HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy, Page 1 of 6  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  1   Fri Jul 30 10:21:27 2021 RodolfoLaserKinkThe laser beamline in the ESR north arc has
a [B]knik[/B], therefore the laser beam can
not get the "laser tower" in the north east
 Laser_beamline_ESR_NordBogen.jpg 
  2   Fri Apr 22 09:38:24 2022 RodolfoLasergetting ready for Fluorescein548We are going to change dye. Therefore I have
take out the DCM-dye-solution* out of the
dye circulators, rinsed them with Ethanol
  
  3   Mon Apr 25 18:47:12 2022 RodolfoLaserNew dye circulatorsI have put into operation the new circulators
(SN. 182231, 182201) for our dye laser (the
Cobra). I have rinsed them with pure Ethanol
 Neue_Cobra-Farbstoffpumpe.jpg 
  4   Mon Apr 25 21:47:28 2022 RodolfoLasergreen instead UVI am exchanging the optical elements (mirrors
and lenses) for the laser spectroscopy on
bismuth. At some places I am also exchanging
 Libelle_Umtausch_GrüneOptik.jpgUmtausch_Spiegel_2statt3.jpg 
  5   Tue Apr 26 16:28:14 2022 CarstenDAQCable of Bunch HF disconnected and 1.995Mhz signal connected for DAQ tests see subject.   
  6   Tue Apr 26 18:15:19 2022 RodolfoDetectorsXUV-Detector and Cu-MirrorConcerning the moveable detectors: 

- I have switched off the power supply and
  
  7   Fri Apr 29 21:18:12 2022 Rodolfo & MaxLaserFluorescein 27, Rh 610 + Rh 640We (Max and Rodolfo) have tested the dyes.
I have prepared the dye-solutions according
to the recipes given in Sirah's User Manual.
  
  8   Wed May 4 22:45:12 2022 Carsten, SebastianDAQQ-Switch Signal (ch15) fixed The "dead" Q-Switch signal was converted 
two times... This explains why in the 
Thorium experiment the Q-Switch signal 
  
  9   Wed May 4 22:55:37 2022 Rodolfo, SebastianLaserFCU / Temp Control BugWe found a "Bug" in the control of the Sirah
dye system.
  
  10   Wed May 4 22:56:22 2022 Rodolfo, Sebastian, KonstantinLaserLaser step complete, scan complete fixed"Laser step complete" and "laser scan complete"
are working again.
  
  11   Thu May 5 15:24:34 2022 SebastianLaserlaser busy problemCurrent status: 
Laser busy signal works correctly (5V if
the grating moves, 0V if not) if the laser
  
  12   Fri May 6 10:30:23 2022 SebastianDAQlaser busy / dye out signal fixedSolution for a working laser busy / dye out
signal was to disable the FCU and set the
FCU status to "False" (see attached picture).
 CobraFix_LaserBusy.PNG 
  13   Fri May 6 10:35:06 2022 SebastianDAQlaser step complete cabling changedI changed the laser step complete cabling
from a quad coinc (see attached picture)
to a Logic Fan In / Fan out (same as laser
 stepComplete_beforeChange_QuadCoincCabling.PNG 
  14   Fri May 6 16:29:03 2022 Simon, PatrickDetectorsPMT preparationWe changed PMT north and PMT south and tested
them at 1500 V.
  
  15   Fri May 6 16:41:57 2022 Patrick, RodolfoLaserWavemeterWe coupled the laser through a multi-mode
fiber into the wavemeter.
With the main amplifier enabled, we got enough
 Screenshot_(4).pngBi2022_laserscan_test.PNG 
  16   Mon May 9 09:43:08 2022 ZoranAcceleratorESR BeamThe main control room started setting up the
Bi beam this morning, but quickly stopped
in order to solve some problems around the
  
  17   Mon May 9 11:45:57 2022 Wilfried, Jon, SebastianGeneralHV Divider position & DMM calibrationWe performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
 DMM_calibration.PNGdividerPosition.PNGdividerPosition1.PNG 
  18   Mon May 9 13:48:20 2022 RodolfoLaserLaser for H-like 209BiI have changed the dye to Rhodamin 610 + Rhodamin
640. The Cobra wavelength can be tuned now
from 600 to 630 nm.
  
  19   Mon May 9 16:58:41 2022 CarstenDetectorsVoltage particle dectectors NA_SZ und SA_SZ switched onVoltage SA_SZ (capture behind cooler): 1500
V (thin plastic scintillator)
Voltage NA_SZ (capture behind target): 750V
  
  20   Mon May 9 17:01:02 2022 CarstenDAQdirectories / paths / comments / reduction factors /startup.scom files for the 2 DAQs [U][B]DAQ1 (original):[/B][/U]
-user atplaser
-runs on lxg1050
  
ELOG V3.1.5-fc6679b