  62   Thu May 12 15:21:23 2022 Sebastian, SimonLaserFlash lamps changedWe (Sebastian and I) changed the flash lamps
of the Quanta Ray Laser and measured the
output energy of the laser system afterwards
  
  63   Thu May 12 15:34:47 2022 Max, Kristian, SebastianDAQlaser scan, laser step and laser busy checkedWe checked all three signals in the Messhütte.
Laser scan and laser step are OK.
The Laser busy signal is for large increments
  
  64   Thu May 12 15:50:33 2022 MaxAcceleratorNo ESR beamSince 13:30 we have no beam in the ESR. There
is a problem with the ESR septum.
The magnets department is investigating.
  
  65   Thu May 12 16:35:17 2022 Max, Wilfried, ZoranAcceleratorNO BEAM UNTIL TOMORROW MORNINGThe problem at the ESR septum is serious.
They have to remove the broken part and try
to repair it.
  
  66   Fri May 13 08:32:41 2022 ZoranAcceleratorNO BEAM UNTIL TOMORROW MORNING> The problem at the ESR septum is serious.
They have to remove the broken part and try
to repair it.
  
  67   Fri May 13 11:46:51 2022 Sebastian, Simon Laser energyWe (Sebastian and I)  measured the output
energy of the laser system again. 
All values in [mJ] and over 500 laser-pulses
  
  68   Fri May 13 16:55:58 2022 Danyal, Carsten, Phillip, WilfriedGeneralEnd of E128 Beamtime Dear all,

unfortunately, the E128 experiment must now
  
  69   Mon May 16 14:20:05 2022 Ragan, Danyal, Carsten, Phillip, Wilfried et al.GeneralE128 Beamtime > Dear all,

> unfortunately, the E128 experiment must
  
  70   Mon May 16 15:57:37 2022 RodolfoLaserWavemeter calibrationI have calibrated our Wavemeter WS7 using
the temperature stabilized He-Ne Laser (SIOS
EN60 825-1:2014). In the screenshots below
 WS7_VorKalibrationMitHe-Ne_16-05-2022.PNGWS7_NachKalibrationMitHe-Ne_16-05-2022.PNG 
  71   Mon May 16 17:15:56 2022 CarstenAnalysisDAQ /Analysis - shift of peaks in the accumulated spectra, changes in codeAfter a phone call with Wilfried I implemented
an offset to all hit channels of the stacked
/ accumulated spectra where one chekcs the
  
  72   Mon May 16 17:38:38 2022 Max, Danyal, Wilfried, RodolfoGenerallaser bunch timingWe overlapped the laser and ion bunch in the
time domain. 
Therefore we delayed the bunching HF in order
 timing1605.png 
  73   Mon May 16 18:01:23 2022 mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu Runsruns afternoon/night shift 16.05These are the runs after the septum was repaired
on 16.05.
  
  74   Mon May 16 19:20:55 2022 Max, WilfriedAnalysisstart go4 before laser scanIt is necessary to start go4 before you start
the laser scan. Otherwise you get an offset
in the laser Step plots.
  
  75   Mon May 16 21:08:48 2022 Rodolfo & MaxLaserLaser powerWe checked the energy of the laser and optimized
it a bit
  
  76   Mon May 16 22:19:54 2022 PatrickDAQKeep go4 running (in theory), MBSTo accumulate more data into the opened go4,
do not restart MBS, but just
  
  77   Mon May 16 22:57:40 2022 Patrick, Kristian, David, Ruijiu DetectorsSwitched off nitrogenBackground counts with nitrogen and air.
Less multiphoton events with air (see pictures,
histogram extended to 30 with nitrogen).
 2022-05-16_PMTs_after_nitrogen_off.png 
  78   Tue May 17 00:44:01 2022 Patrick, KristianDAQChanged PMT North CFD channelIn run 8134 - 8135 PMT North showed a super
high background rate. After the scan we checked
the signal cables.
  
  79   Tue May 17 06:37:28 2022 YL, KMAcceleratorReduced beam intensityThe resonance in 209Bi has been seen during
the night.
Reducing the intensity by a factor~1000,
  
  80   Tue May 17 10:38:44 2022 KonstantinDetectorsPMT North changedPMT located at the northern window was again
replaced by the narrow-band PMT (ET Enterprise
type 9423 SB, SN: 650).
  
  81   Fri May 27 10:39:53 2022 KristianDAQPMT North noiseDuring the last run, PMT North showed some
weird noise.
 IMG_20220527_095501.jpg 