HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ę128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+ 2024, Page 3 of 4  Not logged in ELOG logo
Entry  Thu Jun 6 19:47:01 2024, Carsten, DAQ, Exchange of Mesytec CFD/shaper - noise on signal lines from ESR magnets 
Jan exchanged the Mesytec CFD/shper since it could not be "remote controlled" anymore. The new one has different shaping times and delays.
It is noted the threshold range is rather small. 
With the new  shaper only the x100 signals could meaningfully discriminated etc.
Entry  Fri Jun 7 09:15:31 2024, Carsten, DAQ, Updated Channel List ChannelList.pdfChannelList.odt
 
Entry  Sat Jun 8 12:45:05 2024, Carsten, DAQ, Temporary change of RF signal 
The setting was 1.540974 MHz and division factor 68 (for a 200 MeV/u) beam, and the signal was taken from a signal generator.
I now switch to the "real" RF signal from the accelerator (~400MeV/u), that is 1.9693 MHz and the factor is set to 88.
This should be set back for laser tests or adjusted when we have the real decellerated beam.
Entry  Mon Jun 10 08:57:35 2024, Carsten/Konstantin, DAQ, Further Tests from Sunday 2024-06-09 - new voltages and tresholds for PMTs - testdata in files 
Voltages and thresholds increased for PMT Middle and North (in order to account for the ADC measurement in DAQ2

[TABLE border="1"]
Entry  Mon Jun 10 09:17:38 2024, Carsten, DAQ, Updated Channel List 2024_06_10_ChannelList.pdfChannelList.odt
 
Entry  Tue Jun 11 09:17:46 2024, Julien, Konstantin, Lukas, DAQ, Important commands (DAQ1) SSH_Connection.pngMBS_Start.pngDAQ1_startup.pngRates.pngBildschirmfoto_2024-06-11_10-01-38.png
To connect to the DAQ1 pc, open a terminal and type:
 ssh atplaser@r4l-41
Enter password for user atplaser ([B]note that you're typing on an English keyboard[/B]).
Entry  Sat Jun 1 18:14:01 2024, Carsten, Analysis, DAQ and analysis directories 
[U][B]DAQ1 (original):[/B][/U]
-user atplaser
-runs on lxg1297
Entry  Sat Jun 1 18:55:18 2024, Carsten, Analysis, Go4 Analysis Version for DAQ1 (atplaser) 
Small enhancements and minor corrections / bug fixes are made to the original version of the online GO$ for DAQ1.
Assignment of channel names corrected, condition names adapted to present DAQ
Potential pitfalls are commented in the code.
Entry  Mon Jun 10 11:59:12 2024, Ruijiu Chen, Analysis, The ion identification of spectrum recorded on 2022 simulation_result.outE142_TEline-ESR_229Th.lppThe_ion_identification_of_spectrum_recorded_on_2022_v2.pdf
The simulated frequency is given in simulation_result.out. The yield is calculated by LISE file. The LISE file is attached here also.
Entry  Wed Jun 12 01:51:51 2024, RuiJiu, David, Analysis, ID E142_TEline-ESR_229Th.lppsimulation_result.out229Th89_124h.png229Th89_125h.png
The preliminary identification has been thoroughly checked using the RionID software. We have confirmed that the identification is accurate.

Attached can be found the simulation file with each of the expected ions, their revolutions frequencies in the 125th harmonic and expected yield from the
Entry  Thu Jun 13 12:37:14 2024, Ruijiu Chen, David, Analysis, Lifetime of beam in center of mass is 193 s. Lifetime_of_beam.pdf
 
Entry  Thu Jun 13 13:29:47 2024, Ruijiu Chen, David, Analysis, Lifetime of beam during June 12 22:00- June 13 0:00 Lifetime_of_beam2.pdf
 
Entry  Thu Jun 13 14:20:36 2024, Ruijiu Chen, David, Analysis, Lifetime of beam during June 13 4:30:7:00 Lifetime_of_beam3.pdf
 
Entry  Thu Jun 13 14:35:27 2024, Ruijiu Chen, David, Analysis, Lifetime of beam during June 13 7:00~9:00 Lifetime_of_beam4.pdf
 
Entry  Thu Jun 13 14:41:22 2024, Ruijiu Chen, David, Analysis, Lifetime of beam during June 13 9:00~11:00 Lifetime_of_beam5.pdf
 
Entry  Thu Jun 13 18:48:26 2024, Ruijiu Chen, David, Shahab, Yuri, Analysis, The ion identification of 229Th is correct. simulation_result.outLifetime_of_beam7.pdf
Harmonic: 124.0 , Bp: 7.796046 [Tm]
ion            fre[Hz]                       yield [pps]    
------------------------------------------------------------
Entry  Wed Jun 26 11:59:12 2024, Ruijiu, Shahab, Carsten, Analysis, Prepare plots for Thomas's presentation 6x
data:
(env_OnlineDataAnalysisSystem) litv-exp@lxbk0497:/lustre/astrum/experiment_data/2024-05_E018/OnlineDataAnalysisSystem/data/iq/IQ_2024-06-
12_21-47-54$
Entry  Wed Jun 5 14:17:36 2024, Carsten, Accelerator, Distance Cooler Detector 
Calculation from Helmut Weick (copied from E142)
Distance e-cooler to particle detectors chamber:
“This is half of ESR plus distance target - detector. This even is on the web page”
Entry  Thu Jun 6 08:16:36 2024, Danyal, Accelerator, scraper info by Robert Boywitt Scraper_im_Cooler.pdfT_Scraper_ECEDS1__.PNGT_Scraper_ECEDS2__.PNGT_Scraper_ESR.JPEG
attched is more info about the T-scrapers (E-cooler) by Robert Boywitt (Tel: 2067 or 3357)
Entry  Thu Jun 6 19:51:11 2024, Carsten, Accelerator, ESR crew left after persisting problems with ESR magnets 
No beam today.--.
ELOG V3.1.5-fc6679b