HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 19 of 29  Not logged in ELOG logo
Entry  Sun May 30 14:40:55 2021, Jan, Sophia, Detectors, real detector assignment, 2021 
************************************
GEM1800 @ 90deg (xray1) 
GLP2000 @ 35deg (xray2)
Entry  Sun May 30 14:48:09 2021, Jan, Sophia, Calibration, run0215 - crap, 2021 
 
Entry  Mon May 31 10:08:42 2021, Jan, Sophia, Runs, E127b runsheet, 2021 e127b_runsheet.ods
 
Entry  Wed Jun 23 12:29:35 2021, Jan, Sophia, Calibration, Efficiency of the x-ray Detectors , 2021 Effizienz_x_ray_GEM1800_90.pngEffizienz_x_ray_GEM3000_145.pngEffizienz_x_ray_GLP_35_ohne33keV.png
For the x-ray detectors, efficiencies have been measured, before and after the experiment was performed. 
The preliminary results of the determined efficiencies can be seen in the attached plots 
Entry  Wed Jul 14 14:46:05 2021, Jan, Sophia, Detectors, collimator geometry, 2021 10x
We have measured the collimator geometry. The annotations of the variables can be found in the attached sketch  

[TABLE border="1"]
Entry  Mon May 24 15:24:52 2021, Jan, Laszlo, Piere-Michel, Enis, Runs, Run 0096, 2021 
No. of stacks: 10 (before 5)
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Mon May 24 16:06:39 2021, Jan, Laszlo, Piere-Michel, Enis, Runs, Run 0097, 2021 
Changed trafo offset during this file !!

No. of stacks: 10 (before 5)
Entry  Thu May 20 17:31:50 2021, Jan, Laszlo, Beatriz, General, beam & target alignement, 2021 
beam and target alignement was checked by looking at the Xray rates. Best case when:
Target bump (position) SC 9: -18.5mm
Entry  Wed Oct 23 14:51:43 2019, Jan, Laszlo, DAQ, VME modules & main.cfg,  main.cfg
Here is the current list of VME modules in our DRASI daq including HW addresses:

Slot    <module>        [HW addr.]
Entry  Wed Nov 6 14:13:53 2019, Jan, Laszlo, Detectors, DSSSD - 1st movement - realignment,  
We moved the new detector installation for the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion or vertical movement of the detector-arm was observed from the window flange.
Entry  Thu Dec 5 10:57:57 2019, Jan, Laszlo, Detectors, setting up the DSSD with beam,  
This is a brief how-to about getting the DSSSD set up with stored beam and target in the ESR.

The main goals
Entry  Fri Mar 20 13:21:33 2020, Jan, Laszlo, Analysis, 124Xe data of first night,  90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png
The unpacked data of all runs from the first night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
Entry  Thu May 27 14:33:05 2021, Jan, Beatriz, Alex, Runs, Run 0154 - crap run, 2021 
No. of stacks: 10 
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Thu Sep 13 11:42:33 2018, Jan Glorius, Collaboration, Proposal,  E127_Reifarth_pg.pdfE127_Approval.pdf
Attached is the beam time proposal submitted and accepted by the G-PAC in 2017.    
Entry  Thu Apr 29 20:32:52 2021, Jan Glorius, Calibration, calibration sources, 2021 
We use the following list of sources for calibration of the Xray detectors:

- 210Pb [40.1 kBq (4%), 01.10.2020 12:00 UTC] [URL=https://elog.gsi.de/esr/X-Ray+Lab/201006_131944/20-006_210Pb_40kBq.pdf]SpecSheet[/URL]
Entry  Thu Apr 29 20:34:09 2021, Jan Glorius, Calibration, run0003 - Xray90 calib Pb210 d=167.5mm, 2021 
Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
Entry  Fri Apr 30 09:27:27 2021, Jan Glorius, Calibration, run0004 - Xray90 calib Pb210 d=167.5mm , 2021 
Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
Entry  Fri Apr 30 09:57:57 2021, Jan Glorius, Calibration, run0005 - Xray90 calib Pb210 d=167.5mm , 2021 
Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
Entry  Fri Apr 30 10:55:34 2021, Jan Glorius, DAQ, Xray multi-triggers - blocking gate, 2021 
From the CFD of Xray1 (90deg) we get multiple trigger signals every ~5sec for unknown reasons. 
No hint from the preamp signals.
Entry  Fri Apr 30 11:04:31 2021, Jan Glorius, Calibration, run0006 - Xray90 calib Pb210 d=167.5mm , 2021 
Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
ELOG V3.1.5-fc6679b