21
|
Mon May 9 17:14:02 2022 |
Carsten | DAQ | NTCAP DAQ | The NTCap DAQ computer in the HKR (Schottky
logbook) is started, and all preparations
for data taking (mounting of NAS etc.) are |
|
22
|
Mon May 9 17:16:34 2022 |
Carsten | Accelerator | Important: New ESR pattern - requies action for XUV detector in/out | The ESR pattern is enhanced compared to the
thorium experiment by additional machines
that can be used for cooling/waiting in |
|
23
|
Mon May 9 19:05:17 2022 |
Wilfried | DAQ | Q-Switch signals + 0.5 ms and +1 ms in VUPROM | We have generated two additional signals which
are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
|
|
24
|
Mon May 9 19:56:41 2022 |
Zoran | Accelerator | status Monday evening | The main control room is setting up the SIS
for extraction. At the moment there are 2.5E8
particles in the SIS. Later they will check |
|
25
|
Tue May 10 09:05:19 2022 |
Zoran | Accelerator | status Monday evening | > The main control room is setting up the
SIS for extraction. At the moment there are
2.5E8 particles in the SIS. Later they will |
|
26
|
Tue May 10 11:40:55 2022 |
Sebastian | Accelerator | still no beam @ESR | There is still no Beam in the ESR.
The beam is currently at TE3 - between SIS |
|
27
|
Tue May 10 11:59:45 2022 |
Simon, Christopher, Kristian, Sebastian | Laser | Labview VI checkups | The lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 |
|
28
|
Tue May 10 15:26:35 2022 |
Rodolfo, Max | Laser | Laser stabilisation running | It is now possible to stabilize and move the
laser with both stages.
|
|
29
|
Tue May 10 20:35:42 2022 |
Phillip, Wilfried, Max | Detectors | PMT Threshold | Since we have ions in the ring now, we looked
at the PMT thresholds and the widths. In
order to do so we looked at the Raw Signal |
|
30
|
Tue May 10 21:41:17 2022 |
Rodolfo | Accelerator | T-Scraper | The T-Scrapers at the electron cooler have
an issue. They can't be moved in the horizontal
direction using the DeviceControl. |
|
31
|
Tue May 10 22:29:45 2022 |
Jan Glorius | DAQ | DAQ2 shaper settings | Attached are the MSCF shaper settings applied
on Tue May 10 at 22:30. |
|
32
|
Tue May 10 22:37:10 2022 |
Jan Glorius | DAQ | DAQ2 cabling docu | |
|
33
|
Tue May 10 23:10:25 2022 |
Sebastian, Patrick, Volker, Guy | Accelerator | T-Scraper Reloaded | We have established a Control to "manually"
move the T-Scrapers via a "remote desktop".
We can now move both scrapers in the horizontal |
|
34
|
Tue May 10 23:53:42 2022 |
Rodolfo | General | shift change | The night shift took over. They are trying
now to overlap the ion and laser beams. |
|
35
|
Wed May 11 01:09:07 2022 |
Patrick, Sebastian, Volker, Guy | Laser | Beam overlap | We overlapped the laser with the ion beam.
The ion beam positions are:
|
|
36
|
Wed May 11 03:10:55 2022 |
Patrick, Sebastian, Volker, Guy | Laser | Laser - bunch timing | We added the delay and gate generator in between
the bunch trigger and the CFD to move the
timing of the PMT middle signal relative |
|
37
|
Wed May 11 03:17:14 2022 |
Patrick, Volker, Guy | Runs | Start laser scanning | Runs of the night shift. The wavelength range
is 601.95 - 601.735 nm.
We started the wavemeter python script on |
|
39
|
Wed May 11 06:41:32 2022 |
Simon, Christopher, Shahab | Runs | shifts | new shift started. |
|
40
|
Wed May 11 06:47:58 2022 |
Simon, Christopher, Shahab | Runs | restart laser scan |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
41
|
Wed May 11 07:28:39 2022 |
Simon, Christopher, Shahab | General | DAQ Loop for shifters | Procedure:
- Scanning phase ends (on LabView wait until |
|