ID |
Date |
Author |
Category |
Subject |
Year |
Text |
|
25
|
Wed Oct 23 14:51:43 2019 |
Jan, Laszlo | DAQ | VME modules & main.cfg | | Here is the current list of VME modules in
our DRASI daq including HW addresses:
|
|
28
|
Wed Nov 6 14:13:53 2019 |
Jan, Laszlo | Detectors | DSSSD - 1st movement - realignment | | We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion |
|
30
|
Thu Dec 5 10:57:57 2019 |
Jan, Laszlo | Detectors | setting up the DSSD with beam | | This is a brief how-to about getting the DSSSD
set up with stored beam and target in the
ESR.
|
|
83
|
Fri Mar 20 13:21:33 2020 |
Jan, Laszlo | Analysis | 124Xe data of first night | | The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
|
|
357
|
Thu May 20 17:31:50 2021 |
Jan, Laszlo, Beatriz | General | beam & target alignement | 2021 | beam and target alignement was checked by
looking at the Xray rates. Best case when:
Target bump (position) SC 9: -18.5mm
|
|
420
|
Mon May 24 15:24:52 2021 |
Jan, Laszlo, Piere-Michel, Enis | Runs | Run 0096 | 2021 | No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 |
|
421
|
Mon May 24 16:06:39 2021 |
Jan, Laszlo, Piere-Michel, Enis | Runs | Run 0097 | 2021 | Changed trafo offset during this file !!
No. of stacks: 10 (before 5)
|
|
567
|
Sun May 30 14:40:55 2021 |
Jan, Sophia | Detectors | real detector assignment | 2021 | ************************************
GEM1800 @ 90deg (xray1)
GLP2000 @ 35deg (xray2)
|
|
568
|
Sun May 30 14:48:09 2021 |
Jan, Sophia | Calibration | run0215 - crap | 2021 | |
|
569
|
Mon May 31 10:08:42 2021 |
Jan, Sophia | Runs | E127b runsheet | 2021 | |
|
573
|
Wed Jun 23 12:29:35 2021 |
Jan, Sophia | Calibration | Efficiency of the x-ray Detectors | 2021 | For the x-ray detectors, efficiencies have
been measured, before and after the experiment
was performed.
|
|
577
|
Wed Jul 14 14:46:05 2021 |
Jan, Sophia | Detectors | collimator geometry | 2021 | We have measured the collimator geometry.
The annotations of the variables can be found
in the attached sketch
|
10x |
292
|
Wed Apr 28 09:12:47 2021 |
Jan, Yuri | Detectors | UI-diagram | 2021 | The UI-curve of the detector
U I
10 0.11
|
|
14
|
Tue Jun 25 21:19:50 2019 |
Laszlo | Simulations | MOCADI input parameters | | initial BEAM input parameters for MOCADI are
based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in |
|
18
|
Tue Jul 23 10:46:29 2019 |
Laszlo | Analysis | 124Xe pg peak fit using mixed cascade simulation | | This entry is the continuation of the cascade
effects on the pg peak shape entry:
|
7x |
Draft
|
Fri Aug 9 13:14:09 2019 |
Laszlo | | pn channel simulations for 111Sn(p,g)112Sb experiment | | The p,n channel opening for the 111Sn+p reaction
is at 5.8895 MeV/u beam energy. Therefore,
when choosing as 6MeV/u, 7MeV/u, 8MeV/u beam |
|
20
|
Fri Aug 9 13:43:15 2019 |
Laszlo | Simulations | pn channel simulations for 111Sn(p,g)112Sb experiment | | The p,n channel opening for 111Sn beam is
at 5.8895 MeV/u beam energy. Therefore, when
choosing 6MeV/u, 7MeV/u,
|
12x |
22
|
Wed Sep 25 13:03:46 2019 |
Laszlo | Analysis | simulations on 118Te+p | | I have made some simulations at 8AMeV, 7AMeV
and 4AMeV energies for the main 118Te + p
reaction channels. For the
|
11x |
23
|
Wed Sep 25 13:58:24 2019 |
Laszlo | General | Gamow window energies for 118Te(p,g) | | # Z A Iso Re Rc T9 upper width mxpos
shift
52 118 te118 pg 20 0.5 1.39 0.58 1.06 |
|
29
|
Fri Nov 15 10:46:12 2019 |
Laszlo | Detectors | Detector movement from HKR | | To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
|
|