Entry  Sun Mar 2 18:55:30 2025, Jens, Reinhold, Danyal, DAQ, Main Scan range (4 blocks) shifted by -0.0012 nm --> one more scan 
We decided to scan the main range, shifted by -0.0012nm, one more time in order to have the non-shifted AND the shifted range both 3x  ! 

[TABLE border="1"]
Entry  Sun Mar 2 16:51:53 2025, Jens, Rodolfo, General, Spaetschicht 
Die Spaetschicht macht weiter, bzw. mit dem naeschten Scan (um 16:41 Uhr) angefangen. Siehe bitte Eintrag 75 (noch als Preview gezeigt). 
Entry  Sun Mar 2 08:18:25 2025, Tamina, Volker, Florian, Rodolfo, General, Frühschicht  
Die Frühschicht scan weiter. Siehe Eintrag 75 (noch als Draft)
Entry  Sun Mar 2 03:25:23 2025, Danyal, Detectors, Schottky Bild 02_03_2025 Schottky_02_03_2025.jpg
 
Entry  Sun Mar 2 03:24:42 2025, Danyal, Detectors, Schottky Bild 01_03_2025 Schottky_01_03_2025.jpg
 
Entry  Sun Mar 2 03:23:46 2025, Danyal, Detectors, Schottky Bild 27_02_2025 Schottky_27_02_2025.jpg
 
Entry  Sun Mar 2 03:07:43 2025, Denise, Benedikt, Danyal, DAQ, 0.0012 nm shifted scan: 257.1738 nm - 257.6754 nm 
[TABLE border="1"]
Zeit | Scanbereich (nm) | Anzahl Laserschritte | Start LMD | Stop LMD | Messdauer (s) | Elektronenkuehlung (s) | Kommentar
|-
Entry  Sat Mar 1 19:19:25 2025, Konstantin, DAQ, Offline Analysis Unbenanntes_Bild.pngg042.png
A copy of the current go4 analysis is placed at atplaser@lxgs1055:/kr_analysis. Use the usual Go4 startup routine to start an offline analysis of data.
They should be copied into the folder lxgs1055:/data.local2/E0075. To combine different 
lmd-files, simply create a file like "FirstScan.lml" containing the paths of the individual files. After this you can read the lml file with go4.
Entry  Sat Mar 1 18:32:05 2025, Jens, Runs, Laser während Scan 
18:30Uhr:
Timestamp im Programm hat gehangen. Kurz im Anzeigefeld markieren und es ging wieder.
Laser Step Counter hat gehangen und lag mit 4Go 20 Steps auseinander. Da es früh genug auffiel wurde der Number of Steps von 52 auf 72 erhöht. Ist also
Entry  Sat Mar 1 17:43:18 2025, Reinhold, Jens, Natalya, Danyal, Denise, Benedikt, DAQ, Scanbereich 257.175 nm - 257.675 nm 
[TABLE border="1"]
Zeit | Scanbereich (nm) | Anzahl Laserschritte | Start LMD | Stop LMD | Messdauer (s) | Elektronenkuehlung (s) | Kommentar
|-
Entry  Sat Mar 1 16:33:22 2025, Konstantin, DAQ, Restart of Go4  Screenshot_2025-03-01_16-34-01.pngScreenshot_2025-03-01_16-45-30.png
Restart of go4 before new scan:

1. Stop Acquisition (Stop button right next to the green play buttons)
Entry  Sat Mar 1 13:45:42 2025, Konstantin , DAQ, Gentec readout 
Gentec readout is now included in the general slow data acquisition. The issue was that the buffer of the power meter was not emptied fast enough. Now,
the data is read out permanently in a separate thread. 
Entry  Sat Mar 1 13:34:30 2025, Tamina, Florian, Konstantin, Volker, Detectors, Erhoehter Untergrund XUV-Detektor 
Erhoehter Hintergrund bei XUV-Detektor durch das weiße Papier, welches zur Beobachtung des Strahls über die Kamera verwendet wird. Kein weißes Papier dafür
verwenden. 
Weißes Papier wurde durch schwarzen Gummi ersetzt. Trotzdem immer noch erhoehter Untergrund, wenn auch nicht mehr ganz so hoch wie zuvor. Vermutlich noch
Entry  Sat Mar 1 11:40:17 2025, Tamina, Florian, Konstantin, Calibration, Laser position Screenshot_2025-03-01_11-39-32.png
The laser position stayed perfect after the scans. See picture.
Entry  Sat Mar 1 09:49:06 2025, Tamina, Florian, Konstantin, Volker, Calibration, Vorbereitung Messung Verschiebung Laserpulse zum Bunch 
Nach dem Zyklus liegen die PD-Pulse nicht mehr bei 55 bins (SW) und 85 bins (NW) wie vorher, sondern bei 56 (SW) und 87 (NW) 
- Pulse laufen Richtung Nord, also in die "schlechte" Richtung, wo man eventuell den XUV-Detektor verfehlt.
- Bunch bei ca. 70-75 
Entry  Sat Mar 1 07:14:48 2025, Night shift, Runs, Tabelle erster Scanbereich 257.175 nm - 257.300 nm 
[TABLE border="1"]
Zeit | Scanbereich (nm) | Anzahl Laserschritte | Start LMD | Stop LMD | Messdauer (s) | Elektronenkuehlung (s) | Gentec Files | Kommentar
|-
Entry  Sat Mar 1 07:10:32 2025, Sebastian, Denise, Benedikt, Runs, Erste Messung 
Autoscan der Wellenlänge 

Leistung im Laserlabor: 30mW (schwankend)
Entry  Sat Mar 1 07:05:11 2025, Sebastian, Denise, Benedikt, General, UV Wellenlängen scannen in Blöcken 
Das Scannen der Wellenlänge über den gesamten Bereich wird in 4 Blöcke aufgeteilt: 
1) 257.175-257.300nm
2) 257.300-257.425nm
Entry  Sat Mar 1 07:04:01 2025, Benedikt, General, Anleitung automatischer Wellenlängenscan 
Hier ist eine überarbeitete Übersicht über die Funktionsweise des Wellenlängenscans mit der GUI.

Vorbereitungen:
Entry  Sat Mar 1 07:01:41 2025, Denise, Benedikt, Sebastian, DAQ, UV Wellenlaenge in Python implementiert 
Die UV Wellenlaenge des WS7 wurde zusaetzlich zur WS7 Frequenz in Medusa hinzugefuegt um den korrekten Wellenlaengenscan des Pulssystems besser online zu
verfolgen.
Entry  Sat Mar 1 04:10:48 2025, Denise, Benedikt, Sebastian, DAQ, DAQ Terminals 
Es gibt nun 3 Terminals am LXG1049 die immer offen sein sollten!

Entry  Sat Mar 1 04:02:59 2025, Denise, Benedikt, Sebastian, DAQ, Lokale Datenaufnahme auf LXG1049 
Die Daten werden LOKAL auf dem LXG1049 unter folgendem Verzeichnis gespeichert:

[B]/data.local2/2025_krypton/[/B]
Entry  Sat Mar 1 03:58:17 2025, Denise, Benedikt, Sebastian, DAQ, DAQ Daten xchecks 
Die allgemeinen DAQ Daten wurden ausfuehrlich crossgechecked und kommen nun alle an wie sie auch in die DAQ reinlaufen sollen.

Allerdings mussten die zwei PH100 Gentec Messkoepfe aus der DAQ gestrichen werden, da die Daten extrem verzoegert in die Slow Control Aufnahme reinlaufen.
Entry  Sat Mar 1 03:45:07 2025, Denise, Benedikt, Sebastian, DAQ, PH100 Gentecs @ Medusa 
Die zwei PH100 Messkoepfe am Nordwest und Suedwest Tower werden delayed in Medusa angezeigt und die Daten werden nicht an Medusa geschickt.

Letzteres haengt wohl mit den benoetigten 10 digits zusammen die MBS erwartet. 
Entry  Fri Feb 28 20:44:04 2025, Konstantin, DAQ, Updated Channel list 
Final (hopefully) channel list:

[TABLE border="1"]
Entry  Fri Feb 28 19:33:03 2025, Volker, Detectors, Laser background 
We measured the laser background rate in the XUV detector.
The voltages applied were +300V at the MCP front, +2250V at the MCP anode.
Trigger threshold at ca. 40 mV.
Entry  Fri Feb 28 17:36:15 2025, Konstantin, DAQ, Trigger events from accelarator 2025-02-28_17-34-15-990_1.png
We will use GENESIS to create trigger events (injection, ...) for the DAQ
Entry  Fri Feb 28 17:18:34 2025, Tamina, General, Laserwellenlängen zur Orientierung 
Minimale Wellenlänge: IR 1028,7 nm --> 257,175 nm im UV (DFB Temperatur sollte ca. be 16,5 °C sein)

Maximale Wellenlänge: IR 1030,7 nm --> 257,675 nm UV (DFB TEmperatur sollte ca. bei 35,6 °C sein)
Entry  Fri Feb 28 16:46:51 2025, Tamina, Jens, Calibration, Synchronisation von Laserpulsen mit Bunchingfrequenz Delay_fuer_Bunch_zentral.jpgBunch_zentral.jpg
Die Syncronisation der Reprate des Lasers mit der Bunchingfrequenz wird mit einem Oszi zusammen aufgenommen/gemessen.
Trigger auf RF Bunching, dann gucken in welche Richtung der Laser abhaut. Bewegt sich der Puls relativ zum zur Bunch HF nach rechts, ist die Reprate am
AFG zu hoch, wenn er 
Entry  Fri Feb 28 15:53:44 2025, Konstantin, Accelerator, HF Signal for Bunching 
The HF Bunching Frequency is: 1.7838817 MHz

Given (read) by the ESR operators in HKR.
Entry  Fri Feb 28 15:30:41 2025, Tamina, Rodolfo, Detectors, Fast PD Nord West 
We had an issue with the PD NW. The signal after the Rate Divider was not OK.

The problem was that the signal after the Delay Generator GG8000, the width, was too short. We have now changed the width and made similar to the PD SW.
Entry  Fri Feb 28 13:53:06 2025, Tamina, Rodolfo, Runs, Ionenbunch Screenshot_Kr_Ionenbunch_2025-02-28_1350.pngScreenshot_Kr_Ionenbunch_2025-02-28_1445.png
Signal of PMT-Mitte. Recorded with an unstable ion bunch. With approx. 3E8 Ions

The second screenshot is showing a similar signal with 1.8E8 Ions
Entry  Fri Feb 28 08:57:30 2025, , General,  
28.2.25

Morning shift Aufgaben(nach Sebas:
Entry  Fri Feb 28 05:53:59 2025, Denise, Sebastian, Benedikt, Calibration, Laserstrahllage mit Scraper 
Laserstrahl mit Hilfe der Blenden eingestellt, dann mit Scrapern vermessen

Entry  Fri Feb 28 04:47:39 2025, Denise, Sebastian, Benedikt, Calibration, Gentec ESR Kalibration 
Unsicherheiten Gentecs im allgemeinen bei etwa 6.5%

Gentec NW (PH100 S:UV) OD.3 
Entry  Fri Feb 28 00:44:31 2025, Denise, Sebastian, DAQ, Shutter auf - Shutter zu Go4 Signale Screenshot_2025-02-28-Shutter_auf-Shutter_zu.png
Shutter auf (TDC Kanal 12 / Go4 Kanal TrS11_Shutter auf)
Shutter zu (TDC Kanal 13 / Go4 Kanal TrS12_Shutter zu)
Entry  Fri Feb 28 00:35:46 2025, Benedikt, General, Anleitung Wellenlängenscan 
Es folgt eine Anleitung, wie die Wellenlänge des Lasersystems mit der PulsedLaserGUI gesteuert werden kann.

Vorbereitungen:
Entry  Fri Feb 28 00:19:04 2025, Konstantin, Sebastian, Detectors, PMT power supply Screenshot_2025-02-28_00-33.png
We checked the PMT signal inside the cave by using the local HV power supply. If one needs to repeat the measurement at another time, be careful to use
the correct HV power supply, since the second one, which is mounted in the crate has the wrong polarity. Both PMT's must be supplied with a negative voltage.
Entry  Fri Feb 28 00:18:16 2025, Tamina, General, Kalibration UV Monitor im Laserlabor 
Der UV Monitor steht in der Reflexion des PBSC auf dem Lasertisch im Laserlabor. 

P_Transmission = (1-(0.9364 * cos^2(0.0349* (theta - 33.014)) + 0.06043)) *P_Reflex
Entry  Thu Feb 27 23:01:26 2025, Danyal, Konstantin, Sebastian , Calibration, Delaytime measurement 
Yesterday, we forgot to take the transit time of the PMT's into account when we set up the delay times of the detectors PMT middle, PMT north, PD SW, and
PD NW. 
Today we did the measurement again and took transit times into account. Additionally, we finalized the cabling for the XUV detector. 
Entry  Thu Feb 27 21:23:02 2025, Jens, DAQ, Python Data Channels 
Python variables and names in DAQ
Because the Name of variables in DAQ doesnt match the the real variables, here is List of the channels and what value is in this channel
Entry  Thu Feb 27 20:21:31 2025, Sebastian, General, 10 MHz Ref Clock (Butis) 
10 MHz Referenz Clock von BUTIS mit AFG als externl clock verbunden.
Wird benötigt das die Bunch Kavität (DDS System) in Phase mit AFG (Laserreprate) ist.
Entry  Thu Feb 27 16:30:57 2025, Konstantin und Rodolfo, DAQ, HF Signal 
We have exchanged the HF-Signal in the DAQ Electronic: from Dummy-HF to the real HF from accelerator. 
Entry  Thu Feb 27 11:19:55 2025, Danyal, Accelerator, pictures of the ion beam from 26.02.2025  Schottky_pick-up_Bild.jpgSchottky_resonator_Bild.jpggebunchter_Strahl_im_ESR.jpg
Hier sind noch ein paar Bilder vom Ionenstrahl , wie er gestern Abend war.
Entry  Thu Feb 27 10:52:32 2025, Rodolfo, Detectors, Taking PMTs into operation 20250227_105411.jpg20250227_143518.jpg
[B]PMT Nord[/B] the power supply (CH0) is giving an alarm already by an applied voltage of -1707 V (operation voltage is -2450 V). It is leaking to much
current, larger than the set value of 310 uA. See attached picture 20250227_105411.jpg .
Entry  Thu Feb 27 09:59:08 2025, Konstantin, Calibration, HV-Divider 
The readout of the HV divider runs on a RaspberryPi inside the HV-cave of the electron cooler.
Starting from 2025-02-27 09:42, the divider ratio was changed from 248517 to 248515. Usually, the
readout should run continuously. If not, the following procedure must be applied:
Entry  Thu Feb 27 09:38:04 2025, Konstantin & Danyal, Detectors, Laufzeit Messungen 
Gestern Abend haben wir die Signal Laufzeiten im gemessen:

PMT Mitte: 1213 ns (bis zur Messhütte ohne DAQ sind es 1025 ns) 
Entry  Wed Feb 26 18:53:52 2025, Danyal, Accelerator, ESR settings 
Date: 26.02.2025 @  18:35

E-cooler:  HV = 157366 +/- 1 V  (HV divider value)
Entry  Tue Feb 25 14:51:52 2025, Danyal, General, Experiment Acceptance 
Today, 25 FEB 2025 at 9:00 AM, our experiment was reviewed carefully by the safety committee. 
The experiment was accepted without problems. 
All was fine, only minor comments were made and only a few short-notice actions were required. 
Entry  Tue Feb 25 13:12:01 2025, Sebastian, DAQ, Teilungsverhältnis Ohmlabs HVS250 Bericht_PTB_verbesserter_Teiler_2018.pdfMaßstabsfaktoren.JPG
Hochspannung Maßstabsfaktoren

-140 kV >>> 248514
Entry  Thu Feb 20 13:51:04 2025, Denise, Sebatian, DAQ, DAQ Channelliste 
[TABLE border="1"]
TDC Channels |
|- 
Entry  Thu Feb 20 13:37:30 2025, Denise, Sebastian, DAQ, CFD Schwellen DAQ 
Schwellen fuer den CFD N842 (lascool)
Lasereinstellungen dabei waren: 0.5 Skalenteile -> 115ps Pulse
3.56654MHz Reprate
Entry  Thu Feb 20 00:45:00 2025, Danyal, General, Doppler width of M1 transition 
According to Paul Indelicato

transition 3P1 -> 3P0  in 78Kr32+ : 
Entry  Mon Feb 17 13:49:20 2025, Denise, General, Frequenzbreiten Ionensystem 
Berechnung der Frequenzbreiten des Lasers im Ionensystem 
Werte für die Frequezbreiten des Lasers aus Dissertation Benedikt Langfeld übernommen
Entry  Fri Feb 14 16:41:54 2025, Sebastian , General, Verkabelung PD ESR IMG_8368.jpeg
Verkabelung von den Photodioden im ESR. Sind auch gelabelt.

PD gehen zuerst einmal in den FAMP (10x Verstärkung) 
Entry  Fri Feb 14 16:24:22 2025, Denise, General, Strahlprofil UV im ESR  IMG_8360.jpeg796a74f2-ec76-4396-82e5-9d3209b36612.jpeg0bbd839a-f6cf-4fa4-a5a4-71d0c84044fa.mov
Erstes Bild ist das Strahlptofil in Höhe des Nord 
towers. 
Zweites Bild (mit Millimeterpapier) und Video zeigt 
Entry  Thu Feb 13 12:56:01 2025, Danyal, General, ESR access - monday (whole day) 8-18 hr 
 
Entry  Thu Feb 13 12:55:13 2025, Danyal, General, ESR access - tomorrow (Fri) 10:00 - 12:00 
 
Entry  Wed Feb 12 12:48:48 2025, Danyal, General, ESR access  
We had the chance to shortly enter the ESR, between 10:45 and 11:30. 

- We repositioned the PSDs of the TEM system. 
Entry  Tue Feb 11 13:08:32 2025, Danyal, Accelerator, limited access to ESR this week 
Hitrap will kein ESR Zugang erlauben bevor 22 Uhr. Außerdem merken die, wenn ESR-SIS nicht laufen, dass sie morgens immer 1 Stunde Zeit verlieren weil nicht
"angefordert" wurde. Deswegen wollen sie, dass ESR-SIS nachts auch weiter Strahl anfordern, etwa 1 mal pro 5 Minuten. Aber wir finden schon noch eine Lücke
um reinzugehen.
Entry  Tue Feb 11 10:35:38 2025, Danyal, Detectors, XUV detector 
Volker Hannen kommt am 19.2 (Mittags) und dann machen wir Abends den XUV Detektor bereid.

Entry  Tue Feb 11 10:32:01 2025, Danyal, General, access to ESR 
Es wird noch zwei 2 stündige Unterbrechungen am UNILAC geben. Wahrscheinlich diesen Freitag und nächste Woche Mittwoch oder Donnerstag. Am 25.2. wird dann
die Gleitringdichtung der Pumpe am UNILAC gewechselt (8-18 Uhr) daher rechne ich mit Xe Strahl im ESR frühestes am 26.2.
Von HITRAP habe ich erfahren, dass wir Abends/Nachts was im Ring machen dürfen, ab 22 Uhr. z.B. am 17.2, 19.2 und 21.2.  Aber ich denke vorher (diese Woche)
Entry  Tue Feb 11 10:30:21 2025, Danyal, General, laser valves are open 
Die Laserventile im ESR sind nun offen. Der Laserstrahl darf durchgeschossen werden.

The "laser valves" (NW and SW) are now open.  The laser beam may pass through the ESR. 
Entry  Thu Feb 6 12:54:29 2025, Danyal, Accelerator, HV-divider for electron cooler connected - readout is running HV_divider_readout.jpg
The HV-divider has been connected to the E-Cooler. 

The readout (by Konstantin) is running too. 
Entry  Thu Feb 6 11:03:26 2025, Danyal, General, pressures in laser window sections NW and SW 
The pressures, read by the UHV technician, are : 

E01VVLF1T (E01VMLF1X):           5.84e-10mbar
Entry  Wed Feb 5 14:05:53 2025, Rodolfo, Sebastian, Analysis, Schirm / Iris ESR Entrance Fenster 
Wegen defekt von Kippschirm wurde das alte System zum Verstellen der Iris und des Schirms für das ESR Eintrittsfensters genutzt.

Fleischmann Trafo:
Entry  Wed Feb 5 13:50:28 2025, Sebastian, Accelerator, TIF Modul - Injektions-/ Extraktionssignale 
TIF Moduleinstellung
Remark: Die EV H und EV L Einstellungen sind die Eventnummern in Hexadezimal Basis 16
Entry  Tue Feb 4 13:01:52 2025, Sebastian , Accelerator, Druck NW und SW Laserfenster IMG_8500.jpegIMG_8499.jpeg
 
Entry  Fri Jan 31 16:37:39 2025, Sebastian, DAQ, PD Nord IMG_8478.jpeg
PD Nord an ESR Panel PMT Süd verkabelt
Entry  Wed Jan 29 10:23:21 2025, Sebastian, General, Remote Control Schirm Nord West Tower 
Box zum rein und rausfahren hinter Laser PC im ESR

Zeiger von Rädchen muss auf "SCHIRM NW" stehen
Entry  Tue Jan 28 15:57:05 2025, Denise, General, Justage: ESR Labor Periskop Spiegel oben 
obere Schraube nach rechts drehen, dann bewegt sich Laserspot nach links 
selbe Schraube nach links dann Laser rechts
Entry  Tue Jan 28 14:16:22 2025, Sebastian, General, Shutter 
Thorlabs Shutter SH1/M kann über STRPC001 (ESR Laserlab PC) und der Software SC10 genutzt werden.

COM 9 für Connection
Entry  Tue Jan 28 14:13:54 2025, Benedikt & Sebastian TEAMWORK DIGGA, DAQ, RedPitaya Adresse 
SCPI Server:
http://169.254.204.79/
Entry  Mon Jan 27 16:57:07 2025, Sebastian, DAQ, COM Ports Gentec Messkopf NW und SW Tower @ ESR 
COM 5 Südwest Tower --> Laser EXIT
COM 6 Nordwest Tower --> Laser ENTRANCE
Entry  Mon Jan 27 16:55:46 2025, Sebastian, General, DLC Pro IP Adresse 
SISDEV007
140.181.91.46
Entry  Mon Jan 27 11:06:21 2025, Sebastian, General, Optiken ESR Lab, NW und SW eingebaut 
Die Optiken (Layertec 2" und 3") ab TEM Spiegel ESR Lab 
bis ESR TEM Spiegel eingebaut.
Entry  Mon Jan 27 10:59:22 2025, Sebastian, DAQ, RedPitaya  
[B]Hostname: ext-91000370132.gsi.de
IP-Adresse: 10.100.3.106
[/B]
Entry  Fri Jan 24 16:36:10 2025, Rodolfo, General, Cameras Kamera_NW_ATPDEV005_IRIS-IN.PNGKamera_SW_APDEV17_IRIS-OUT.PNG
I have installed two cameras, which can be used to monitor the position of the laser beam. In order to access them (only at GSI) via a browser just type
the "device's name" follow by "gsi.de"
Entry  Fri Jan 24 15:06:51 2025, Rodolfo, Detectors, Solar Blind PMTs Be-like-Kr_Detektoren_2025-01-24.jpgPMT9423_SN650_Datenblatt.pdf
We (Danyal and Rodolfo) have installed two "solar-blind" PMTs from "ET Enterprises" Model 9423B to the "mirror chamber" at ESR . See attached picture.

- PMT NORD. Serial Nummer: 650. For the operating voltage plear see the attached PDF file, PMT9423_SN650_Datenblatt.
Entry  Fri Dec 13 13:44:13 2024, Sebastian, Runs, test 
test 123
Entry  Fri Dec 13 13:39:05 2024, Danyal, General, Test 
Test