Patrick, Sebastian, Volker, GuyLaserBeam overlapWe overlapped the laser with the ion beam.

The ion beam positions are:
 2022-05-11_final_laser_spot.PNG2022-05-11_final_MRC_settings_2.PNG 
  36   Wed May 11 03:10:55 2022 Patrick, Sebastian, Volker, Guy LaserLaser - bunch timingWe added the delay and gate generator in between
the bunch trigger and the CFD to move the
timing of the PMT middle signal relative
 2022-05-06_Bi2023_laserscan_test.png 
  44   Wed May 11 14:59:01 2022 RodolfoLaserLaser statusI have measured the output energy of the laser
system. All values in [mJ] and over 500 laser-pulses
average
  
  49   Wed May 11 22:19:17 2022 Max, Wilfried, VolkerLaserlaser bunch timingWe overlapped the laser and ion bunch in the
time domain. The delay has to be set on the
module above the laser and NOT in the ESR
 timing10_5_22.png 
  62   Thu May 12 15:21:23 2022 Sebastian, SimonLaserFlash lamps changedWe (Sebastian and I) changed the flash lamps
of the Quanta Ray Laser and measured the
output energy of the laser system afterwards
  
  70   Mon May 16 15:57:37 2022 RodolfoLaserWavemeter calibrationI have calibrated our Wavemeter WS7 using
the temperature stabilized He-Ne Laser (SIOS
EN60 825-1:2014). In the screenshots below
 WS7_VorKalibrationMitHe-Ne_16-05-2022.PNGWS7_NachKalibrationMitHe-Ne_16-05-2022.PNG 
  75   Mon May 16 21:08:48 2022 Rodolfo & MaxLaserLaser powerWe checked the energy of the laser and optimized
it a bit
  
  82   Fri May 27 14:57:23 2022 RodolfoLaserLaser EnergyI have started up the laser system (Q-Ray
& Cobra) again. Here some parameters*:
  
  84   Mon May 30 00:56:33 2022 Max, PatrickLaserBeam overlapThe ion beam positions are (+- 1mm):

 2022-05-30_laser_beam.png2022-05-30_beamstab_settings.png 
  92   Mon May 30 19:42:20 2022 Rodolfo & KristianLaserChanging laser wavelengthWe have changed the laser wavelength, e.g.
the dye for the Cobra to Fluorescein 27.
  
  97   Tue May 31 03:18:52 2022 Patrick, KonstantinLaserLaser timingThe final timings are (in bins +-1):

PD NO: 103
  
  104   Tue May 31 21:58:55 2022 Max, RodolfoLaserMRC Settings for 209Bi We have change the laser settings for the
spectroscopy of 209Bi. 
 MRC_209Bi_31-05-2022_2157.png 
  108   Wed Jun 1 17:20:04 2022 RodolfoLaserHeNe @ WS7   HeNe_WS7_01-06-2022_1.png 
  111   Fri Jan 13 17:05:22 2023 RodolfoLaserTesting WS6Testing the new Wavemeter (HighFinesse, WS6,
SN3950) with the QRAY laser light @ 532 nm.
Multimode fiber von High Finesse:FC/PC S
 WS6_3950_QRayWavelength_13-01-2022.png 
  112   Wed Jan 18 13:02:12 2023 RodolfoLaserTesting WS6 with CobraTesting the WS6 (S.N. 3950) together with
the Cobra. 
 WS6_640-639.8_0.005_18-01-2023_11.23.png 
  113   Tue Jun 6 09:33:00 2023 RodolfoLaserFiber couplerCobra's new fiber-coupling unit for wavelength
reading.
 Cobra_FiberCoupler.jpg 
  17   Mon May 9 11:45:57 2022 Wilfried, Jon, SebastianGeneralHV Divider position & DMM calibrationWe performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
 DMM_calibration.PNGdividerPosition.PNGdividerPosition1.PNG 
  34   Tue May 10 23:53:42 2022 RodolfoGeneralshift changeThe night shift took over. They are trying
now to overlap the ion and laser beams. 
  
ELOG V3.1.5-fc6679b