ID |
Date |
Author |
Category |
Subject |
Expected |
Current Status |
New Expected Date |
Date Received |
Status |
Visual Inspection |
Test Started |
Setup |
Test Ended |
Result |
Outgoing Date |
Taken by |
Text |
|
2
|
Mon Sep 30 11:04:15 2019 |
Cristina | leak check | Cryo collimator 11-1-18-8 | | | | 24.09.2019 | DONE | Accepted | 25.09.2019 | Customised | 25.09.2019 | Accepted | 26.09.2019 | L. Bozyk | |
|
3
|
Mon Sep 30 11:11:26 2019 |
Cristina | test with bakeout | Laser chamber -Winters | Beginning 2019 | Delayed | | 16.08.2019 | DONE | Accepted | 30.08.2019 | Customised | 12.02.2020 | Accepted | KW10 | D.Winters |
The measurement was stopped because of the
wrong heating jackets |
|
4
|
Mon Sep 30 11:15:47 2019 |
Cristina | test with bakeout | Detector Recoil chamber ESR | | | | 2.09.2019 | DONE | Accepted | 9.09.2019 | Customised | 29.10.2019 | Cond. Accep. | 1.11.19 | Hillenbrand | The chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the |
|
5
|
Mon Sep 30 14:00:51 2019 |
Cristina | pumping speed | 800 l/s Agilent | | | | 20.09.2019 | DONE | Accepted | 1Test:7.10.2019; 2Test: 14.11.2019 | Fischer-Mommsen | 1.11.19 | Cond. Accep. | | Sent back to Agilent | Pumping Speed measured a bit lower than stated |
|
6
|
Mon Sep 30 14:04:43 2019 |
Cristina | pumping speed | Combi pump DN40 | | | | 09.08.2019 | DONE | Accepted | 20.08.2019 | Fischer-Mommsen | 20.09.2019 | Accepted | | Sent back to Agilent | |
|
7
|
Mon Sep 30 14:06:07 2019 |
Cristina | pumping speed | Slim SIP 150 | | | | 9.08.2019 | DONE | Accepted | 07.02.2020 | Fischer-Mommsen | 06.03.2020 | Accepted | | | |
|
8
|
Wed Oct 9 07:55:47 2019 |
Phe | leak check | All metal gate valve (Bender) | | | | 08.10.2019 | DONE | Accepted | 21.10.2019 | Customised | 24.10.2019 | Accepted | 24.10.2019 | M.Bender | Leak check required by Markus Bender for a
"all metal gate valve". The gate valve was
received on the 08.10.2019. No deadline. |
|
9
|
Wed Oct 9 07:57:44 2019 |
Phe | test with bakeout | Cryring Detector Tube | | | | 09.10.2019 | DONE | Accepted | 10.10.2019 | Setup 1 | 22.10.2019 | Accepted | 24.10.2019 | Spillmann | Detector tube has been received from Grossmontage
(given to Andreas Kraemer). This Detector
tube is for Cryring - measurement request |
|
10
|
Wed Oct 9 08:01:51 2019 |
Phe | test with bakeout | Macor Samples from Tino Giacomini | | | | 02.10.2019 | DONE | Accepted | 10.10.2019 | Mobile 2 | 6.11.19 | Accepted | 8.11.19 | Giacomini | Macor samples have been received from Tino
Giacomini on the 02.10.2019. These Macor
samples will be used for IPM chamber. The |
|
11
|
Wed Oct 9 14:19:09 2019 |
Phe | test with bakeout | Scrapper for ESR (for Markus Steck) | | | | 09.10.2019 | DONE | Accepted | 14.10.2019 | Setup 2 | 18.10.2019 | Accepted | 24.10.2019 | Schwarz | Measurements asked as "urgent" for ESR. This
piece was already measured in 2014, and then
stored in an unkwon place. |
|
12
|
Mon Oct 14 10:08:14 2019 |
Cristina | leak check | Dipole chamber SIS100 First charge | | | | 10.10.2019 | DONE | Accepted | 11.10.2019 | Customised | 29.11.2019 | Accepted | | Stored in the TH | 6 dipole received on the KW41. Integral leak
check and 1 test without bakeout
After the
vacuum test the chambers must be inserted |
|
13
|
Mon Oct 14 10:09:36 2019 |
Cristina | leak check | Roughing CWT 3 charge | | | | 10.10.2019 | DONE | Accepted | 14.10.2019 | Customised | 14.11.19 | Accepted | | Stored in Weiterstadt | Integral leak check to be done for all CWT.
DONE:
07-51-23-0; 07-51-26-1; 07-51-30-8;
07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6 |
|
14
|
Wed Oct 16 08:24:29 2019 |
Toni | leak check | Kryokollimator | June 2019 | Delayed | August | from September 2019 | DONE | Not Needed | 02.09.2019 | Customised | 09.12.2020 | Accepted | | | Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01;
11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9;
11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4; |
|
15
|
Mon Oct 21 10:24:59 2019 |
Cristina | Other | Tube Heidelberg | | | | 17.10.2019 | DONE | Accepted | First Test: 24.10.2019; Second Test:30.01.20 | Horizontal Coating Setup | 29.10.2019: Refused; Second Test: 05.02.2020 | Accepted | 11.02.2020 | C.Schröter | Tube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning |
|
Draft
|
Thu Oct 24 14:55:28 2019 |
Toni | | | | | | | | | | | | | | | |
|
Draft
|
Thu Oct 24 14:58:25 2019 |
Toni | | | | | | | | | | | | | | | |
|
18
|
Fri Nov 1 10:41:45 2019 |
Cristina | test with bakeout | IPM Chamber | | | | 4.09.2019 | DONE | Refused | | | | Refused | 1.11.19 | Angelo | Bellows to short |
|
19
|
Fri Nov 8 10:52:43 2019 |
Cristina | test with bakeout | Macor 2 for IPM | | | | 8.11.19 | DONE | Accepted | 11.11.2019 | Mobile 2 | 18.11.2019 | Accepted | 04.12.19 | T. Giacomini | |
|
20
|
Mon Nov 11 08:06:09 2019 |
Phe | test without bakeout | Ref. Chamber for Beam Diagnostic Manipulator (Hackhalle) | | | | unknown | DONE | Accepted | 11.11.2019; 10:15 am, stopped 12.11.2019 | Customised | | Refused | | | Broken gauge (cold cathode gauge). |
|
21
|
Thu Nov 14 14:00:28 2019 |
Phe | test without bakeout | Ref. Chamber for Beam Diagnostic Manipulator | | | | unknown | DONE | Accepted | 14.11.2019; 10:30 am | Customised | 22.11.2019 | Cond. Accep. | N/A | N/A | Wide range gauge is now installed on the chamber.
The previous test with cold cathode gauge
failed due to broken gauge.
Another |
|
22
|
Fri Nov 22 11:07:36 2019 |
Phe | test without bakeout | Beam Diagnostic Chambers from India for HEBT - small one | | | | unknown | DONE | Refused | 09.01.2020 | Customised | 10.01.2020 - still pumping | Accepted | 15.01.20 | Mahr Rainer |
Inside of the chamber is dirty (black mark
when wiped with tissue).
At the moment
(16.12.2019), the chamber is under cleaning.
Chamber |
|
23
|
Fri Nov 22 11:08:19 2019 |
Phe | test with bakeout | SEM-Monitor for Beam Diagnostic SIS18 | | | | 02.12.2019 | DONE | Accepted | 03.12.2019 | Setup 2 | 13.12.2019 | Cond. Accep. | 06.01.2020 | Fiedler, Sebastian | |
|
24
|
Fri Nov 22 11:09:19 2019 |
Phe | test with bakeout | Grid for Beam Diagnostic SIS18 | | | | 02.12.2019 | DONE | Accepted | 03.12.2019 | Setup 1 | 13.12.2019 | Cond. Accep. | 06.01.2020 | Fiedler, Sebastian | |
|
25
|
Fri Nov 22 11:09:59 2019 |
Phe | Other | Septum SIS100 - NEG coated chamber | End 2019 | Delayed | | unknown | TO COME | | | | | | | | |
|
26
|
Fri Nov 22 11:10:33 2019 |
Phe | test with bakeout | Dipole Chambers for SIS100 (2box) | 25.11.19 | Delayed | Unknown | 17.01.20 | DONE | Accepted | 12.02.2020 | | End februar | Accepted | | | All chambers are inserted with success into
the magnet. Leak check for: 07-6-013-3; 07-6-009-6;
07-6-011-9 |
|
Draft
|
Fri Nov 22 11:11:00 2019 |
Phe | test with bakeout | Quad Chambers for SIS100 | | | | unknown | TO COME | | | | | | | | |
|
28
|
Fri Nov 22 11:11:24 2019 |
Phe | leak check | 4th batch of roughing CWT for SIS100 | | | | 06.01.20 | DONE | Accepted | 10.02.2020 | Customised | 13.03.20 | Accepted | | Stored in Weiterstadt | 07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9;
07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK
WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1; |
|
29
|
Fri Nov 22 11:11:56 2019 |
Phe | test with bakeout | 'Spill-Cavitaet" ??? | August 2019 | Delayed | KW26 | | TO COME | | | | | | | | |
|
30
|
Thu Nov 28 11:09:29 2019 |
Cristina | test with bakeout | Reference chamber for Grid for beam diagnostic SIS18 | | | | 06.01.2020 | DONE | Not Needed | 09.01.2020; | Setup 1 | 19.01.20 | Accepted | ---------- | ---------- | |
|
Draft
|
Thu Nov 28 11:11:16 2019 |
Cristina | test with bakeout | Reference chamber for Monitor for beam diagnostic | | | | 09.01.2020 | on-going | Not Needed | 08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 am | Setup 2 | | | | | |
|
32
|
Mon Dec 2 14:28:58 2019 |
Cristina | General | TS1MU1-test with magnet | August 2019 delayed to KW6 2020 | Delayed | Unkwon | N/A | DONE | Accepted | 04.03.2020 | Customised | | Accepted | | Grossmontage | Test bakeout inside the magnet |
|
34
|
Wed Dec 4 10:08:42 2019 |
Cristina | test with bakeout | Macor 3 charge | | | | 04.12.19 | DONE | Accepted | 11.02.2020 | Customised | 20.03.2020 | Cond. Accep. | 23.03.2020 | T. Giacomini | |
|
35
|
Thu Dec 12 09:20:54 2019 |
Cristina | test with bakeout | IPM SIS100-Giacomini | Jannuary 2020 | Delayed | Unknown | 21.04.2020 | DONE | Not Needed | 04.05.2020 | Customised | 15.05.2020 | Accepted | Mai/Juni | Brough to the TH | |
|
36
|
Thu Dec 12 09:22:19 2019 |
Cristina | test without bakeout | Palmer PU Tank- Dimopoulou | January 2020 | on schedule | January 2020 | January 2020 | DONE | Accepted | 28.01.20 | Customised | 31.01.20 | Accepted | 03.02.20 | Grossmontage | |
|
37
|
Thu Dec 12 10:19:06 2019 |
Cristina | test with bakeout | Pumping chamber SIS100 -Stefan | End 2019 | Delayed | Beginning2020 | 10.12.19 | DONE | Accepted | January | Customised | 05.02.2020 | Accepted | | Stored in the TH | |
|
38
|
Fri Dec 13 09:03:27 2019 |
Christian | leak check | Fasersonde Unilac | | | | 12.12.19 | DONE | Accepted | 12.12.19 | Customised | 16.12.19 | Refused | 16.12.19 | Sthraldiagnose | |
|
39
|
Mon Dec 16 15:27:50 2019 |
Phe | test without bakeout | Beam Diagnostic from Inida - big one | | | | 13.13.2019 | DONE | Refused | 15.01.20 | Customised | 19.01.20 | Accepted | 24.01.201 | M.Müller |
The chamber has a dent.
At the moment
(16.12.2019), the chamber is under test for
mechanical acceptance. |
|
40
|
Tue Dec 17 13:39:20 2019 |
Phe | leak check | Fasersonde Unilac -2 test | | | | 17.12.2019 | DONE | Not Needed | 17.12.2019 | Customised | 17.12.2019 | Accepted | 20.12.2019 | Beam diagnostic | This phase probe was tested by Christian Kolligs
on the 12.12.2019 and it has leak rate of
1E-6 mbar.l/s.
|
|
41
|
Wed Dec 18 11:27:54 2019 |
Phe | leak check | Transistion tube for SIS100 string test | Beginning 2020 | Delayed | February | 06.02.2020 | DONE | Refused | | | | Refused | | | |
|
42
|
Thu Jan 16 09:05:12 2020 |
Cristina | test without bakeout | BPM SIS100- 2010-3 | 27.01.20 | Delayed | 30.01.20 | 30.01.20 | DONE | Accepted | 03.02.2020 | Customised | 05.02.2020 | Refused | 10.02.2020 | M.Müller |
New mobile pumping station - the controller
for the IMG did not work. The pressure is
recorded from the gauge controller of Mobile |
|
43
|
Mon Jan 20 10:40:00 2020 |
Cristina | test with bakeout | Ceramic Tube Diagnostic-Dorn 06-004-01376-3 | KW4 | On schedule | KW4 | 20.01.20 | DONE | Accepted | 21.01.2020 | Setup 1 | 27.01.20 | Accepted | 29.01.20 | M.Müller | |
|
44
|
Thu Feb 6 10:33:17 2020 |
Cristina | test without bakeout | BPM 2010-17 (keept in the new cryostat) | KW7 | On schedule | KW7 | 10.02.2020 | DONE | Accepted | 12.02.2020 | Mobile 3 | 14.02.2020 | Refused | 18.02.2020 | M.Müller | |
|
45
|
Thu Feb 6 10:34:00 2020 |
Cristina | test without bakeout | BPM 2010-15 (from the Company) | KW8 | On schedule | KW8 | 18.02.2020 | DONE | Refused | 19.02.2020 | Mobile 3 | 21.02.2020 | Cond. Accep. | 25.02.2020 | M.Müller | |
|
46
|
Thu Feb 6 10:34:25 2020 |
Cristina | test without bakeout | BPM 2010-16 (keep in the old cryostat) | KW9 | On schedule | KW9 | 26.02.2020 | DONE | Refused | 26.02.2020 | Mobile 3 | 28.02.2020 | Cond. Accep. | 27.02.2020 | Müller | |
|
47
|
Thu Feb 6 11:11:21 2020 |
Cristina | General | In kind contribution Sweden -Niko | March 2020 | On schedule | | | | | | | | | | | |
|
48
|
Thu Feb 6 12:45:52 2020 |
Cristina | test without bakeout | Protoype BV CWT | March | On schedule | | 26.08.20 | DONE | Not Needed | 14.09.20 | Customised | 21.09.20 | Accepted | 22.09.20 | S. Wilfert | |
|
49
|
Thu Feb 6 12:47:18 2020 |
Cristina | leak check | Interconnction bellows between Dipole and Quadrupole | October | On schedule | | 3.11.20 | DONE | Accepted | 04.11.20 | Customised | 04.11.20 | Refused | 04.11.20 | in Büro of S.Wilfert | |
|
50
|
Thu Feb 6 12:48:46 2020 |
Cristina | leak check | 30 SIS 100 pumping chambers | May 20 | Delayed | December 20 | | | | | | | | | | 1 chamber required: acceptance test without
bakeout |
|
51
|
Tue Feb 11 09:53:14 2020 |
Cristina | leak check | SIS100 Sextupole (6) | September 2020 | Delayed | | | | | | | | | | | |
|
52
|
Tue Feb 11 09:54:49 2020 |
Cristina | test with bakeout | SIS100 Injection Kicker | September 2020 | Delayed | | | | | | | | | | | |
|
53
|
Tue Feb 11 09:57:17 2020 |
Cristina | test with bakeout | SIS100 diagnostic chambers | June 2020 | Delayed | | 17.11.2020 | DONE | Not Needed | 17.11.20 | Customised | 25.11.20 | Cond. Accep. | 01.12.20 | Grossmontage | There are a total of 6 chambers. We have to
do leak check to all 6, and a complete SAT
(with bakeout) to 1 chamber |
|
54
|
Tue Feb 11 09:59:48 2020 |
Cristina | leak check | SIS100 Quadrupole chambers | March 2020 | Delayed | September 20 | September 20 | DONE | Accepted | 30.09.20 | HEBT Setup | 06.10.20 | Accepted | 8.10.20 | I.Pongrac | |
|
55
|
Fri Feb 14 13:34:54 2020 |
Cristina | test with bakeout | Berrilium Copper Stripes Dermati | 14.02.2020 | On schedule | 14.02.2020 | 14.02.2020 | DONE | Not Needed | 17.02.2020; 11:30 am | Setup 1 | 24.02.2020 | Cond. Accep. | 26.02.2020 | Bardonner | |
|
57
|
Wed Feb 19 11:42:59 2020 |
Cristina | pumping speed | TMP Cryring (Nikita) | KW8 | On schedule | KW8 | 19.02.2020 | DONE | Refused | 9.03.2020 | Fischer-Mommsen | 16.03.2020 | Accepted | 29.05.2020 | Nikita | |
|
58
|
Tue Mar 3 09:34:40 2020 |
Cristina | Coating | SPARC chambers | June 2019 | Delayed | Febraury 2020 | 12.02.2020 | DONE | Accepted | 01.09.2020 | Horizontal Coating Setup | 03.11.20 | Accepted | 10.12.20 | Track to Jülich | HR11VU61 (21.09.20); HR18VU63 (06.10.20);
HR19VU64 (26.10.20); HR12VU62(02.11.20) |
|
59
|
Tue Mar 3 09:58:03 2020 |
Cristina | test with bakeout | Ferrite RI (as received) | 15.March | On schedule | | 20.03.2020 | DONE | Not Needed | 23.03.2020 | Setup 1 | 27.03.2020 | Cond. Accep. | -------- | --------- | |
|
60
|
Tue Mar 3 13:50:28 2020 |
Cristina | test with bakeout | Macor 4 -IPM Giacomini | KW10 | On schedule | | 03.03.2020 | DONE | Not Needed | 18.03.2020; 07:45 am | Mobile 2 | 27.03.2020 | Cond. Accep. | 11.05.2020 | T. Giacomini | |
|
61
|
Wed Mar 4 10:06:09 2020 |
Phe | leak check | Transistion tube for SIS100 string test_Second test | Beginning 2020 | Delayed | February | End of February | DONE | Accepted | 03.03.2020 | Customised | 03.03.2020 | Accepted | 5.03.2020 | Ivan and Stefan (for integration @BNG) | |
|
62
|
Mon Mar 9 08:46:22 2020 |
Phe | test without bakeout | BPM SIS100 2010-3, repeat after long pumping @ Hackhalle | | On schedule | | 06.03.2020 | DONE | Accepted | 09.03.2020; 07:00 am | Mobile 3 | 10.03.2020 | Accepted | 12.03.2020 | M.Müller | |
|
63
|
Thu Mar 12 13:47:38 2020 |
Phe | test without bakeout | BPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic) | Received | On schedule | | 12.03.2020 | DONE | Not Needed | 12.03.2020; 11:55 am | Mobile 3 | 17.03.2020; 11:00 am | Accepted | 19.03.2020 | M.Müller | |
|
64
|
Thu Mar 12 13:49:09 2020 |
Phe | test without bakeout | BPM SIS100 2010-17 (ceramic only) | Received | On schedule | | 12.03.2020 | DONE | Not Needed | 18.03.2020; 08:25 | Setup 1 | 19.03.2020; 11:00 | Cond. Accep. | 19.03.2020 | M.Müller | |
|
66
|
Thu Mar 19 11:23:38 2020 |
Phe | test without bakeout | BPM SIS100 2010-15 (after cryo) | | On schedule | | 19.03.2020 | DONE | Not Needed | 19.03.2020; 15:00 | Mobile 3 | 25.03.2020 | Cond. Accep. | 26.03.2020 | M.Müller | |
|
67
|
Wed Mar 25 14:22:40 2020 |
Phe | test without bakeout | Broken ceramic for BPM | | On schedule | | 25.03.2020 | DONE | Not Needed | 26.03.2020 | Setup 2 | 27.03.2020 | Cond. Accep. | 28.03.2020 | M.Müller | |
|
68
|
Mon Apr 6 15:33:45 2020 |
Phe | test with bakeout | Unbaked Ferrites from RI (bigger size) | | On schedule | | 06.04.2020 | DONE | Not Needed | | Setup 1 | 22.04.2020 | Cond. Accep. | | | |
|
69
|
Wed Apr 22 08:35:13 2020 |
Phe | test without bakeout | BPM 2010-15 - 2 weeks pump down in Hackhalle | | On schedule | | 21.04.2020 | DONE | Not Needed | 21.04.2020; 17:00 | Mobile 3 | 24.04.2020 | Accepted | 23.04.20 | M.Müller | |
|
70
|
Wed Apr 22 10:14:43 2020 |
Cristina | test with bakeout | Ceramic Tube for Cryring (Sieber | KW13 | Delayed | 22.04.2020 | 24.04.2020 | DONE | Not Needed | 27.04.2020 | Setup 2 | 06.05.2020 | Refused | 8.05.2020 | T.Sieber | |
|
71
|
Wed Apr 22 13:45:53 2020 |
Cristina | test without bakeout | p-linac dipoles | 20.04.2020 | On schedule | | 20.04.2020 | DONE | Accepted | 21.04.2020 | HEBT Setup | 29.04.2020 | Cond. Accep. | 27.05.2020 | Florian (Grossmontage) | |
|
72
|
Fri Apr 24 09:56:27 2020 |
Cristina | test with bakeout | Be windows-Spillman | KW18 | On schedule | | 28.04.2020 | DONE | Not Needed | 26.05.2020 | Setup 2 | MEASUREMENTS STOPPED | | 02.10.20 | Collegue Spillman | |
|
73
|
Wed May 13 15:26:53 2020 |
Phe | test with bakeout | Big Baked Ferrites PLT 90/50/30 8C11 and Small baked Ferrites CMD5005 | | On schedule | | 11.05.2020 | DONE | Not Needed | 13.05.2020; 7:40 am | Setup 1 | 25.05.2020 | Cond. Accep. | --------- | ----------- | |
|
74
|
Tue May 19 09:20:24 2020 |
Cristina | test with bakeout | Ceramic parts Hillenbrand | 25.05.20 | On schedule | | 25.05.2020 | DONE | Accepted | 26.05.2020 | Setup 1 | 30.05.2020 | Accepted | 09.06.2020 | Hillenbrand | |
|
75
|
Tue May 19 12:03:40 2020 |
Phe | Problem | Turbo Pump from Thomas Seiber | | On schedule | | KW19 | DONE | Not Needed | 19.05.2020 | Customised | 20.05.2020 | Refused | 27.05.2020 | Student from T.Sieber | Die Pumpe hat den Fehlercode 088 und hat eine
Störung des Axiallagersensors.(checked by
Graziano) |
|
76
|
Wed May 27 10:34:37 2020 |
Phe | test without bakeout | BPM SIS100 X2010-16 | | | | KW21 | DONE | Not Needed | 20.05.2020 | Customised | 22.05.2020 | Cond. Accep. | 26.08.20 | M.Müller | |
|
77
|
Wed Jun 17 10:13:57 2020 |
Cristina | test with bakeout | IPM SIS18 | End May | On schedule | | End May (the gewind had to be redone by Pfeiffer) | DONE | Accepted | 17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20 | Customised | 31.08.20 | Cond. Accep. | 04.09.2020 | Back to Tino G. | |
|
78
|
Wed Jun 17 12:58:02 2020 |
Cristina | test without bakeout | SIS100 Dipole 07-6-016-4 | ---- | | ------ | 17.06.2020 | DONE | Accepted | 17.06.2020 | HEBT Setup | 19.06.2020 | Cond. Accep. | 22.06.2020 | brought back to the TH | |
|
79
|
Fri Aug 28 11:51:30 2020 |
Phe | test without bakeout | SIS100 dipole 07-00009-020-01 | | | | | DONE | Accepted | 26.08.20 | HEBT Setup | 28.08.20 | Refused | 1.09.20 | in the TH | |
|
80
|
Fri Aug 28 11:52:43 2020 |
Phe | test without bakeout | BPM SIS100 2010-61 | | | | 26.08.20 | DONE | Accepted | 26.08.20 | Mobile 3 | 28.08.20 | Cond. Accep. | 09.09.20 | S. Fiedler | |
|
81
|
Fri Sep 11 09:56:40 2020 |
Cristina | test without bakeout | BPM SIS100 X2010-63 | | | | | DONE | Accepted | 31.08.2020 | Mobile 3 | 01.09.20 | Accepted | 09.09.20 | S. Fiedler | |
|
82
|
Fri Sep 11 09:59:20 2020 |
Cristina | test without bakeout | Bellows IPM SIS18 | | | | 01.09.2020 | DONE | Refused | 02.09.2020 | HEBT Setup | 03.09.2020 | Refused | 11.09.2020 | Zentrale Dienst (back to Giacomini) | |
|
83
|
Fri Sep 11 10:07:46 2020 |
Cristina | test with bakeout | Nuts company TwinNut | | | | | DONE | Accepted | 01.09.2020 | Mobile 2 | 10.09.2020 | Accepted | ------ | -------- | |
|
84
|
Fri Sep 11 10:13:59 2020 |
Cristina | test without bakeout | Cecom diagnostic chamber HEBT | | | | 01.09.2020 | DONE | Accepted | 02.09.2020 | Setup 1 | 04.09.2020 | Cond. Accep. | 23.09.20 | M.Müller | |
|
85
|
Mon Sep 14 09:15:03 2020 |
Cristina | test without bakeout | BPM SIS100 2010-17 | | | | 09.09.20 | DONE | Accepted | 09.09.2020 | Mobile 3 | 10.09.2020 | Cond. Accep. | 17.09.2020 | M. Müller | |
|
86
|
Mon Sep 14 09:16:54 2020 |
Cristina | test with bakeout | Mirror Laser cooling SIS100 | | | | 14.09.2020 | DONE | Accepted | 6.10.20 | Mobile 2 | 21.10.20 | Cond. Accep. | KW47 | D.Winters | |
|
87
|
Mon Sep 14 10:38:59 2020 |
Cristina | test without bakeout | Test on Viton gasket | | | | 14.09.2020 | TO DO | Not Needed | | | | | | | |
|
88
|
Tue Sep 15 11:14:44 2020 |
Cristina | leak check | SIS100 Dipole chambers | | | | | on-going | | July 2019 | Customised | | | | | 07-00006-001-0; 07-00006-002-7; 07-00006-003-4;
07-00006-004-1; 07-00006-005-8; 07-00006-006-5;
07-00006-007-2; 07-00006-009-6; 07-00006-010-2; |
|
90
|
Mon Sep 21 11:31:47 2020 |
Cristina | test without bakeout | HEBT BPM | KW39 | On schedule | | 28.09.20 | on-going | Accepted | 05.10.20. Test started again: 08.12.20 | Mobile 3 | | Refused | | | Since 19. Okt we wait for the decision of
the diagnostic group on how(who has to clean
the BPM. Since then the test is stopped.
Meeting |
|
91
|
Mon Sep 21 11:32:46 2020 |
Cristina | test with bakeout | Ferrite RI after firing | | | | 18.09.20 | DONE | Accepted | 22.09.2020 | Setup 1 | 1.10.20 | Accepted | --------- | --------- | |
|
92
|
Mon Sep 21 11:39:27 2020 |
Cristina | test without bakeout | Steel with epoxy glue | August 20 | Delayed | | 21.09.20 | DONE | | 22.09.2020 | | 03.10.20 | Refused | ? | ? | |
|
93
|
Mon Sep 21 14:26:53 2020 |
Cristina | leak check | Beam line CWT | | | | 21.08.20 | | | 21.09.20 | Customised | 23.09.2020 | Accepted | 24.09.20 | S.Wilfert | |
|
95
|
Wed Sep 30 13:39:48 2020 |
Cristina | test with bakeout | Tube CCC Cryring | | | | 30.09.2020 | DONE | Accepted | 5.10.20 | Setup 1 | 07.10.20 | Accepted | 8.10.20 | T. Sieber | |
|
96
|
Tue Oct 13 07:54:31 2020 |
Phe | test without bakeout | Epoxy - baked in the oven @ 80 deg C | 09.10.2020 | On schedule | | 09.10.2020 | DONE | Not Needed | 22.10.20 | Mobile 2 | 29.10.20 | Refused | | | |
|
97
|
Wed Oct 21 10:51:47 2020 |
Cristina | test with bakeout | IPM SIS18 mit diagnostic parts | | | | 25.09.2020 | DONE | Refused | 20.10.20 | | 29.10.20 | Cond. Accep. | 2.11.20 | Grossmontage | |
|
98
|
Tue Nov 3 09:55:20 2020 |
Cristina | test with bakeout | MCPs for IPM SIS18 | September | Delayed | | 2.11.20 | DONE | Accepted | 2.11.20 | Setup 1 | 09.11.2020 | Cond. Accep. | 10.11.2020 | T.Giacomini | |
|
99
|
Tue Nov 17 09:43:55 2020 |
Cristina | test without bakeout | BPM 2010-16 | | | | ? | DONE | Accepted | 16.11.20 | Mobile 3 | 17.11.20 | Cond. Accep. | 01.12.20 | Grossmontage | |
|
100
|
Thu Nov 19 10:15:23 2020 |
Cristina | Coating | Parts for Cryring | | | | Beginning October 20 | DONE | Accepted | 16.11.20 | Horizontal Coating Setup | 17.11.20 | Accepted | 26.11.20 | David (Cryring) | There are some parts which were not coated:
2 bellows (the Cryring people still did not
receive them from the company) and a T-piece, |
|
101
|
Thu Nov 19 10:17:06 2020 |
Cristina | Coating | Coating chamber Glorius | | | | 16.11.20 | DONE | Accepted | 27.11.20 | Horizontal Coating Setup | 3.12.20 | Accepted | 14.12.20 | Glorius | |
|
102
|
Mon Nov 30 11:14:30 2020 |
Cristina | Coating | T-piece Cryring | Oct | | | KW48 | DONE | Accepted | 26.11.20 | Horizontal Coating Setup | 3.12.20 | Accepted | 10.12.20 | Nikita | |
|
103
|
Mon Nov 30 11:15:48 2020 |
Cristina | test with bakeout | Antrieb for ESR-Beata | 1 Dec. | Delayed | ? | 3.12.20 | DONE | Not Needed | 3.12.20 | Setup 1 | 10.12.2020 | Accepted | 11.12.20 | Müller | |
|
104
|
Mon Nov 30 11:17:49 2020 |
Cristina | leak check | 5 x SIS100 Diagnostic Chambers | KW 49 | | | | DONE | Not Needed | 01.12.20 | | 16.12.20 | Accepted | | | 06-00401-099-1 (abgeholt on the 07.12 M.Müller);
06-00401-100-4 (abgeholt 09.12.20 Müller);
06-00401-101-1; 06-00401-103-5 |
|
105
|
Tue Dec 1 11:49:07 2020 |
Cristina | test with bakeout | Bellows IPM SIS18-Second measurement after cleaning | | | | 12.10.20 | DONE | Not Needed | 12.10.20 | HEBT Setup | 14.10.20 | Accepted | 15.10.20 | Zentrale Dienst | |
|
106
|
Tue Jan 12 12:48:45 2021 |
Cristina | test without bakeout | HEBT BPM-Cleaned @Kyocera | Beginning 21 | On schedule | | 12.01.21 | DONE | Accepted | 12.01.21 | Mobile 3 | 14.01.21 | Accepted | 19.01.21 | M.Müller | |
|
107
|
Wed Jan 20 11:48:54 2021 |
Cristina | test without bakeout | HEBT BPM cleaned @GSI | | | | 19.01.21 | DONE | Accepted | 20.01.21 | Mobile 3 | 21.01.21 | Refused | 24.02.21 | M.Müller | |
|
108
|
Fri Jan 29 11:50:13 2021 |
Cristina | General | Pillow seals SFRS | | | | 14.01.21 | DONE | Accepted | 18.01.21 | Customised | 26.02.21 | Cond. Accep. | 12.03.21 | Cristos | |
|
109
|
Fri Jan 29 11:52:53 2021 |
Cristina | pumping speed | NEG strips CRYRing | | | | End Dec 20 | DONE | Accepted | 25.01.21 | Fischer-Mommsen | 17.02.2021 | Accepted | 02.03.21 | Nikos | |
|
110
|
Fri Jan 29 11:54:20 2021 |
Cristina | leak check | Gate Valve | | | | 14.01.21 | DONE | Accepted | 28.01.21 | Customised | 28.01.21 | Refused | 29.01.21 | A.Tauschwitz | |
|
111
|
Fri Jan 29 11:55:45 2021 |
Cristina | General | Lower pressure of primary pumps | | | | Dec 20 | DONE | Accepted | 18.01.21 | Customised | 22.01.21 | Accepted | ----- | G.Savino | |
|
112
|
Mon Feb 1 16:04:00 2021 |
Phe | test with bakeout | Antriebe SIS100 | | On schedule | | 01.02.2021 | DONE | | 02.02.2021 | Setup 1 | 10.02.2021 | Accepted | 11.02.21 | M.Müller | |
|
113
|
Wed Feb 3 11:47:32 2021 |
Cristina | leak check | CARME vacuum chamber | Dec 2020 | Delayed | | 02.02.2021 | DONE | Accepted | 02.02.2021 | Customised | 02.202.2021 | Accepted | 03.02.2021 | N.Petridis | |
|
114
|
Wed Feb 3 11:50:09 2021 |
Cristina | test with bakeout | Detector Pockets for scintillators SIS18 | | | | 02.02.2021 | on-going | | 08.02.21 | HEBT Setup | 11.03.21 | Cond. Accep. | 12.03.21 | M.Müller | |
|
115
|
Wed Feb 17 11:30:26 2021 |
Cristina | test without bakeout | CECOM diagnostic chamber | 1.02.21 | | | 17.02.21 | DONE | Accepted | 18.01.21 | Customised | 19.02.21 | Cond. Accep. | | | |
|
116
|
Wed Feb 17 11:31:08 2021 |
Cristina | test without bakeout | SIS100 BPM | | | | 15.02.21 | DONE | Accepted | 16.02.21 | | 18.02.21 | Accepted | 24.02.21 | M.Müller | |
|
117
|
Wed Feb 17 11:50:45 2021 |
Cristina | leak check | SIS100 HF Cavities | | | | 15.02.21 | DONE | Accepted | 15.02.21 | Customised | 16.02.21 | Accepted | 17.02.21 | In Weitestadt | |
|
118
|
Fri Feb 19 08:39:57 2021 |
Cristina | | HEBT BPM cleaned @GSI-second measurement | | | | 10.02.21 | DONE | Accepted | 10.02.21 | Customised | 18.02.21 | Accepted | 24.02.21 | M.Müller | |
|
119
|
Fri Feb 19 08:41:46 2021 |
Cristina | leak check | 2x Cryostats-Kujouharov | 1.02.21 | | 11.02.21 | 11.02.21 | DONE | | 12.02.21 | Customised | 02.03.21 | Cond. Accep. | 09.03.21 | Kojouharov | |
|
120
|
Wed Feb 24 13:50:25 2021 |
Cristina | leak check | Cavity for DALINAC | 22.02.21 | Delayed | 01.03.21 | 09.03.21 | DONE | Not Needed | 10.03.21 | Customised | 11.03.21 | Cond. Accep. | 18.03.21 | Dmytriiev D. | The cavity is dirty und must be cleaned |
|
121
|
Wed Feb 24 13:51:01 2021 |
Cristina | test with bakeout | 3D printed tube per pLinac | 01.03.21 | | | 08.03.21 | DONE | Accepted | 16.03.21 | Setup 1 | 18.03.21 | Accepted | 18.01.21 | Büro Andreas | |
|
122
|
Wed Mar 10 12:11:04 2021 |
Cristina | test with bakeout | Viewports DN100 ESR | | | | 16.02.21 | on-going | Not Needed | 16.02.21 | Setup 1 | 16.03.21 | Cond. Accep. | 26.03.21 | R.Sanchez | |
|
123
|
Thu Mar 18 11:40:02 2021 |
Cristina | test with bakeout | SIS100/HEBT Manipulator C.Dorn | | | | 17.03.21 | DONE | Not Needed | 18.03.21 | Setup 1 | 24.03.21 | Accepted | 29.03.21 | M.Müller | |
|
124
|
Wed Apr 28 10:05:13 2021 |
Cristina | test without bakeout | SIS100 pumping chambers -after cleaning by the Company | | | | 23.04.21 | on-going | Accepted | 26.04. | Customised | 21.05.21 | Cond. Accep. | | | 5 chambers checked: 07-00052-05-3; 06-00052-06-0;
07-00052-02-2; 07-00052-03-9; 07-00052-04-6 |
|
125
|
Wed Apr 28 10:21:27 2021 |
Cristina | test without bakeout | Cecom after cleaning | | | | 06.04.21 | DONE | Not Needed | 06.04.21 | Customised | 08.04.21 | Accepted | 12.05.21 | M.Müller | |
|
126
|
Wed Apr 28 10:23:18 2021 |
Cristina | test without bakeout | 3Dprinting Copper coated sample | | | | 25.03.21 | DONE | Not Needed | 25.03.21 | | 26.03.21 | Cond. Accep. | | | |
|
127
|
Wed Apr 28 10:28:18 2021 |
Cristina | test without bakeout | Ceramic for SIS100 BPM | | | | 22.03.21 | DONE | | 22.03.21 | Mobile 3 | 29.03.21 | Accepted | | M.Müller | |
|
128
|
Wed Apr 28 10:30:54 2021 |
Cristina | test with bakeout | HEBT Antrieb (in-kind Slovenia) 06-0050-39-54 | | | | 23.04.21 | DONE | Not Needed | 26.04.21 | Setup 1 | 03.05.21 | Accepted | 06.05.21 | M.Müller | |
|
129
|
Tue May 18 10:50:26 2021 |
Cristina | test with bakeout | HEBT Antrieb 06-0050-036-40 | | | | 06.05.21 | DONE | Not Needed | 06.05.21 | Setup 1 | 12.05.21 | Accepted | 17.05.21 | M.Müller | |
|
130
|
Tue May 18 14:10:04 2021 |
Cristina | test without bakeout | Trafos BPM | | | | 12.05.21 | DONE | Not Needed | 18.05.21 | Customised | 21.05.21 | Refused | 07.06.21 | M.Müller | |
|
131
|
Tue May 18 14:11:08 2021 |
Cristina | test without bakeout | BPM CID: 06005002605 | | | | 18.05.21 | DONE | | 19.05.21 | Mobile 3 | 21.05.21 | Cond. Accep. | 07.06.21 | M.Müller | |
|
132
|
Fri May 21 13:29:15 2021 |
Cristina | test with bakeout | 2xDN63 windows for ESR | | | | 20.05.21 | DONE | Not Needed | 18.05.21 | Setup 1 | 02.06.21 | Accepted | 18.06.21 | R.Sanchez | |
|
133
|
Tue Jun 8 10:19:14 2021 |
Cristina | test without bakeout | Dipole Module | | | | 25.05.21 | DONE | Not Needed | 25.05.21 | Customised | 27.07.21 | Cond. Accep. | TH | F.Kaether | |
|
134
|
Tue Jun 8 10:27:49 2021 |
Cristina | test with bakeout | Mirror system ESR-Brandau | 07.06.21 | Delayed | | 21.06.21 | DONE | Not Needed | 25.06.21 | Mobile 2 | 13.07.21 | Cond. Accep. | 24.09.21 | Brandau | |
|
135
|
Tue Jun 8 10:28:46 2021 |
Cristina | test with bakeout | Pockets for ESR | KW25 | | | 21.06.21 | DONE | Not Needed | 24.06.21 | Setup 1 | 12.07.21 | Accepted | 19.07.21 | Glorious | |
|
136
|
Mon Jun 14 11:48:43 2021 |
Cristina | test with bakeout | Antrieb für SIS100 | | | | 07.06.21 | DONE | Not Needed | 14.06.21 | Setup 1 | 22.06.21 | Accepted | 28.06.21 | M.Müller | |
|
137
|
Thu Jun 24 12:05:07 2021 |
Cristina | test with bakeout | Bearings for HEBT-foil-stripper -Zeller | KW26 | | | 01.07.21 | DONE | Not Needed | 14.07.21 | Mobile 2 | 05.08.21 | Refused | | | |
|
138
|
Thu Jun 24 12:06:49 2021 |
Cristina | test with bakeout | Test for polymide coated sample- Fischer | | | | | DONE | | 2.07.21 | HEBT Setup | 6.07.21 | Cond. Accep. | 8.07.21 | L.Fischer | |
|
139
|
Thu Jun 24 12:07:27 2021 |
Cristina | test with bakeout | Injection Septa SIS100 | | | | 21.06.21 | DONE | Not Needed | 23.06.21 | Customised | 14.07.21 | Cond. Accep. | 19.07.21 | Report sent to I.Pongrac (Component in TH) | |
|
140
|
Mon Jul 12 13:45:55 2021 |
Cristina | test with bakeout | BPM SIS100 | | | | 09.07.21 | DONE | Not Needed | 13.07.21 | Mobile 3 | 14.07.21 | Cond. Accep. | 20.07.21 | R.Mahr | |
|
141
|
Mon Jul 12 13:46:30 2021 |
Cristina | test without bakeout | Experimental Chamber | 5.07.21 | | | 14.07.21 | DONE | | 15.07.21 | Customised | 22.07.21 | Cond. Accep. | 26.07.21 | Bömsch | |
|
142
|
Mon Jul 12 13:47:03 2021 |
Cristina | test without bakeout | Trafos for isolation vacuum-Piotr | | | | 02.07.21 | DONE | Not Needed | 07.07.21 | Mobile 3 | 12.07.21 | Refused | 19.08.21 | P. Kowina | |
|
143
|
Wed Jul 14 14:09:31 2021 |
Cristina | test with bakeout | Profil Gitter for HEBT | | | | 09.07.21 | DONE | Not Needed | 14.07.21 | Setup 1 | 19.07.21 | Cond. Accep. | | | |
|
144
|
Thu Aug 19 09:53:54 2021 |
Cristina | test with bakeout | MCP for ESR-Giacomini | | | | 05.08.21 | DONE | Not Needed | 11.08.21 | Setup 1 | 17.08.21 | | 17.08.21 | F. Wolf | |
|
145
|
Thu Aug 19 09:58:04 2021 |
Cristina | | Profil Gitter for HEBT | | | | | DONE | Not Needed | 14.07.21 | | 19.07.21 | Refused | | | |
|
146
|
Thu Aug 19 10:00:46 2021 |
Cristina | | BPM Kyocera (8 pieces) | 28.07.21 | | | 30.07.21 | DONE | Not Needed | 02.08.21 | Mobile 3 | 28.08.21 | Accepted | 31.08.21 | F.Wolf | |
|
147
|
Fri Aug 20 09:21:08 2021 |
Cristina | test with bakeout | Diagnostic chambers (2) | | | | 19.08.21 | DONE | Not Needed | 14.09.21 | Customised | 25.09.21 | Cond. Accep. | 02.11.2021 | M. Mueller | |
|
148
|
Wed Sep 15 10:29:42 2021 |
Cristina | test with bakeout | Al chamber | | | | | DONE | Not Needed | 02.09.21 | Mobile 3 | 13.09.21 | Accepted | 16.09.21 | N.Staldmann | |
|
149
|
Tue Sep 21 11:38:16 2021 |
Phe | test without bakeout | Kyocera ceramics - 4x | | On schedule | | 21.09.2021 | DONE | | 23.09.21 | Mobile 3 | 15.10.21 | Accepted | | | |
|
150
|
Tue Sep 28 11:55:07 2021 |
Cristina | test without bakeout | BPM with ceramic | | | | 12.09.21 | DONE | Not Needed | 14.09.21 | Mobile 3 | 16.09.21 | Refused | 28.09.21 | M.Müller | |
|
151
|
Wed Oct 20 11:25:04 2021 |
Phe | test without bakeout | BPM Chambers - 2x | | On schedule | | 20.10.2021 | DONE | Not Needed | 21.10.21 | | 27.10.21 | Cond. Accep. | 02.11.21 | M.Mueller | |
|
Draft
|
Tue Nov 2 09:06:05 2021 |
Phe | test without bakeout | Cecom chamber for FAT K2030-1123, 06004016122 | | On schedule | | | on-going | | | | | | | | |
|
153
|
Mon Nov 8 15:10:43 2021 |
Phe | test with bakeout | SIS100 bunch compressor with ceramic gap | | On schedule | | 08.11.2021 | DONE | Not Needed | 25.11.21 | Setup 1 | 01.12.21 | Accepted | | | |
|
154
|
Wed Nov 17 11:46:15 2021 |
Cristina | test with bakeout | Coated Al sheet metall bent (Brandau) | | | | 5.11.21 | DONE | Not Needed | 8.11.21 | Setup 1 | 15.11.21 | Cond. Accep. | 03.02.22 | R.Sanchez | |
|
155
|
Wed Nov 17 11:48:30 2021 |
Cristina | test without bakeout | Fluorescence chamber SIS100 | | | | 12.11.21 | DONE | Accepted | 17.11.21 | Mobile 3 | 18.11.21 | Accepted | | | |
|
156
|
Wed Nov 17 11:50:00 2021 |
Cristina | leak check | SIS100 bunch compressor | | | | 15.11.21 | DONE | Not Needed | 16.11.21 | Customised | 17.11.21 | Accepted | | | |
|
157
|
Wed Nov 17 11:51:00 2021 |
Cristina | test with bakeout | Second SIS100 injection Septa | | | | | DONE | Not Needed | 11.11.21 | Customised | 19.11.21 | Cond. Accep. | | | |
|
158
|
Thu Dec 2 11:08:38 2021 |
Cristina | test without bakeout | BPM | | | | 30.11.21 | DONE | Not Needed | 02.12.21 | Mobile 3 | 06.12.21 | Accepted | 23.02.22 | M.Müller | |
|
159
|
Thu Dec 9 11:41:47 2021 |
Cristina | test with bakeout | Tube with ceramic gap- resistence study | | | | 03.12.21 | DONE | Not Needed | 06.12.21 | Setup 1 | 09.12.21 | | Dec 21 | | |
|
160
|
Thu Dec 9 11:42:50 2021 |
Cristina | test without bakeout | BPM | | | | 07.12.21 | DONE | Not Needed | 09.12.21 | Mobile 3 | 13.12.21 | Cond. Accep. | 17.12.21 | Müller | |
|
161
|
Wed Jan 12 08:40:00 2022 |
Cristina | | Windows for ESR | | | | 10.01.22 | DONE | Not Needed | 13.01.22 | Setup 2 | 21.10.22 | Cond. Accep. | 03.02.22 | R.Sanchez | |
|
162
|
Wed Jan 12 08:40:41 2022 |
Cristina | | XHU detector ESR | | | | 16.12.21 | DONE | Not Needed | 12.01.22 | Setup 1 | 26.01.22 | Cond. Accep. | 24.02.22 | D.Winters | |
|
163
|
Tue Jan 18 08:50:13 2022 |
Cristina | test with bakeout | Mirror chamber ESR (Brandau) | | | | 16.01.22 | DONE | Not Needed | 17.01.22 | Customised | 31.01.22 | Cond. Accep. | 31.01.22 | ESR | |
|
164
|
Tue Jan 18 08:51:15 2022 |
Cristina | test without bakeout | Grids for pLinac (Siebert) | 07.01.22 | | | 17.01.22 | DONE | Not Needed | 19.01.22 | HEBT Setup | 31.01.22 | Cond. Accep. | 31.01.22 | T.Sieber | |
|
165
|
Wed Feb 9 14:19:51 2022 |
Cristina | test without bakeout | CECOM chamber | | | | KW5 | DONE | Not Needed | 08.02.2022 | Customised | 09.02.22 | Accepted | | M.Müller | |
|
166
|
Tue Feb 15 09:56:13 2022 |
Cristina | test without bakeout | NTG chamber HEBT special installation | | | | 03.02.22 | DONE | Not Needed | 10.02.22 | Customised | 14.02.22 | Cond. Accep. | 25.06.22 | S.Zeller | |
|
167
|
Fri Feb 25 09:36:32 2022 |
Cristina | test with bakeout | Grid+manipolator | | | | KW7 | DONE | | 23.02.22 | Setup 1 | 11.03.22 | Accepted | | | |
|
168
|
Fri Feb 25 09:37:36 2022 |
Cristina | test without bakeout | 2 BMP | | | | 23.02.22 | DONE | | 28.02.22 | Mobile 3 | 04.03.22 | Accepted | 04.03.22 | M.Müller | |
|
169
|
Tue Mar 15 14:06:51 2022 |
Cristina | | Indian diagnostic chamber | | | | 11.03.22 | DONE | Not Needed | 15.03.22 | Customised | 16.03.22 | Accepted | | | |
|
170
|
Tue Mar 22 11:27:51 2022 |
Cristina | test with bakeout | SIS100 Qpole | | | | | on-going | Not Needed | 22.03.22 | Customised | | | | | |
|
171
|
Mon Mar 28 11:50:59 2022 |
Cristina | test without bakeout | Missing dipole | | | | 28.03.22 | TO DO | | | | | | | | |
|