1
|
Fri Jul 30 10:21:27 2021 |
Rodolfo | Laser | Kink | The laser beamline in the ESR north arc has
a [B]knik[/B], therefore the laser beam can
not get the "laser tower" in the north east |
|
2
|
Fri Apr 22 09:38:24 2022 |
Rodolfo | Laser | getting ready for Fluorescein548 | We are going to change dye. Therefore I have
take out the DCM-dye-solution* out of the
dye circulators, rinsed them with Ethanol |
|
3
|
Mon Apr 25 18:47:12 2022 |
Rodolfo | Laser | New dye circulators | I have put into operation the new circulators
(SN. 182231, 182201) for our dye laser (the
Cobra). I have rinsed them with pure Ethanol |
|
4
|
Mon Apr 25 21:47:28 2022 |
Rodolfo | Laser | green instead UV | I am exchanging the optical elements (mirrors
and lenses) for the laser spectroscopy on
bismuth. At some places I am also exchanging |
|
5
|
Tue Apr 26 16:28:14 2022 |
Carsten | DAQ | Cable of Bunch HF disconnected and 1.995Mhz signal connected for DAQ tests | see subject. |
|
6
|
Tue Apr 26 18:15:19 2022 |
Rodolfo | Detectors | XUV-Detector and Cu-Mirror | Concerning the moveable detectors:
- I have switched off the power supply and |
|
7
|
Fri Apr 29 21:18:12 2022 |
Rodolfo & Max | Laser | Fluorescein 27, Rh 610 + Rh 640 | We (Max and Rodolfo) have tested the dyes.
I have prepared the dye-solutions according
to the recipes given in Sirah's User Manual. |
|
8
|
Wed May 4 22:45:12 2022 |
Carsten, Sebastian | DAQ | Q-Switch Signal (ch15) fixed | The "dead" Q-Switch signal was converted
two times... This explains why in the
Thorium experiment the Q-Switch signal
|
|
9
|
Wed May 4 22:55:37 2022 |
Rodolfo, Sebastian | Laser | FCU / Temp Control Bug | We found a "Bug" in the control of the Sirah
dye system.
|
|
10
|
Wed May 4 22:56:22 2022 |
Rodolfo, Sebastian, Konstantin | Laser | Laser step complete, scan complete fixed | "Laser step complete" and "laser scan complete"
are working again.
|
|
11
|
Thu May 5 15:24:34 2022 |
Sebastian | Laser | laser busy problem | Current status:
Laser busy signal works correctly (5V if
the grating moves, 0V if not) if the laser |
|
12
|
Fri May 6 10:30:23 2022 |
Sebastian | DAQ | laser busy / dye out signal fixed | Solution for a working laser busy / dye out
signal was to disable the FCU and set the
FCU status to "False" (see attached picture).
|
|
13
|
Fri May 6 10:35:06 2022 |
Sebastian | DAQ | laser step complete cabling changed | I changed the laser step complete cabling
from a quad coinc (see attached picture)
to a Logic Fan In / Fan out (same as laser |
|
14
|
Fri May 6 16:29:03 2022 |
Simon, Patrick | Detectors | PMT preparation | We changed PMT north and PMT south and tested
them at 1500 V.
|
|
15
|
Fri May 6 16:41:57 2022 |
Patrick, Rodolfo | Laser | Wavemeter | We coupled the laser through a multi-mode
fiber into the wavemeter.
With the main amplifier enabled, we got enough |
|
16
|
Mon May 9 09:43:08 2022 |
Zoran | Accelerator | ESR Beam | The main control room started setting up the
Bi beam this morning, but quickly stopped
in order to solve some problems around the |
|
17
|
Mon May 9 11:45:57 2022 |
Wilfried, Jon, Sebastian | General | HV Divider position & DMM calibration | We performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
|
|
18
|
Mon May 9 13:48:20 2022 |
Rodolfo | Laser | Laser for H-like 209Bi | I have changed the dye to Rhodamin 610 + Rhodamin
640. The Cobra wavelength can be tuned now
from 600 to 630 nm.
|
|
19
|
Mon May 9 16:58:41 2022 |
Carsten | Detectors | Voltage particle dectectors NA_SZ und SA_SZ switched on | Voltage SA_SZ (capture behind cooler): 1500
V (thin plastic scintillator)
Voltage NA_SZ (capture behind target): 750V |
|
20
|
Mon May 9 17:01:02 2022 |
Carsten | DAQ | directories / paths / comments / reduction factors /startup.scom files for the 2 DAQs | [U][B]DAQ1 (original):[/B][/U]
-user atplaser
-runs on lxg1050
|
|
21
|
Mon May 9 17:14:02 2022 |
Carsten | DAQ | NTCAP DAQ | The NTCap DAQ computer in the HKR (Schottky
logbook) is started, and all preparations
for data taking (mounting of NAS etc.) are |
|
22
|
Mon May 9 17:16:34 2022 |
Carsten | Accelerator | Important: New ESR pattern - requies action for XUV detector in/out | The ESR pattern is enhanced compared to the
thorium experiment by additional machines
that can be used for cooling/waiting in |
|
23
|
Mon May 9 19:05:17 2022 |
Wilfried | DAQ | Q-Switch signals + 0.5 ms and +1 ms in VUPROM | We have generated two additional signals which
are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
|
|
24
|
Mon May 9 19:56:41 2022 |
Zoran | Accelerator | status Monday evening | The main control room is setting up the SIS
for extraction. At the moment there are 2.5E8
particles in the SIS. Later they will check |
|
25
|
Tue May 10 09:05:19 2022 |
Zoran | Accelerator | status Monday evening | > The main control room is setting up the
SIS for extraction. At the moment there are
2.5E8 particles in the SIS. Later they will |
|
26
|
Tue May 10 11:40:55 2022 |
Sebastian | Accelerator | still no beam @ESR | There is still no Beam in the ESR.
The beam is currently at TE3 - between SIS |
|
27
|
Tue May 10 11:59:45 2022 |
Simon, Christopher, Kristian, Sebastian | Laser | Labview VI checkups | The lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 |
|
28
|
Tue May 10 15:26:35 2022 |
Rodolfo, Max | Laser | Laser stabilisation running | It is now possible to stabilize and move the
laser with both stages.
|
|
29
|
Tue May 10 20:35:42 2022 |
Phillip, Wilfried, Max | Detectors | PMT Threshold | Since we have ions in the ring now, we looked
at the PMT thresholds and the widths. In
order to do so we looked at the Raw Signal |
|
30
|
Tue May 10 21:41:17 2022 |
Rodolfo | Accelerator | T-Scraper | The T-Scrapers at the electron cooler have
an issue. They can't be moved in the horizontal
direction using the DeviceControl. |
|
31
|
Tue May 10 22:29:45 2022 |
Jan Glorius | DAQ | DAQ2 shaper settings | Attached are the MSCF shaper settings applied
on Tue May 10 at 22:30. |
|
32
|
Tue May 10 22:37:10 2022 |
Jan Glorius | DAQ | DAQ2 cabling docu | |
|
33
|
Tue May 10 23:10:25 2022 |
Sebastian, Patrick, Volker, Guy | Accelerator | T-Scraper Reloaded | We have established a Control to "manually"
move the T-Scrapers via a "remote desktop".
We can now move both scrapers in the horizontal |
|
34
|
Tue May 10 23:53:42 2022 |
Rodolfo | General | shift change | The night shift took over. They are trying
now to overlap the ion and laser beams. |
|
35
|
Wed May 11 01:09:07 2022 |
Patrick, Sebastian, Volker, Guy | Laser | Beam overlap | We overlapped the laser with the ion beam.
The ion beam positions are:
|
|
36
|
Wed May 11 03:10:55 2022 |
Patrick, Sebastian, Volker, Guy | Laser | Laser - bunch timing | We added the delay and gate generator in between
the bunch trigger and the CFD to move the
timing of the PMT middle signal relative |
|
37
|
Wed May 11 03:17:14 2022 |
Patrick, Volker, Guy | Runs | Start laser scanning | Runs of the night shift. The wavelength range
is 601.95 - 601.735 nm.
We started the wavemeter python script on |
|
39
|
Wed May 11 06:41:32 2022 |
Simon, Christopher, Shahab | Runs | shifts | new shift started. |
|
40
|
Wed May 11 06:47:58 2022 |
Simon, Christopher, Shahab | Runs | restart laser scan |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
41
|
Wed May 11 07:28:39 2022 |
Simon, Christopher, Shahab | General | DAQ Loop for shifters | Procedure:
- Scanning phase ends (on LabView wait until |
|
42
|
Wed May 11 08:01:44 2022 |
Zoran | Runs | Start laser scanning | [quote]
[I]Questions:[/I]
[B]There are many other masses/isotopes/etc. |
|
43
|
Wed May 11 14:48:31 2022 |
Konstantin | DAQ | Voltage range of the Keysight DMM changed from 10V to 1V | During the setup of the ion beam the voltage
range of the Keysight DMM was changed from
10V to 1V. Additionally, the name of the |
|
44
|
Wed May 11 14:59:01 2022 |
Rodolfo | Laser | Laser status | I have measured the output energy of the laser
system. All values in [mJ] and over 500 laser-pulses
average
|
|
45
|
Wed May 11 18:00:40 2022 |
Wilfried, Phillip, Max | Detectors | double PD NO peak problem solved | In entry 36 one finds an additional PD NO
peak around bin 100.
This was caused by signal reflection in the |
|
46
|
Wed May 11 18:13:04 2022 |
Wilfried, Phillip, Max | DAQ | laser scan/step complete | The scaler channel laser scan complete and
laser step complete is interchanged in go4.
Carsten will fix this on the software side.
|
|
47
|
Wed May 11 20:47:54 2022 |
Zoran | Accelerator | beam lost in SIS | For some reason the beam was lost in the SIS
soon after taking the ESR beam this evening,
reason unknown. Solved by sending teh full |
|
48
|
Wed May 11 22:04:30 2022 |
Phillip, Wilfried, Max | General | spacial laser - ion overlap verified | After the SIS/ESR optimization we checked
the spatial overlap with the T-scrapers again.
|
|
49
|
Wed May 11 22:19:17 2022 |
Max, Wilfried, Volker | Laser | laser bunch timing | We overlapped the laser and ion bunch in the
time domain. The delay has to be set on the
module above the laser and NOT in the ESR |
|
50
|
Wed May 11 22:45:22 2022 |
Max, Wilfried, Patrick | General | scanning wavelength | The scan parameters for the next shift are:
in COBRACONTROL:
|
|
51
|
Wed May 11 23:34:39 2022 |
Patrick, Carsten | Detectors | Particle Detectors / Scraper positions | Voltages of particle detectors off.
Scraper positions:
|
|
52
|
Wed May 11 23:36:24 2022 |
Ruijiu Chen, Carsten, Guy | DAQ | start NTCAP. | Carrier frequency:244MHz
IQ rate: 10M Samples/seconds
Reference level: -25
|
|
53
|
Thu May 12 00:16:13 2022 |
Patrick, Volker, Guy, Rui-Jiu | Runs | Runs night shift |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
54
|
Thu May 12 03:25:37 2022 |
Patrick | DAQ | Laser scan complete signal off | As in ID:46, the 'laser scan complete' again
is not coming in.
It is not very useful to repeatedly fix cable |
|
55
|
Thu May 12 10:10:35 2022 |
Simon, Christopher, Wilfried, Sebastian | DAQ | 1ms gated PMT north / middle added to DAQ | We added on DAQ1 and DAQ2 1ms gated PMT North
and PMT Middle signals.
Now we "supress" the signal by a factor of |
|
56
|
Thu May 12 10:21:30 2022 |
Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried | General | No Beam | There is no beam in the ESR due to some problem
in the UNILAC. |
|
57
|
Thu May 12 11:30:18 2022 |
Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried | General | Beam is back | Beam is back in the ESR. |
|
58
|
Thu May 12 11:31:11 2022 |
Simon, Christopher, Shahab, Wilfried, Sebastian, Ragan | General | Runs morning shift |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
59
|
Thu May 12 12:02:56 2022 |
Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried | General | No beam | There is no beam in the ESR again. |
|
60
|
Thu May 12 12:51:30 2022 |
Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried | General | Beam is back | 12:50 Beam is back again in the ring.
12:52-until now Kicker problem in the ESR. |
|
61
|
Thu May 12 14:04:09 2022 |
Konstantin | DAQ | Go4 Laserstep histograms adapted | In order to correctly display the gated PMT
signals [I]PMT Middle[/I] and [I]PMT North[/I]
some modifications in the Go4 code were necessary. |
|
62
|
Thu May 12 15:21:23 2022 |
Sebastian, Simon | Laser | Flash lamps changed | We (Sebastian and I) changed the flash lamps
of the Quanta Ray Laser and measured the
output energy of the laser system afterwards |
|
63
|
Thu May 12 15:34:47 2022 |
Max, Kristian, Sebastian | DAQ | laser scan, laser step and laser busy checked | We checked all three signals in the Messhütte.
Laser scan and laser step are OK.
The Laser busy signal is for large increments |
|
64
|
Thu May 12 15:50:33 2022 |
Max | Accelerator | No ESR beam | Since 13:30 we have no beam in the ESR. There
is a problem with the ESR septum.
The magnets department is investigating. |
|
65
|
Thu May 12 16:35:17 2022 |
Max, Wilfried, Zoran | Accelerator | NO BEAM UNTIL TOMORROW MORNING | The problem at the ESR septum is serious.
They have to remove the broken part and try
to repair it.
|
|
66
|
Fri May 13 08:32:41 2022 |
Zoran | Accelerator | NO BEAM UNTIL TOMORROW MORNING | > The problem at the ESR septum is serious.
They have to remove the broken part and try
to repair it.
|
|
67
|
Fri May 13 11:46:51 2022 |
Sebastian, Simon | | Laser energy | We (Sebastian and I) measured the output
energy of the laser system again.
All values in [mJ] and over 500 laser-pulses |
|
68
|
Fri May 13 16:55:58 2022 |
Danyal, Carsten, Phillip, Wilfried | General | End of E128 Beamtime | Dear all,
unfortunately, the E128 experiment must now |
|
69
|
Mon May 16 14:20:05 2022 |
Ragan, Danyal, Carsten, Phillip, Wilfried et al. | General | E128 Beamtime | > Dear all,
>
> unfortunately, the E128 experiment must |
|
70
|
Mon May 16 15:57:37 2022 |
Rodolfo | Laser | Wavemeter calibration | I have calibrated our Wavemeter WS7 using
the temperature stabilized He-Ne Laser (SIOS
EN60 825-1:2014). In the screenshots below |
|
71
|
Mon May 16 17:15:56 2022 |
Carsten | Analysis | DAQ /Analysis - shift of peaks in the accumulated spectra, changes in code | After a phone call with Wilfried I implemented
an offset to all hit channels of the stacked
/ accumulated spectra where one chekcs the |
|
72
|
Mon May 16 17:38:38 2022 |
Max, Danyal, Wilfried, Rodolfo | General | laser bunch timing | We overlapped the laser and ion bunch in the
time domain.
Therefore we delayed the bunching HF in order |
|
73
|
Mon May 16 18:01:23 2022 |
mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu | Runs | runs afternoon/night shift 16.05 | These are the runs after the septum was repaired
on 16.05.
|
|
74
|
Mon May 16 19:20:55 2022 |
Max, Wilfried | Analysis | start go4 before laser scan | It is necessary to start go4 before you start
the laser scan. Otherwise you get an offset
in the laser Step plots. |
|
75
|
Mon May 16 21:08:48 2022 |
Rodolfo & Max | Laser | Laser power | We checked the energy of the laser and optimized
it a bit
|
|
76
|
Mon May 16 22:19:54 2022 |
Patrick | DAQ | Keep go4 running (in theory), MBS | To accumulate more data into the opened go4,
do not restart MBS, but just
|
|
77
|
Mon May 16 22:57:40 2022 |
Patrick, Kristian, David, Ruijiu | Detectors | Switched off nitrogen | Background counts with nitrogen and air.
Less multiphoton events with air (see pictures,
histogram extended to 30 with nitrogen).
|
|
78
|
Tue May 17 00:44:01 2022 |
Patrick, Kristian | DAQ | Changed PMT North CFD channel | In run 8134 - 8135 PMT North showed a super
high background rate. After the scan we checked
the signal cables.
|
|
79
|
Tue May 17 06:37:28 2022 |
YL, KM | Accelerator | Reduced beam intensity | The resonance in 209Bi has been seen during
the night.
Reducing the intensity by a factor~1000, |
|
80
|
Tue May 17 10:38:44 2022 |
Konstantin | Detectors | PMT North changed | PMT located at the northern window was again
replaced by the narrow-band PMT (ET Enterprise
type 9423 SB, SN: 650). |
|
81
|
Fri May 27 10:39:53 2022 |
Kristian | DAQ | PMT North noise | During the last run, PMT North showed some
weird noise.
|
|
82
|
Fri May 27 14:57:23 2022 |
Rodolfo | Laser | Laser Energy | I have started up the laser system (Q-Ray
& Cobra) again. Here some parameters*:
|
|
83
|
Fri May 27 20:39:50 2022 |
Carsten | Analysis | Short Manual for updated Go4 DAQ (version 2022_05_27) | Short descriptions of the most recent version
of the GO4 code is attached. I will install
the corresponding vesion early on sunday. |
|
84
|
Mon May 30 00:56:33 2022 |
Max, Patrick | Laser | Beam overlap | The ion beam positions are (+- 1mm):
|
|
85
|
Mon May 30 01:13:40 2022 |
Konstantin, Max, Patrick | Detectors | XUV-Detector voltage off | XUV-Detector shows up to 100 kHz and, therefore,
was turned off. |
|
86
|
Mon May 30 02:12:20 2022 |
Max, Patrick, ~Konstantin, Ragan, Ken | Runs | runs night shift 30.05. | These are the first runs of the substitute
beamtime.
|
|
87
|
Mon May 30 02:33:45 2022 |
Patrick, MBS Max | DAQ | MBS procedure | It is possible to keep go4 running now. Summary
of the procedure:
|
|
88
|
Mon May 30 08:35:41 2022 |
Kristian, Simon, Ken, Ragan | Detectors | Changed PMT North | We did not see any signal at PMT North which
was the narrowband PMT. Changed it to the
old solar blind PMT. Now we see the resonance. |
|
89
|
Mon May 30 09:28:43 2022 |
Ken, Kristian, Simon, Ragan | Detectors | XUV-Detector | 9:27 XUV-Detector is running again.
-5V cathode, 8A main coil, 2.4A sec.coil
|
|
90
|
Mon May 30 16:17:39 2022 |
Kristian, David, Wilfried, Carsten, Danyal, Rodolfo | Runs | Afternoon shift 30.05 | These are the first runs after changing to
the thick stripper foil.
|
|
91
|
Mon May 30 19:00:19 2022 |
Carsten | General | Scraper Settings and Parameters for the last measrements with thick target | old Bunch frequency: 1.98777 MHz
Positions PL devices:
|
|
92
|
Mon May 30 19:42:20 2022 |
Rodolfo & Kristian | Laser | Changing laser wavelength | We have changed the laser wavelength, e.g.
the dye for the Cobra to Fluorescein 27.
|
|
93
|
Mon May 30 20:58:26 2022 |
Carsten | Accelerator | New Settings for 208Bi Beam | Old SetParameters.C and old SetConditions.C
were saved as SetParameters_209.C and SetConditions_209.C
|
|
94
|
Mon May 30 21:52:08 2022 |
Wilfried, Danyal, David, Rodolfo | General | Position of T-Scrapers | We have determined the position of the H-like
208Bi ion beam using the T-Scrapers. The
position actually did not change in comparison |
|
96
|
Mon May 30 23:18:06 2022 |
Carsten, Rodolfo, Konstantin, Patrick, Ragan, Ken, Kristian, Max, Danyal | Runs | Runs shifts 31.05. | These are the first runs with 208Bi.
[TABLE border="1"]
|
|
97
|
Tue May 31 03:18:52 2022 |
Patrick, Konstantin | Laser | Laser timing | The final timings are (in bins +-1):
PD NO: 103
|
|
98
|
Tue May 31 15:19:58 2022 |
Max, Carsten, Danyal | General | scans for different E-cool currents |
until 15:15 we have measured with I_e = 100
mA (3 loops per file)
|
|
99
|
Tue May 31 17:22:09 2022 |
Max, Carsten, Danyal, Rodolfo, Wilfried | General | change E-cooler current I_e = 50 mA |
At 17:15 we changed again the E-cooler current
I_e = 50 mA
|
|
100
|
Tue May 31 19:32:56 2022 |
Carsten, Wilfried, Max | Calibration | electron cooler calibration voltage - frequency | [TABLE border="1"]
SetVoltage (DeltaU) | MeasVoltage | freq
| Current
|
|
101
|
Tue May 31 19:37:30 2022 |
Carsten, Max, Wilfried | Detectors | SASZ and NASZ voltages switched off | SASZ and NASZ voltages were switched off bevor
we went back to 209Bi. Laser beam stabilization
turned off. |
|
102
|
Tue May 31 19:59:49 2022 |
Carsten, Danyal | Accelerator | change in frequency mismatch 208Bi --> 209Bi | time = 20:00
The RF has been adjusted so that it bunches |
|
103
|
Tue May 31 21:08:04 2022 |
Carsten, Max | Detectors | XUV detector automation off | We deactivated the automation of the XUV detector.
It stays out now. |
|
104
|
Tue May 31 21:58:55 2022 |
Max, Rodolfo | Laser | MRC Settings for 209Bi | We have change the laser settings for the
spectroscopy of 209Bi.
|
|
105
|
Wed Jun 1 00:03:08 2022 |
Konstantin, Simon, Kristian | Runs | 209-Bi runs | [TABLE border="1"]
Time | SIS-intensity | ESR-intensity after
orbit change| cooler-HV | cooler current |
|
106
|
Wed Jun 1 00:16:02 2022 |
Konstantin, Simon | DAQ | Timing 209Bi thick target | Timing for the final measurements on 209Bi
was determined for the new frequency 1.93777MHz.
Peak positions are
|
|
107
|
Wed Jun 1 08:39:50 2022 |
Kristian, Konstantin | Calibration | Wavemeter reading | We recorded files with high wavemeter readout
rate and saved it at the atplaser network
drive (Q:) - Bismuth - wavemeter folder.
|
|
108
|
Wed Jun 1 17:20:04 2022 |
Rodolfo | Laser | HeNe @ WS7 | |
|
109
|
Fri Jun 3 12:01:17 2022 |
Danyal | Detectors | switched off XUV detector on 1 June ~17:00 | I have switched off the XUV detector on 1
June at about 17:00.
The high voltages of the MCP (in ESR laser |
|
110
|
Thu Jun 30 11:12:21 2022 |
Carsten | Analysis | Updated Go4 Analysis with small Bugfix (PMTOverWavelength SPectra) | Here attached is a more recentversion of the
Go4 Analysis Code with some smaller bugfixes.
For adaequate *.C files please have alook |
|
111
|
Fri Jan 13 17:05:22 2023 |
Rodolfo | Laser | Testing WS6 | Testing the new Wavemeter (HighFinesse, WS6,
SN3950) with the QRAY laser light @ 532 nm.
Multimode fiber von High Finesse:FC/PC S |
|
112
|
Wed Jan 18 13:02:12 2023 |
Rodolfo | Laser | Testing WS6 with Cobra | Testing the WS6 (S.N. 3950) together with
the Cobra.
|
|
113
|
Tue Jun 6 09:33:00 2023 |
Rodolfo | Laser | Fiber coupler | Cobra's new fiber-coupling unit for wavelength
reading. |
|