  22   Thu Jun 6 08:16:36 2024 DanyalAcceleratorscraper info by Robert Boywittattched is more info about the T-scrapers
(E-cooler) by Robert Boywitt (Tel: 2067 or
3357)
 Scraper_im_Cooler.pdfT_Scraper_ECEDS1__.PNGT_Scraper_ECEDS2__.PNGT_Scraper_ESR.JPEG 
  7   Fri May 31 15:53:06 2024 Ruijiu ChenDAQrun NTCAP systemNTCAP is working again. 
Connect the RF cable and the scaler cables
to NTCAP system.
  
  Draft   Thu Jun 6 07:54:15 2024 DanyalGeneralpressure gauges and ion pumps yesterday (05.06.2024), firstly, the two ion
pumps (underneath the fluorescence chamber)
were switched off by the vacuum group (Björn
  
  32   Fri Jun 7 17:10:45 2024 SebastianGeneralXUV LEDMaximum XUV LED Voltage: 6.5V   
  8   Fri May 31 16:49:52 2024 CarstenDAQWiring DAQ 1Started to Check the wiring.

Status as of  2024-05-31
  
  43   Tue Jun 11 21:38:35 2024 Julian, Imke, RodolfoLaserWavemeter HeNe long time stabilityThe HeNe was running over night and the measured
laser frequency of the wavemeter was logged,
see picture.
 HeNe_LangeMessung_11-06-2024.JPG 
  29   Fri Jun 7 09:15:31 2024 CarstenDAQUpdated Channel List   ChannelList.pdfChannelList.odt 
  39   Mon Jun 10 09:17:38 2024 CarstenDAQUpdated Channel List   2024_06_10_ChannelList.pdfChannelList.odt 
  30   Fri Jun 7 11:14:04 2024 RodolfoLaserTrigger-signal for MRCWe are using a 2-Channel Function Generator
(from Textronik) to generate the trigger
signal for the MRC Beam Stabilization. 
 MRC_TriggerSignal_T1_06-06-2024.jpgMRC_TriggerSignal_T2_Tmin_06-06-2024.jpgGeneratorSettings_for_MRC_06-06-2024.jpgMRC_Parameters_06-06-2024_18-30.JPG 
  51   Wed Jun 12 17:12:13 2024 Julian, Danyal, RodolfoLaserTiming für 229Th89+We did the timing Ion-Beam Laser-beam time
overlap. 
 Timing_229Th89_12-06-2024.JPG 
  24   Thu Jun 6 09:23:53 2024 Konstantin MohrDAQTimingThe best way to adjust the bunch-laser timing
is to start go4 (mbs must be running) from
atppc023. Therefore use x2goclient and use
 TimingSSH.pngDualTimer.jpegTimingAdjustment.JPG 
  40   Mon Jun 10 11:59:12 2024 Ruijiu ChenAnalysisThe ion identification of spectrum recorded on 2022The simulated frequency is given in simulation_result.out.
The yield is calculated by LISE file. The
LISE file is attached here also.
 simulation_result.outE142_TEline-ESR_229Th.lppThe_ion_identification_of_spectrum_recorded_on_2022_v2.pdf 
  71   Thu Jun 13 18:48:26 2024 Ruijiu Chen, David, Shahab, YuriAnalysisThe ion identification of 229Th is correct.Harmonic: 124.0 , Bp: 7.796046 [Tm]
ion            fre[Hz]                  
    yield [pps]    
 simulation_result.outLifetime_of_beam7.pdf 
  47   Wed Jun 12 09:17:43 2024 Carsten Tests of background with ionization pumps on (from monday)On monday the ionization pumps were switch
on to test the background, and if it is possible
to run with the pumps switched on.
 mit_IZ_trending_sued_alles(blind_durch_IZ).pngmit_IZ_trending_mitte_Nord_mit_Strahl.pngmit_IZ_trending_mitte_Nord_ohne_Strahl.pngmit_IZ_trending_mitte_Nord_alles.png 
  33   Sat Jun 8 12:02:20 2024 CarstenDetectorsTest Particle Detectors - Det South not workingWith the test beam from ESR I started to have
a look at the PartDets.:
North outside: Works properly with a voltage
  
  34   Sat Jun 8 12:45:05 2024 CarstenDAQTemporary change of RF signalThe setting was 1.540974 MHz and division
factor 68 (for a 200 MeV/u) beam, and the
signal was taken from a signal generator.
  
  20   Thu Jun 6 07:12:49 2024 Konstantin MohrLaserT-ScraperThe T-Scrapers can be driven by DeviceControl,
which must be started from a console. To
do so, first open the app-launcher and then
 6x 
  58   Thu Jun 13 10:06:35 2024 Constantine, Peter, Lukas, Jonas, Dounia, CarstenAcceleratorSuspected Beam Troubles (is it really 229-Thorium?)From experience, the lifetime of the beam
in the storage ring should be on the order
of magnitude of hours, however, we observer
  
  31   Fri Jun 7 15:29:50 2024 RodolfoDetectorsStored beam @ ESROne of the first PMT signals from the stored-ion
beam @ ESR
 Storedbeam@ESR_2024-06-07_15-25-18.png 
  48   Wed Jun 12 09:43:57 2024 CarstenAcceleratorStopped NTCAP at 9:43Setup at ESR is carried on - stopped the long-time
NTCAP run from overnight,
  