Sun Mar 2 18:55:30 2025, Jens, Reinhold, Danyal, DAQ, Main Scan range (4 blocks) shifted by -0.0012 nm --> one more scan
|
We decided to scan the main range, shifted by -0.0012nm, one more time in order to have the non-shifted AND the shifted range both 3x !
[TABLE border="1"]
|
Sun Mar 2 16:51:53 2025, Jens, Rodolfo, General, Spaetschicht
|
Die Spaetschicht macht weiter, bzw. mit dem naeschten Scan (um 16:41 Uhr) angefangen. Siehe bitte Eintrag 75 (noch als Preview gezeigt). |
Sun Mar 2 08:18:25 2025, Tamina, Volker, Florian, Rodolfo, General, Frühschicht
|
Die Frühschicht scan weiter. Siehe Eintrag 75 (noch als Draft) |
Sun Mar 2 03:25:23 2025, Danyal, Detectors, Schottky Bild 02_03_2025
|
|
Sun Mar 2 03:24:42 2025, Danyal, Detectors, Schottky Bild 01_03_2025
|
|
Sun Mar 2 03:23:46 2025, Danyal, Detectors, Schottky Bild 27_02_2025
|
|
Sun Mar 2 03:07:43 2025, Denise, Benedikt, Danyal, DAQ, 0.0012 nm shifted scan: 257.1738 nm - 257.6754 nm
|
[TABLE border="1"]
Zeit | Scanbereich (nm) | Anzahl Laserschritte | Start LMD | Stop LMD | Messdauer (s) | Elektronenkuehlung (s) | Kommentar
|-
|
Sat Mar 1 19:19:25 2025, Konstantin, DAQ, Offline Analysis 
|
A copy of the current go4 analysis is placed at atplaser@lxgs1055:/kr_analysis. Use the usual Go4 startup routine to start an offline analysis of data.
They should be copied into the folder lxgs1055:/data.local2/E0075. To combine different
lmd-files, simply create a file like "FirstScan.lml" containing the paths of the individual files. After this you can read the lml file with go4. |
Sat Mar 1 18:32:05 2025, Jens, Runs, Laser während Scan
|
18:30Uhr:
Timestamp im Programm hat gehangen. Kurz im Anzeigefeld markieren und es ging wieder.
Laser Step Counter hat gehangen und lag mit 4Go 20 Steps auseinander. Da es früh genug auffiel wurde der Number of Steps von 52 auf 72 erhöht. Ist also |
Sat Mar 1 17:43:18 2025, Reinhold, Jens, Natalya, Danyal, Denise, Benedikt, DAQ, Scanbereich 257.175 nm - 257.675 nm
|
[TABLE border="1"]
Zeit | Scanbereich (nm) | Anzahl Laserschritte | Start LMD | Stop LMD | Messdauer (s) | Elektronenkuehlung (s) | Kommentar
|-
|
Sat Mar 1 16:33:22 2025, Konstantin, DAQ, Restart of Go4 
|
Restart of go4 before new scan:
1. Stop Acquisition (Stop button right next to the green play buttons)
|
Sat Mar 1 13:45:42 2025, Konstantin , DAQ, Gentec readout
|
Gentec readout is now included in the general slow data acquisition. The issue was that the buffer of the power meter was not emptied fast enough. Now,
the data is read out permanently in a separate thread. |
Sat Mar 1 13:34:30 2025, Tamina, Florian, Konstantin, Volker, Detectors, Erhoehter Untergrund XUV-Detektor
|
Erhoehter Hintergrund bei XUV-Detektor durch das weiße Papier, welches zur Beobachtung des Strahls über die Kamera verwendet wird. Kein weißes Papier dafür
verwenden.
Weißes Papier wurde durch schwarzen Gummi ersetzt. Trotzdem immer noch erhoehter Untergrund, wenn auch nicht mehr ganz so hoch wie zuvor. Vermutlich noch |
Sat Mar 1 11:40:17 2025, Tamina, Florian, Konstantin, Calibration, Laser position
|
The laser position stayed perfect after the scans. See picture. |
Sat Mar 1 09:49:06 2025, Tamina, Florian, Konstantin, Volker, Calibration, Vorbereitung Messung Verschiebung Laserpulse zum Bunch
|
Nach dem Zyklus liegen die PD-Pulse nicht mehr bei 55 bins (SW) und 85 bins (NW) wie vorher, sondern bei 56 (SW) und 87 (NW)
- Pulse laufen Richtung Nord, also in die "schlechte" Richtung, wo man eventuell den XUV-Detektor verfehlt.
- Bunch bei ca. 70-75
|
Sat Mar 1 07:14:48 2025, Night shift, Runs, Tabelle erster Scanbereich 257.175 nm - 257.300 nm
|
[TABLE border="1"]
Zeit | Scanbereich (nm) | Anzahl Laserschritte | Start LMD | Stop LMD | Messdauer (s) | Elektronenkuehlung (s) | Gentec Files | Kommentar
|-
|
Sat Mar 1 07:10:32 2025, Sebastian, Denise, Benedikt, Runs, Erste Messung
|
Autoscan der Wellenlänge
Leistung im Laserlabor: 30mW (schwankend)
|
Sat Mar 1 07:05:11 2025, Sebastian, Denise, Benedikt, General, UV Wellenlängen scannen in Blöcken
|
Das Scannen der Wellenlänge über den gesamten Bereich wird in 4 Blöcke aufgeteilt:
1) 257.175-257.300nm
2) 257.300-257.425nm
|
Sat Mar 1 07:04:01 2025, Benedikt, General, Anleitung automatischer Wellenlängenscan
|
Hier ist eine überarbeitete Übersicht über die Funktionsweise des Wellenlängenscans mit der GUI.
Vorbereitungen:
|
Sat Mar 1 07:01:41 2025, Denise, Benedikt, Sebastian, DAQ, UV Wellenlaenge in Python implementiert
|
Die UV Wellenlaenge des WS7 wurde zusaetzlich zur WS7 Frequenz in Medusa hinzugefuegt um den korrekten Wellenlaengenscan des Pulssystems besser online zu
verfolgen.
|
Sat Mar 1 04:10:48 2025, Denise, Benedikt, Sebastian, DAQ, DAQ Terminals
|
Es gibt nun 3 Terminals am LXG1049 die immer offen sein sollten!
|
Sat Mar 1 04:02:59 2025, Denise, Benedikt, Sebastian, DAQ, Lokale Datenaufnahme auf LXG1049
|
Die Daten werden LOKAL auf dem LXG1049 unter folgendem Verzeichnis gespeichert:
[B]/data.local2/2025_krypton/[/B]
|
Sat Mar 1 03:58:17 2025, Denise, Benedikt, Sebastian, DAQ, DAQ Daten xchecks
|
Die allgemeinen DAQ Daten wurden ausfuehrlich crossgechecked und kommen nun alle an wie sie auch in die DAQ reinlaufen sollen.
Allerdings mussten die zwei PH100 Gentec Messkoepfe aus der DAQ gestrichen werden, da die Daten extrem verzoegert in die Slow Control Aufnahme reinlaufen. |
Sat Mar 1 03:45:07 2025, Denise, Benedikt, Sebastian, DAQ, PH100 Gentecs @ Medusa
|
Die zwei PH100 Messkoepfe am Nordwest und Suedwest Tower werden delayed in Medusa angezeigt und die Daten werden nicht an Medusa geschickt.
Letzteres haengt wohl mit den benoetigten 10 digits zusammen die MBS erwartet.
|
Fri Feb 28 20:44:04 2025, Konstantin, DAQ, Updated Channel list
|
Final (hopefully) channel list:
[TABLE border="1"]
|
Fri Feb 28 19:33:03 2025, Volker, Detectors, Laser background
|
We measured the laser background rate in the XUV detector.
The voltages applied were +300V at the MCP front, +2250V at the MCP anode.
Trigger threshold at ca. 40 mV.
|
Fri Feb 28 17:36:15 2025, Konstantin, DAQ, Trigger events from accelarator
|
We will use GENESIS to create trigger events (injection, ...) for the DAQ |
Fri Feb 28 17:18:34 2025, Tamina, General, Laserwellenlängen zur Orientierung
|
Minimale Wellenlänge: IR 1028,7 nm --> 257,175 nm im UV (DFB Temperatur sollte ca. be 16,5 °C sein)
Maximale Wellenlänge: IR 1030,7 nm --> 257,675 nm UV (DFB TEmperatur sollte ca. bei 35,6 °C sein)
|
Fri Feb 28 16:46:51 2025, Tamina, Jens, Calibration, Synchronisation von Laserpulsen mit Bunchingfrequenz 
|
Die Syncronisation der Reprate des Lasers mit der Bunchingfrequenz wird mit einem Oszi zusammen aufgenommen/gemessen.
Trigger auf RF Bunching, dann gucken in welche Richtung der Laser abhaut. Bewegt sich der Puls relativ zum zur Bunch HF nach rechts, ist die Reprate am
AFG zu hoch, wenn er
|
Fri Feb 28 15:53:44 2025, Konstantin, Accelerator, HF Signal for Bunching
|
The HF Bunching Frequency is: 1.7838817 MHz
Given (read) by the ESR operators in HKR. |
Fri Feb 28 15:30:41 2025, Tamina, Rodolfo, Detectors, Fast PD Nord West
|
We had an issue with the PD NW. The signal after the Rate Divider was not OK.
The problem was that the signal after the Delay Generator GG8000, the width, was too short. We have now changed the width and made similar to the PD SW. |
Fri Feb 28 13:53:06 2025, Tamina, Rodolfo, Runs, Ionenbunch 
|
Signal of PMT-Mitte. Recorded with an unstable ion bunch. With approx. 3E8 Ions
The second screenshot is showing a similar signal with 1.8E8 Ions |
Fri Feb 28 08:57:30 2025, , General,
|
28.2.25
Morning shift Aufgaben(nach Sebas:
|
Fri Feb 28 05:53:59 2025, Denise, Sebastian, Benedikt, Calibration, Laserstrahllage mit Scraper
|
Laserstrahl mit Hilfe der Blenden eingestellt, dann mit Scrapern vermessen
|
Fri Feb 28 04:47:39 2025, Denise, Sebastian, Benedikt, Calibration, Gentec ESR Kalibration
|
Unsicherheiten Gentecs im allgemeinen bei etwa 6.5%
Gentec NW (PH100 S:UV) OD.3
|
Fri Feb 28 00:44:31 2025, Denise, Sebastian, DAQ, Shutter auf - Shutter zu Go4 Signale
|
Shutter auf (TDC Kanal 12 / Go4 Kanal TrS11_Shutter auf)
Shutter zu (TDC Kanal 13 / Go4 Kanal TrS12_Shutter zu)
|
Fri Feb 28 00:35:46 2025, Benedikt, General, Anleitung Wellenlängenscan
|
Es folgt eine Anleitung, wie die Wellenlänge des Lasersystems mit der PulsedLaserGUI gesteuert werden kann.
Vorbereitungen:
|
Fri Feb 28 00:19:04 2025, Konstantin, Sebastian, Detectors, PMT power supply
|
We checked the PMT signal inside the cave by using the local HV power supply. If one needs to repeat the measurement at another time, be careful to use
the correct HV power supply, since the second one, which is mounted in the crate has the wrong polarity. Both PMT's must be supplied with a negative voltage.
|
Fri Feb 28 00:18:16 2025, Tamina, General, Kalibration UV Monitor im Laserlabor
|
Der UV Monitor steht in der Reflexion des PBSC auf dem Lasertisch im Laserlabor.
P_Transmission = (1-(0.9364 * cos^2(0.0349* (theta - 33.014)) + 0.06043)) *P_Reflex
|
Thu Feb 27 23:01:26 2025, Danyal, Konstantin, Sebastian , Calibration, Delaytime measurement
|
Yesterday, we forgot to take the transit time of the PMT's into account when we set up the delay times of the detectors PMT middle, PMT north, PD SW, and
PD NW.
Today we did the measurement again and took transit times into account. Additionally, we finalized the cabling for the XUV detector.
|
Thu Feb 27 21:23:02 2025, Jens, DAQ, Python Data Channels
|
Python variables and names in DAQ
Because the Name of variables in DAQ doesnt match the the real variables, here is List of the channels and what value is in this channel
|
Thu Feb 27 20:21:31 2025, Sebastian, General, 10 MHz Ref Clock (Butis)
|
10 MHz Referenz Clock von BUTIS mit AFG als externl clock verbunden.
Wird benötigt das die Bunch Kavität (DDS System) in Phase mit AFG (Laserreprate) ist. |
Thu Feb 27 16:30:57 2025, Konstantin und Rodolfo, DAQ, HF Signal
|
We have exchanged the HF-Signal in the DAQ Electronic: from Dummy-HF to the real HF from accelerator. |
Thu Feb 27 11:19:55 2025, Danyal, Accelerator, pictures of the ion beam from 26.02.2025  
|
Hier sind noch ein paar Bilder vom Ionenstrahl , wie er gestern Abend war. |
Thu Feb 27 10:52:32 2025, Rodolfo, Detectors, Taking PMTs into operation 
|
[B]PMT Nord[/B] the power supply (CH0) is giving an alarm already by an applied voltage of -1707 V (operation voltage is -2450 V). It is leaking to much
current, larger than the set value of 310 uA. See attached picture 20250227_105411.jpg .
|
Thu Feb 27 09:59:08 2025, Konstantin, Calibration, HV-Divider
|
The readout of the HV divider runs on a RaspberryPi inside the HV-cave of the electron cooler.
Starting from 2025-02-27 09:42, the divider ratio was changed from 248517 to 248515. Usually, the
readout should run continuously. If not, the following procedure must be applied:
|
Thu Feb 27 09:38:04 2025, Konstantin & Danyal, Detectors, Laufzeit Messungen
|
Gestern Abend haben wir die Signal Laufzeiten im gemessen:
PMT Mitte: 1213 ns (bis zur Messhütte ohne DAQ sind es 1025 ns)
|
Wed Feb 26 18:53:52 2025, Danyal, Accelerator, ESR settings
|
Date: 26.02.2025 @ 18:35
E-cooler: HV = 157366 +/- 1 V (HV divider value)
|
Tue Feb 25 14:51:52 2025, Danyal, General, Experiment Acceptance
|
Today, 25 FEB 2025 at 9:00 AM, our experiment was reviewed carefully by the safety committee.
The experiment was accepted without problems.
All was fine, only minor comments were made and only a few short-notice actions were required.
|
Tue Feb 25 13:12:01 2025, Sebastian, DAQ, Teilungsverhältnis Ohmlabs HVS250 
|
Hochspannung Maßstabsfaktoren
-140 kV >>> 248514
|
Thu Feb 20 13:51:04 2025, Denise, Sebatian, DAQ, DAQ Channelliste
|
[TABLE border="1"]
TDC Channels |
|-
|
Thu Feb 20 13:37:30 2025, Denise, Sebastian, DAQ, CFD Schwellen DAQ
|
Schwellen fuer den CFD N842 (lascool)
Lasereinstellungen dabei waren: 0.5 Skalenteile -> 115ps Pulse
3.56654MHz Reprate
|
Thu Feb 20 00:45:00 2025, Danyal, General, Doppler width of M1 transition
|
According to Paul Indelicato
transition 3P1 -> 3P0 in 78Kr32+ :
|
Mon Feb 17 13:49:20 2025, Denise, General, Frequenzbreiten Ionensystem
|
Berechnung der Frequenzbreiten des Lasers im Ionensystem
Werte für die Frequezbreiten des Lasers aus Dissertation Benedikt Langfeld übernommen
|
Fri Feb 14 16:41:54 2025, Sebastian , General, Verkabelung PD ESR
|
Verkabelung von den Photodioden im ESR. Sind auch gelabelt.
PD gehen zuerst einmal in den FAMP (10x Verstärkung)
|
Fri Feb 14 16:24:22 2025, Denise, General, Strahlprofil UV im ESR  
|
Erstes Bild ist das Strahlptofil in Höhe des Nord
towers.
Zweites Bild (mit Millimeterpapier) und Video zeigt
|
Thu Feb 13 12:56:01 2025, Danyal, General, ESR access - monday (whole day) 8-18 hr
|
|
Thu Feb 13 12:55:13 2025, Danyal, General, ESR access - tomorrow (Fri) 10:00 - 12:00
|
|
Wed Feb 12 12:48:48 2025, Danyal, General, ESR access
|
We had the chance to shortly enter the ESR, between 10:45 and 11:30.
- We repositioned the PSDs of the TEM system.
|
Tue Feb 11 13:08:32 2025, Danyal, Accelerator, limited access to ESR this week
|
Hitrap will kein ESR Zugang erlauben bevor 22 Uhr. Außerdem merken die, wenn ESR-SIS nicht laufen, dass sie morgens immer 1 Stunde Zeit verlieren weil nicht
"angefordert" wurde. Deswegen wollen sie, dass ESR-SIS nachts auch weiter Strahl anfordern, etwa 1 mal pro 5 Minuten. Aber wir finden schon noch eine Lücke
um reinzugehen.
|
Tue Feb 11 10:35:38 2025, Danyal, Detectors, XUV detector
|
Volker Hannen kommt am 19.2 (Mittags) und dann machen wir Abends den XUV Detektor bereid.
|
Tue Feb 11 10:32:01 2025, Danyal, General, access to ESR
|
Es wird noch zwei 2 stündige Unterbrechungen am UNILAC geben. Wahrscheinlich diesen Freitag und nächste Woche Mittwoch oder Donnerstag. Am 25.2. wird dann
die Gleitringdichtung der Pumpe am UNILAC gewechselt (8-18 Uhr) daher rechne ich mit Xe Strahl im ESR frühestes am 26.2.
Von HITRAP habe ich erfahren, dass wir Abends/Nachts was im Ring machen dürfen, ab 22 Uhr. z.B. am 17.2, 19.2 und 21.2. Aber ich denke vorher (diese Woche) |
Tue Feb 11 10:30:21 2025, Danyal, General, laser valves are open
|
Die Laserventile im ESR sind nun offen. Der Laserstrahl darf durchgeschossen werden.
The "laser valves" (NW and SW) are now open. The laser beam may pass through the ESR. |
Thu Feb 6 12:54:29 2025, Danyal, Accelerator, HV-divider for electron cooler connected - readout is running
|
The HV-divider has been connected to the E-Cooler.
The readout (by Konstantin) is running too.
|
Thu Feb 6 11:03:26 2025, Danyal, General, pressures in laser window sections NW and SW
|
The pressures, read by the UHV technician, are :
E01VVLF1T (E01VMLF1X): 5.84e-10mbar
|
Wed Feb 5 14:05:53 2025, Rodolfo, Sebastian, Analysis, Schirm / Iris ESR Entrance Fenster
|
Wegen defekt von Kippschirm wurde das alte System zum Verstellen der Iris und des Schirms für das ESR Eintrittsfensters genutzt.
Fleischmann Trafo:
|
Wed Feb 5 13:50:28 2025, Sebastian, Accelerator, TIF Modul - Injektions-/ Extraktionssignale
|
TIF Moduleinstellung
Remark: Die EV H und EV L Einstellungen sind die Eventnummern in Hexadezimal Basis 16
|
Tue Feb 4 13:01:52 2025, Sebastian , Accelerator, Druck NW und SW Laserfenster 
|
|
Fri Jan 31 16:37:39 2025, Sebastian, DAQ, PD Nord
|
PD Nord an ESR Panel PMT Süd verkabelt |
Wed Jan 29 10:23:21 2025, Sebastian, General, Remote Control Schirm Nord West Tower
|
Box zum rein und rausfahren hinter Laser PC im ESR
Zeiger von Rädchen muss auf "SCHIRM NW" stehen
|
Tue Jan 28 15:57:05 2025, Denise, General, Justage: ESR Labor Periskop Spiegel oben
|
obere Schraube nach rechts drehen, dann bewegt sich Laserspot nach links
selbe Schraube nach links dann Laser rechts
|
Tue Jan 28 14:16:22 2025, Sebastian, General, Shutter
|
Thorlabs Shutter SH1/M kann über STRPC001 (ESR Laserlab PC) und der Software SC10 genutzt werden.
COM 9 für Connection
|
Tue Jan 28 14:13:54 2025, Benedikt & Sebastian TEAMWORK DIGGA, DAQ, RedPitaya Adresse
|
SCPI Server:
http://169.254.204.79/
|
Mon Jan 27 16:57:07 2025, Sebastian, DAQ, COM Ports Gentec Messkopf NW und SW Tower @ ESR
|
COM 5 Südwest Tower --> Laser EXIT
COM 6 Nordwest Tower --> Laser ENTRANCE
|
Mon Jan 27 16:55:46 2025, Sebastian, General, DLC Pro IP Adresse
|
SISDEV007
140.181.91.46 |
Mon Jan 27 11:06:21 2025, Sebastian, General, Optiken ESR Lab, NW und SW eingebaut
|
Die Optiken (Layertec 2" und 3") ab TEM Spiegel ESR Lab
bis ESR TEM Spiegel eingebaut.
|
Mon Jan 27 10:59:22 2025, Sebastian, DAQ, RedPitaya
|
[B]Hostname: ext-91000370132.gsi.de
IP-Adresse: 10.100.3.106
[/B]
|
Fri Jan 24 16:36:10 2025, Rodolfo, General, Cameras 
|
I have installed two cameras, which can be used to monitor the position of the laser beam. In order to access them (only at GSI) via a browser just type
the "device's name" follow by "gsi.de"
|
Fri Jan 24 15:06:51 2025, Rodolfo, Detectors, Solar Blind PMTs 
|
We (Danyal and Rodolfo) have installed two "solar-blind" PMTs from "ET Enterprises" Model 9423B to the "mirror chamber" at ESR . See attached picture.
- PMT NORD. Serial Nummer: 650. For the operating voltage plear see the attached PDF file, PMT9423_SN650_Datenblatt. |
Fri Dec 13 13:44:13 2024, Sebastian, Runs, test
|
test 123 |
Fri Dec 13 13:39:05 2024, Danyal, General, Test
|
Test |