  567   Sun May 30 14:40:55 2021 Jan, SophiaDetectorsreal detector assignment2021************************************
GEM1800 @ 90deg (xray1) 
GLP2000 @ 35deg (xray2)
  
  568   Sun May 30 14:48:09 2021 Jan, SophiaCalibrationrun0215 - crap2021    
  569   Mon May 31 10:08:42 2021 Jan, SophiaRunsE127b runsheet2021   e127b_runsheet.ods 
  573   Wed Jun 23 12:29:35 2021 Jan, SophiaCalibrationEfficiency of the x-ray Detectors 2021For the x-ray detectors, efficiencies have
been measured, before and after the experiment
was performed. 
 Effizienz_x_ray_GEM1800_90.pngEffizienz_x_ray_GEM3000_145.pngEffizienz_x_ray_GLP_35_ohne33keV.png 
  577   Wed Jul 14 14:46:05 2021 Jan, SophiaDetectorscollimator geometry2021We have measured the collimator geometry.
The annotations of the variables can be found
in the attached sketch  
 10x 
  420   Mon May 24 15:24:52 2021 Jan, Laszlo, Piere-Michel, EnisRunsRun 00962021No. of stacks: 10 (before 5)
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10
  
  421   Mon May 24 16:06:39 2021 Jan, Laszlo, Piere-Michel, EnisRunsRun 00972021Changed trafo offset during this file !!

No. of stacks: 10 (before 5)
  
  357   Thu May 20 17:31:50 2021 Jan, Laszlo, BeatrizGeneralbeam & target alignement2021beam and target alignement was checked by
looking at the Xray rates. Best case when:
Target bump (position) SC 9: -18.5mm
  
  25   Wed Oct 23 14:51:43 2019 Jan, LaszloDAQVME modules & main.cfg Here is the current list of VME modules in
our DRASI daq including HW addresses:
 main.cfg 
  28   Wed Nov 6 14:13:53 2019 Jan, LaszloDetectorsDSSSD - 1st movement - realignment We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion
  
  30   Thu Dec 5 10:57:57 2019 Jan, LaszloDetectorssetting up the DSSD with beam This is a brief how-to about getting the DSSSD
set up with stored beam and target in the
ESR.
  
  83   Fri Mar 20 13:21:33 2020 Jan, LaszloAnalysis124Xe data of first night The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
 90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png 
  498   Thu May 27 14:33:05 2021 Jan, Beatriz, AlexRunsRun 0154 - crap run2021No. of stacks: 10 
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  1   Thu Sep 13 11:42:33 2018 Jan GloriusCollaborationProposal Attached is the beam time proposal submitted
and accepted by the G-PAC in 2017.    
 E127_Reifarth_pg.pdfE127_Approval.pdf 
  293   Thu Apr 29 20:32:52 2021 Jan GloriusCalibrationcalibration sources2021We use the following list of sources for calibration
of the Xray detectors:
  
  294   Thu Apr 29 20:34:09 2021 Jan GloriusCalibrationrun0003 - Xray90 calib Pb210 d=167.5mm2021Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
  
  295   Fri Apr 30 09:27:27 2021 Jan GloriusCalibrationrun0004 - Xray90 calib Pb210 d=167.5mm 2021Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
  
  296   Fri Apr 30 09:57:57 2021 Jan GloriusCalibrationrun0005 - Xray90 calib Pb210 d=167.5mm 2021Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
  
  297   Fri Apr 30 10:55:34 2021 Jan GloriusDAQXray multi-triggers - blocking gate2021From the CFD of Xray1 (90deg) we get multiple
trigger signals every ~5sec for unknown reasons.
  
  298   Fri Apr 30 11:04:31 2021 Jan GloriusCalibrationrun0006 - Xray90 calib Pb210 d=167.5mm 2021Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
  