Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, all entries  Not logged in ELOG logo
Entry  Mon Sep 30 11:04:15 2019, Cristina, leak check, Cryo collimator 11-1-18-8, , , , 24.09.2019, DONE, Accepted, 25.09.2019, Customised, 25.09.2019, Accepted, 26.09.2019, L. Bozyk 
Entry  Mon Sep 30 11:11:26 2019, Cristina, test with bakeout, Laser chamber -Winters, Beginning 2019, Delayed, , 16.08.2019, DONE, Accepted, 30.08.2019, Customised, 12.02.2020, Accepted, KW10, D.Winters Laser_chamber.jpg
Entry  Mon Sep 30 11:15:47 2019, Cristina , test with bakeout, Detector Recoil chamber ESR, , , , 2.09.2019, DONE, Accepted, 9.09.2019, Customised, 29.10.2019, Cond. Accep., 1.11.19, Hillenbrand Recoil_ESR_chamber.jpg
Entry  Mon Sep 30 14:00:51 2019, Cristina, pumping speed, 800 l/s Agilent, , , , 20.09.2019, DONE, Accepted, 1Test:7.10.2019; 2Test: 14.11.2019, Fischer-Mommsen, 1.11.19, Cond. Accep., , Sent back to Agilent 
Entry  Mon Sep 30 14:04:43 2019, Cristina, pumping speed, Combi pump DN40, , , , 09.08.2019, DONE, Accepted, 20.08.2019, Fischer-Mommsen, 20.09.2019, Accepted, , Sent back to Agilent Agilent_combi_DN40.jpg
Entry  Mon Sep 30 14:06:07 2019, Cristina, pumping speed, Slim SIP 150, , , , 9.08.2019, DONE, Accepted, 07.02.2020, Fischer-Mommsen, 06.03.2020, Accepted, ,  Comparison.jpg
Entry  Wed Oct 9 07:55:47 2019, Phe, leak check, All metal gate valve (Bender), , , , 08.10.2019, DONE, Accepted, 21.10.2019, Customised, 24.10.2019, Accepted, 24.10.2019, M.Bender All_metal_valve.jpg
Entry  Wed Oct 9 07:57:44 2019, Phe, test with bakeout, Cryring Detector Tube , , , , 09.10.2019, DONE, Accepted, 10.10.2019, Setup 1, 22.10.2019, Accepted, 24.10.2019, Spillmann 20191008_094940.jpg
Entry  Wed Oct 9 08:01:51 2019, Phe, test with bakeout, Macor Samples from Tino Giacomini, , , , 02.10.2019, DONE, Accepted, 10.10.2019, Mobile 2, 6.11.19, Accepted, 8.11.19, Giacomini 
Entry  Wed Oct 9 14:19:09 2019, Phe, test with bakeout, Scrapper for ESR (for Markus Steck), , , , 09.10.2019, DONE, Accepted, 14.10.2019, Setup 2, 18.10.2019, Accepted, 24.10.2019, Schwarz ESR-Scraper.jpg
Entry  Mon Oct 14 10:08:14 2019, Cristina, leak check, Dipole chamber SIS100 First charge, , , , 10.10.2019, DONE, Accepted, 11.10.2019, Customised, 29.11.2019, Accepted, , Stored in the TH 
Entry  Mon Oct 14 10:09:36 2019, Cristina, leak check, Roughing CWT 3 charge, , , , 10.10.2019, DONE, Accepted, 14.10.2019, Customised, 14.11.19, Accepted, , Stored in Weiterstadt CWT.jpg
Entry  Wed Oct 16 08:24:29 2019, Toni, leak check, Kryokollimator , June 2019, Delayed, August, from September 2019, DONE, Not Needed, 02.09.2019, Customised, 09.12.2020, Accepted, ,  criocollimator.jpg
Entry  Mon Oct 21 10:24:59 2019, Cristina, Other, Tube Heidelberg, , , , 17.10.2019, DONE, Accepted, First Test: 24.10.2019; Second Test:30.01.20 , Horizontal Coating Setup, 29.10.2019: Refused; Second Test: 05.02.2020, Accepted, 11.02.2020, C.Schröter HD_tube.jpg
Entry  Thu Oct 24 14:55:28 2019, Toni, , , , , , , , , , , , , ,  
Entry  Thu Oct 24 14:58:25 2019, Toni, , , , , , , , , , , , , ,  
Entry  Fri Nov 1 10:41:45 2019, Cristina, test with bakeout, IPM Chamber, , , , 4.09.2019, DONE, Refused, , , , Refused, 1.11.19, Angelo 
Entry  Fri Nov 8 10:52:43 2019, Cristina, test with bakeout, Macor 2 for IPM, , , , 8.11.19, DONE, Accepted, 11.11.2019, Mobile 2, 18.11.2019, Accepted, 04.12.19, T. Giacomini 
Entry  Mon Nov 11 08:06:09 2019, Phe, test without bakeout, Ref. Chamber for Beam Diagnostic Manipulator (Hackhalle), , , , unknown, DONE, Accepted, 11.11.2019; 10:15 am, stopped 12.11.2019, Customised, , Refused, ,  
Entry  Thu Nov 14 14:00:28 2019, Phe, test without bakeout, Ref. Chamber for Beam Diagnostic Manipulator, , , , unknown, DONE, Accepted, 14.11.2019; 10:30 am, Customised, 22.11.2019, Cond. Accep., N/A, N/A 
Entry  Fri Nov 22 11:07:36 2019, Phe, test without bakeout, Beam Diagnostic Chambers from India for HEBT - small one, , , , unknown, DONE, Refused, 09.01.2020, Customised, 10.01.2020 - still pumping, Accepted, 15.01.20, Mahr Rainer 
Entry  Fri Nov 22 11:08:19 2019, Phe, test with bakeout, SEM-Monitor for Beam Diagnostic SIS18, , , , 02.12.2019, DONE, Accepted, 03.12.2019, Setup 2, 13.12.2019, Cond. Accep., 06.01.2020, Fiedler, Sebastian foto.jpg
Entry  Fri Nov 22 11:09:19 2019, Phe, test with bakeout, Grid for Beam Diagnostic SIS18, , , , 02.12.2019, DONE, Accepted, 03.12.2019, Setup 1, 13.12.2019, Cond. Accep., 06.01.2020, Fiedler, Sebastian 
Entry  Fri Nov 22 11:09:59 2019, Phe, Other, Septum SIS100 - NEG coated chamber, End 2019, Delayed, , unknown, TO COME, , , , , , ,  
Entry  Fri Nov 22 11:10:33 2019, Phe, test with bakeout, Dipole Chambers for SIS100 (2box), 25.11.19, Delayed, Unknown, 17.01.20, DONE, Accepted, 12.02.2020, , End februar, Accepted, ,  
Entry  Fri Nov 22 11:11:00 2019, Phe, test with bakeout, Quad Chambers for SIS100, , , , unknown, TO COME, , , , , , ,  
Entry  Fri Nov 22 11:11:24 2019, Phe, leak check, 4th batch of roughing CWT for SIS100, , , , 06.01.20, DONE, Accepted, 10.02.2020, Customised, 13.03.20, Accepted, , Stored in Weiterstadt 
Entry  Fri Nov 22 11:11:56 2019, Phe, test with bakeout, 'Spill-Cavitaet" ???, August 2019, Delayed, KW26, , TO COME, , , , , , ,  
Entry  Thu Nov 28 11:09:29 2019, Cristina, test with bakeout, Reference chamber for Grid for beam diagnostic SIS18, , , , 06.01.2020, DONE, Not Needed, 09.01.2020; , Setup 1, 19.01.20, Accepted, ----------, ---------- 
Entry  Thu Nov 28 11:11:16 2019, Cristina, test with bakeout, Reference chamber for Monitor for beam diagnostic, , , , 09.01.2020, on-going, Not Needed, 08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 am, Setup 2, , , ,  
Entry  Mon Dec 2 14:28:58 2019, Cristina, General, TS1MU1-test with magnet, August 2019 delayed to KW6 2020, Delayed, Unkwon, N/A, DONE, Accepted, 04.03.2020, Customised, , Accepted, , Grossmontage 
Entry  Wed Dec 4 10:08:42 2019, Cristina, test with bakeout, Macor 3 charge, , , , 04.12.19, DONE, Accepted, 11.02.2020, Customised, 20.03.2020, Cond. Accep., 23.03.2020, T. Giacomini 
Entry  Thu Dec 12 09:20:54 2019, Cristina, test with bakeout, IPM SIS100-Giacomini, Jannuary 2020, Delayed, Unknown, 21.04.2020, DONE, Not Needed, 04.05.2020, Customised, 15.05.2020, Accepted, Mai/Juni, Brough to the TH 
Entry  Thu Dec 12 09:22:19 2019, Cristina, test without bakeout, Palmer PU Tank- Dimopoulou, January 2020, on schedule, January 2020, January 2020, DONE, Accepted, 28.01.20, Customised, 31.01.20, Accepted, 03.02.20, Grossmontage 
Entry  Thu Dec 12 10:19:06 2019, Cristina, test with bakeout, Pumping chamber SIS100 -Stefan, End 2019, Delayed, Beginning2020, 10.12.19, DONE, Accepted, January, Customised, 05.02.2020, Accepted, , Stored in the TH 
Entry  Fri Dec 13 09:03:27 2019, Christian, leak check, Fasersonde Unilac, , , , 12.12.19, DONE, Accepted, 12.12.19, Customised, 16.12.19, Refused, 16.12.19, Sthraldiagnose 
Entry  Mon Dec 16 15:27:50 2019, Phe, test without bakeout, Beam Diagnostic from Inida - big one, , , , 13.13.2019 , DONE, Refused, 15.01.20, Customised, 19.01.20, Accepted, 24.01.201, M.Müller 
Entry  Tue Dec 17 13:39:20 2019, Phe, leak check, Fasersonde Unilac -2 test, , , , 17.12.2019, DONE, Not Needed, 17.12.2019, Customised, 17.12.2019, Accepted, 20.12.2019, Beam diagnostic 20191217_134243.jpg
Entry  Wed Dec 18 11:27:54 2019, Phe, leak check, Transistion tube for SIS100 string test, Beginning 2020, Delayed, February, 06.02.2020, DONE, Refused, , , , Refused, ,  
Entry  Thu Jan 16 09:05:12 2020, Cristina, test without bakeout, BPM SIS100- 2010-3, 27.01.20, Delayed, 30.01.20, 30.01.20, DONE, Accepted, 03.02.2020, Customised, 05.02.2020, Refused, 10.02.2020, M.Müller 
Entry  Mon Jan 20 10:40:00 2020, Cristina, test with bakeout, Ceramic Tube Diagnostic-Dorn 06-004-01376-3, KW4, On schedule, KW4, 20.01.20, DONE, Accepted, 21.01.2020, Setup 1, 27.01.20, Accepted, 29.01.20, M.Müller 
Entry  Thu Feb 6 10:33:17 2020, Cristina, test without bakeout, BPM 2010-17 (keept in the new cryostat), KW7, On schedule, KW7, 10.02.2020, DONE, Accepted, 12.02.2020, Mobile 3, 14.02.2020, Refused, 18.02.2020, M.Müller 
Entry  Thu Feb 6 10:34:00 2020, Cristina, test without bakeout, BPM 2010-15 (from the Company), KW8, On schedule, KW8, 18.02.2020, DONE, Refused, 19.02.2020, Mobile 3, 21.02.2020, Cond. Accep., 25.02.2020, M.Müller 
Entry  Thu Feb 6 10:34:25 2020, Cristina, test without bakeout, BPM 2010-16 (keep in the old cryostat), KW9, On schedule, KW9, 26.02.2020, DONE, Refused, 26.02.2020, Mobile 3, 28.02.2020, Cond. Accep., 27.02.2020, Müller 
Entry  Thu Feb 6 11:11:21 2020, Cristina, General, In kind contribution Sweden -Niko, March 2020, On schedule, , , , , , , , , ,  
Entry  Thu Feb 6 12:45:52 2020, Cristina, test without bakeout, Protoype BV CWT, March, On schedule, , 26.08.20, DONE, Not Needed, 14.09.20, Customised, 21.09.20, Accepted, 22.09.20, S. Wilfert 
Entry  Thu Feb 6 12:47:18 2020, Cristina, leak check, Interconnction bellows between Dipole and Quadrupole, October , On schedule, , 3.11.20, DONE, Accepted, 04.11.20, Customised, 04.11.20, Refused, 04.11.20, in Büro of S.Wilfert 
Entry  Thu Feb 6 12:48:46 2020, Cristina, leak check, 30 SIS 100 pumping chambers, May 20, Delayed, December 20, , , , , , , , ,  
Entry  Tue Feb 11 09:53:14 2020, Cristina, leak check, SIS100 Sextupole (6), September 2020, Delayed, , , , , , , , , ,  
Entry  Tue Feb 11 09:54:49 2020, Cristina, test with bakeout, SIS100 Injection Kicker , September 2020, Delayed, , , , , , , , , ,  
Entry  Tue Feb 11 09:57:17 2020, Cristina, test with bakeout, SIS100 diagnostic chambers, June 2020, Delayed, , 17.11.2020, DONE, Not Needed, 17.11.20, Customised, 25.11.20, Cond. Accep., 01.12.20, Grossmontage 
Entry  Tue Feb 11 09:59:48 2020, Cristina, leak check, SIS100 Quadrupole chambers, March 2020, Delayed, September 20, September 20, DONE, Accepted, 30.09.20, HEBT Setup, 06.10.20, Accepted, 8.10.20, I.Pongrac 
Entry  Fri Feb 14 13:34:54 2020, Cristina, test with bakeout, Berrilium Copper Stripes Dermati, 14.02.2020, On schedule, 14.02.2020, 14.02.2020, DONE, Not Needed, 17.02.2020; 11:30 am, Setup 1, 24.02.2020, Cond. Accep., 26.02.2020, Bardonner 
Entry  Wed Feb 19 11:42:59 2020, Cristina, pumping speed, TMP Cryring (Nikita), KW8, On schedule, KW8, 19.02.2020, DONE, Refused, 9.03.2020, Fischer-Mommsen, 16.03.2020, Accepted, 29.05.2020, Nikita pumpingspeed.jpg
Entry  Tue Mar 3 09:34:40 2020, Cristina, Coating, SPARC chambers , June 2019, Delayed, Febraury 2020, 12.02.2020, DONE, Accepted, 01.09.2020, Horizontal Coating Setup, 03.11.20, Accepted, 10.12.20, Track to Jülich 
Entry  Tue Mar 3 09:58:03 2020, Cristina, test with bakeout, Ferrite RI (as received), 15.March, On schedule, , 20.03.2020, DONE, Not Needed, 23.03.2020, Setup 1, 27.03.2020, Cond. Accep., --------, --------- 
Entry  Tue Mar 3 13:50:28 2020, Cristina, test with bakeout, Macor 4 -IPM Giacomini, KW10, On schedule, , 03.03.2020, DONE, Not Needed, 18.03.2020; 07:45 am, Mobile 2, 27.03.2020, Cond. Accep., 11.05.2020, T. Giacomini 
Entry  Wed Mar 4 10:06:09 2020, Phe, leak check, Transistion tube for SIS100 string test_Second test, Beginning 2020, Delayed, February, End of February, DONE, Accepted, 03.03.2020, Customised, 03.03.2020, Accepted, 5.03.2020, Ivan and Stefan (for integration @BNG) IMG-20200304-WA0001.jpg
Entry  Mon Mar 9 08:46:22 2020, Phe, test without bakeout, BPM SIS100 2010-3, repeat after long pumping @ Hackhalle, , On schedule, , 06.03.2020, DONE, Accepted, 09.03.2020; 07:00 am, Mobile 3, 10.03.2020, Accepted, 12.03.2020, M.Müller 
Entry  Thu Mar 12 13:47:38 2020, Phe, test without bakeout, BPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic), Received , On schedule, , 12.03.2020, DONE, Not Needed, 12.03.2020; 11:55 am, Mobile 3, 17.03.2020; 11:00 am, Accepted, 19.03.2020, M.Müller 
Entry  Thu Mar 12 13:49:09 2020, Phe, test without bakeout, BPM SIS100 2010-17 (ceramic only), Received, On schedule, , 12.03.2020, DONE, Not Needed, 18.03.2020; 08:25, Setup 1, 19.03.2020; 11:00, Cond. Accep., 19.03.2020, M.Müller 
Entry  Thu Mar 19 11:23:38 2020, Phe, test without bakeout, BPM SIS100 2010-15 (after cryo), , On schedule, , 19.03.2020, DONE, Not Needed, 19.03.2020; 15:00, Mobile 3, 25.03.2020, Cond. Accep., 26.03.2020, M.Müller 
Entry  Wed Mar 25 14:22:40 2020, Phe, test without bakeout, Broken ceramic for BPM, , On schedule, , 25.03.2020, DONE, Not Needed, 26.03.2020, Setup 2, 27.03.2020, Cond. Accep., 28.03.2020, M.Müller 
Entry  Mon Apr 6 15:33:45 2020, Phe, test with bakeout, Unbaked Ferrites from RI (bigger size), , On schedule, , 06.04.2020, DONE, Not Needed, , Setup 1, 22.04.2020, Cond. Accep., ,  
Entry  Wed Apr 22 08:35:13 2020, Phe, test without bakeout, BPM 2010-15 - 2 weeks pump down in Hackhalle, , On schedule, , 21.04.2020, DONE, Not Needed, 21.04.2020; 17:00, Mobile 3, 24.04.2020, Accepted, 23.04.20, M.Müller 
Entry  Wed Apr 22 10:14:43 2020, Cristina, test with bakeout, Ceramic Tube for Cryring (Sieber, KW13, Delayed, 22.04.2020, 24.04.2020, DONE, Not Needed, 27.04.2020, Setup 2, 06.05.2020, Refused, 8.05.2020, T.Sieber 
Entry  Wed Apr 22 13:45:53 2020, Cristina, test without bakeout, p-linac dipoles, 20.04.2020, On schedule, , 20.04.2020, DONE, Accepted, 21.04.2020, HEBT Setup, 29.04.2020, Cond. Accep., 27.05.2020, Florian (Grossmontage) 
Entry  Fri Apr 24 09:56:27 2020, Cristina, test with bakeout, Be windows-Spillman, KW18, On schedule, , 28.04.2020, DONE, Not Needed, 26.05.2020, Setup 2, MEASUREMENTS STOPPED, , 02.10.20, Collegue Spillman 
Entry  Wed May 13 15:26:53 2020, Phe, test with bakeout, Big Baked Ferrites PLT 90/50/30 8C11 and Small baked Ferrites CMD5005, , On schedule, , 11.05.2020, DONE, Not Needed, 13.05.2020; 7:40 am, Setup 1, 25.05.2020, Cond. Accep., ---------, ----------- 
Entry  Tue May 19 09:20:24 2020, Cristina, test with bakeout, Ceramic parts Hillenbrand, 25.05.20, On schedule, , 25.05.2020, DONE, Accepted, 26.05.2020, Setup 1, 30.05.2020, Accepted, 09.06.2020, Hillenbrand 
Entry  Tue May 19 12:03:40 2020, Phe, Problem, Turbo Pump from Thomas Seiber, , On schedule, , KW19, DONE, Not Needed, 19.05.2020, Customised, 20.05.2020, Refused, 27.05.2020, Student from T.Sieber pump_Sieber.jpg
Entry  Wed May 27 10:34:37 2020, Phe, test without bakeout, BPM SIS100 X2010-16, , , , KW21, DONE, Not Needed, 20.05.2020, Customised, 22.05.2020, Cond. Accep., 26.08.20, M.Müller 
Entry  Wed Jun 17 10:13:57 2020, Cristina, test with bakeout, IPM SIS18, End May, On schedule, , End May (the gewind had to be redone by Pfeiffer), DONE, Accepted, 17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20, Customised, 31.08.20, Cond. Accep., 04.09.2020, Back to Tino G. 
Entry  Wed Jun 17 12:58:02 2020, Cristina, test without bakeout, SIS100 Dipole 07-6-016-4, ----, , ------, 17.06.2020, DONE, Accepted, 17.06.2020, HEBT Setup, 19.06.2020, Cond. Accep., 22.06.2020, brought back to the TH 
Entry  Fri Aug 28 11:51:30 2020, Phe, test without bakeout, SIS100 dipole 07-00009-020-01, , , , , DONE, Accepted, 26.08.20, HEBT Setup, 28.08.20, Refused, 1.09.20, in the TH 
Entry  Fri Aug 28 11:52:43 2020, Phe, test without bakeout, BPM SIS100 2010-61, , , , 26.08.20, DONE, Accepted, 26.08.20, Mobile 3, 28.08.20, Cond. Accep., 09.09.20, S. Fiedler 
Entry  Fri Sep 11 09:56:40 2020, Cristina, test without bakeout, BPM SIS100 X2010-63, , , , , DONE, Accepted, 31.08.2020, Mobile 3, 01.09.20, Accepted, 09.09.20, S. Fiedler 
Entry  Fri Sep 11 09:59:20 2020, Cristina, test without bakeout, Bellows IPM SIS18, , , , 01.09.2020, DONE, Refused, 02.09.2020, HEBT Setup, 03.09.2020, Refused, 11.09.2020, Zentrale Dienst (back to Giacomini) 
Entry  Fri Sep 11 10:07:46 2020, Cristina, test with bakeout, Nuts company TwinNut, , , , , DONE, Accepted, 01.09.2020, Mobile 2, 10.09.2020, Accepted, ------, -------- 
Entry  Fri Sep 11 10:13:59 2020, Cristina, test without bakeout, Cecom diagnostic chamber HEBT, , , , 01.09.2020, DONE, Accepted, 02.09.2020, Setup 1, 04.09.2020, Cond. Accep., 23.09.20, M.Müller 
Entry  Mon Sep 14 09:15:03 2020, Cristina, test without bakeout, BPM SIS100 2010-17, , , , 09.09.20, DONE, Accepted, 09.09.2020, Mobile 3, 10.09.2020, Cond. Accep., 17.09.2020, M. Müller 
Entry  Mon Sep 14 09:16:54 2020, Cristina, test with bakeout, Mirror Laser cooling SIS100, , , , 14.09.2020, DONE, Accepted, 6.10.20, Mobile 2, 21.10.20, Cond. Accep., KW47, D.Winters 
Entry  Mon Sep 14 10:38:59 2020, Cristina, test without bakeout, Test on Viton gasket, , , , 14.09.2020, TO DO, Not Needed, , , , , ,  
Entry  Tue Sep 15 11:14:44 2020, Cristina, leak check, SIS100 Dipole chambers, , , , , on-going, , July 2019, Customised, , , ,  
Entry  Mon Sep 21 11:31:47 2020, Cristina, test without bakeout, HEBT BPM, KW39, On schedule, , 28.09.20, on-going, Accepted, 05.10.20. Test started again: 08.12.20, Mobile 3, , Refused, ,  
Entry  Mon Sep 21 11:32:46 2020, Cristina, test with bakeout, Ferrite RI after firing, , , , 18.09.20, DONE, Accepted, 22.09.2020, Setup 1, 1.10.20, Accepted, ---------, --------- 
Entry  Mon Sep 21 11:39:27 2020, Cristina, test without bakeout, Steel with epoxy glue, August 20, Delayed, , 21.09.20, DONE, , 22.09.2020, , 03.10.20, Refused, ?, ? 
Entry  Mon Sep 21 14:26:53 2020, Cristina, leak check, Beam line CWT, , , , 21.08.20, , , 21.09.20, Customised, 23.09.2020, Accepted, 24.09.20, S.Wilfert 
Entry  Wed Sep 30 13:39:48 2020, Cristina, test with bakeout, Tube CCC Cryring, , , , 30.09.2020, DONE, Accepted, 5.10.20, Setup 1, 07.10.20, Accepted, 8.10.20, T. Sieber 
Entry  Tue Oct 13 07:54:31 2020, Phe, test without bakeout, Epoxy - baked in the oven @ 80 deg C, 09.10.2020, On schedule, , 09.10.2020, DONE, Not Needed, 22.10.20, Mobile 2, 29.10.20, Refused, ,  
Entry  Wed Oct 21 10:51:47 2020, Cristina, test with bakeout, IPM SIS18 mit diagnostic parts, , , , 25.09.2020, DONE, Refused, 20.10.20, , 29.10.20, Cond. Accep., 2.11.20, Grossmontage 
Entry  Tue Nov 3 09:55:20 2020, Cristina, test with bakeout, MCPs for IPM SIS18, September, Delayed, , 2.11.20, DONE, Accepted, 2.11.20, Setup 1, 09.11.2020, Cond. Accep., 10.11.2020, T.Giacomini 
Entry  Tue Nov 17 09:43:55 2020, Cristina, test without bakeout, BPM 2010-16, , , , ?, DONE, Accepted, 16.11.20, Mobile 3, 17.11.20, Cond. Accep., 01.12.20, Grossmontage 
Entry  Thu Nov 19 10:15:23 2020, Cristina, Coating, Parts for Cryring , , , , Beginning October 20, DONE, Accepted, 16.11.20, Horizontal Coating Setup, 17.11.20, Accepted, 26.11.20, David (Cryring) 
Entry  Thu Nov 19 10:17:06 2020, Cristina, Coating, Coating chamber Glorius, , , , 16.11.20, DONE, Accepted, 27.11.20, Horizontal Coating Setup, 3.12.20, Accepted, 14.12.20, Glorius 
Entry  Mon Nov 30 11:14:30 2020, Cristina, Coating, T-piece Cryring, Oct, , , KW48, DONE, Accepted, 26.11.20, Horizontal Coating Setup, 3.12.20, Accepted, 10.12.20, Nikita 
Entry  Mon Nov 30 11:15:48 2020, Cristina, test with bakeout, Antrieb for ESR-Beata, 1 Dec., Delayed, ?, 3.12.20, DONE, Not Needed, 3.12.20, Setup 1, 10.12.2020, Accepted, 11.12.20, Müller 
Entry  Mon Nov 30 11:17:49 2020, Cristina, leak check, 5 x SIS100 Diagnostic Chambers, KW 49, , , , DONE, Not Needed, 01.12.20, , 16.12.20, Accepted, ,  
Entry  Tue Dec 1 11:49:07 2020, Cristina, test with bakeout, Bellows IPM SIS18-Second measurement after cleaning, , , , 12.10.20, DONE, Not Needed, 12.10.20, HEBT Setup, 14.10.20, Accepted, 15.10.20, Zentrale Dienst  
Entry  Tue Jan 12 12:48:45 2021, Cristina, test without bakeout, HEBT BPM-Cleaned @Kyocera, Beginning 21, On schedule, , 12.01.21, DONE, Accepted, 12.01.21, Mobile 3, 14.01.21, Accepted, 19.01.21, M.Müller 
Entry  Wed Jan 20 11:48:54 2021, Cristina, test without bakeout, HEBT BPM cleaned @GSI, , , , 19.01.21, DONE, Accepted, 20.01.21, Mobile 3, 21.01.21, Refused, 24.02.21, M.Müller 
Entry  Fri Jan 29 11:50:13 2021, Cristina, General, Pillow seals SFRS, , , , 14.01.21, DONE, Accepted, 18.01.21, Customised, 26.02.21, Cond. Accep., 12.03.21, Cristos 
Entry  Fri Jan 29 11:52:53 2021, Cristina, pumping speed, NEG strips CRYRing, , , , End Dec 20, DONE, Accepted, 25.01.21, Fischer-Mommsen, 17.02.2021, Accepted, 02.03.21, Nikos 
Entry  Fri Jan 29 11:54:20 2021, Cristina, leak check, Gate Valve, , , , 14.01.21, DONE, Accepted, 28.01.21, Customised, 28.01.21, Refused, 29.01.21, A.Tauschwitz 
Entry  Fri Jan 29 11:55:45 2021, Cristina, General, Lower pressure of primary pumps, , , , Dec 20, DONE, Accepted, 18.01.21, Customised, 22.01.21, Accepted, -----, G.Savino 
Entry  Mon Feb 1 16:04:00 2021, Phe, test with bakeout, Antriebe SIS100, , On schedule, , 01.02.2021, DONE, , 02.02.2021, Setup 1, 10.02.2021, Accepted, 11.02.21, M.Müller 
Entry  Wed Feb 3 11:47:32 2021, Cristina, leak check, CARME vacuum chamber, Dec 2020, Delayed, , 02.02.2021, DONE, Accepted, 02.02.2021, Customised, 02.202.2021, Accepted, 03.02.2021, N.Petridis 
Entry  Wed Feb 3 11:50:09 2021, Cristina, test with bakeout, Detector Pockets for scintillators SIS18, , , , 02.02.2021, on-going, , 08.02.21, HEBT Setup, 11.03.21, Cond. Accep., 12.03.21, M.Müller 
Entry  Wed Feb 17 11:30:26 2021, Cristina, test without bakeout, CECOM diagnostic chamber, 1.02.21, , , 17.02.21, DONE, Accepted, 18.01.21, Customised, 19.02.21, Cond. Accep., ,  
Entry  Wed Feb 17 11:31:08 2021, Cristina, test without bakeout, SIS100 BPM, , , , 15.02.21, DONE, Accepted, 16.02.21, , 18.02.21, Accepted, 24.02.21, M.Müller 
Entry  Wed Feb 17 11:50:45 2021, Cristina, leak check, SIS100 HF Cavities, , , , 15.02.21, DONE, Accepted, 15.02.21, Customised, 16.02.21, Accepted, 17.02.21, In Weitestadt 
Entry  Fri Feb 19 08:39:57 2021, Cristina, , HEBT BPM cleaned @GSI-second measurement, , , , 10.02.21, DONE, Accepted, 10.02.21, Customised, 18.02.21, Accepted, 24.02.21, M.Müller 
Entry  Fri Feb 19 08:41:46 2021, Cristina, leak check, 2x Cryostats-Kujouharov, 1.02.21, , 11.02.21, 11.02.21, DONE, , 12.02.21, Customised, 02.03.21, Cond. Accep., 09.03.21, Kojouharov 
Entry  Wed Feb 24 13:50:25 2021, Cristina, leak check, Cavity for DALINAC, 22.02.21, Delayed, 01.03.21, 09.03.21, DONE, Not Needed, 10.03.21, Customised, 11.03.21, Cond. Accep., 18.03.21, Dmytriiev D. 
Entry  Wed Feb 24 13:51:01 2021, Cristina, test with bakeout, 3D printed tube per pLinac, 01.03.21, , , 08.03.21, DONE, Accepted, 16.03.21, Setup 1, 18.03.21, Accepted, 18.01.21, Büro Andreas 
Entry  Wed Mar 10 12:11:04 2021, Cristina, test with bakeout, Viewports DN100 ESR, , , , 16.02.21, on-going, Not Needed, 16.02.21, Setup 1, 16.03.21, Cond. Accep., 26.03.21, R.Sanchez 
Entry  Thu Mar 18 11:40:02 2021, Cristina, test with bakeout, SIS100/HEBT Manipulator C.Dorn, , , , 17.03.21, DONE, Not Needed, 18.03.21, Setup 1, 24.03.21, Accepted, 29.03.21, M.Müller 
Entry  Wed Apr 28 10:05:13 2021, Cristina, test without bakeout, SIS100 pumping chambers -after cleaning by the Company, , , , 23.04.21, on-going, Accepted, 26.04., Customised, 21.05.21, Cond. Accep., ,  
Entry  Wed Apr 28 10:21:27 2021, Cristina, test without bakeout, Cecom after cleaning, , , , 06.04.21, DONE, Not Needed, 06.04.21, Customised, 08.04.21, Accepted, 12.05.21, M.Müller 
Entry  Wed Apr 28 10:23:18 2021, Cristina, test without bakeout, 3Dprinting Copper coated sample, , , , 25.03.21, DONE, Not Needed, 25.03.21, , 26.03.21, Cond. Accep., ,  
Entry  Wed Apr 28 10:28:18 2021, Cristina, test without bakeout, Ceramic for SIS100 BPM, , , , 22.03.21, DONE, , 22.03.21, Mobile 3, 29.03.21, Accepted, , M.Müller 
Entry  Wed Apr 28 10:30:54 2021, Cristina, test with bakeout, HEBT Antrieb (in-kind Slovenia) 06-0050-39-54, , , , 23.04.21, DONE, Not Needed, 26.04.21, Setup 1, 03.05.21, Accepted, 06.05.21, M.Müller 
Entry  Tue May 18 10:50:26 2021, Cristina, test with bakeout, HEBT Antrieb 06-0050-036-40, , , , 06.05.21, DONE, Not Needed, 06.05.21, Setup 1, 12.05.21, Accepted, 17.05.21, M.Müller 
Entry  Tue May 18 14:10:04 2021, Cristina, test without bakeout, Trafos BPM, , , , 12.05.21, DONE, Not Needed, 18.05.21, Customised, 21.05.21, Refused, 07.06.21, M.Müller 
Entry  Tue May 18 14:11:08 2021, Cristina, test without bakeout, BPM CID: 06005002605, , , , 18.05.21, DONE, , 19.05.21, Mobile 3, 21.05.21, Cond. Accep., 07.06.21, M.Müller 
Entry  Fri May 21 13:29:15 2021, Cristina, test with bakeout, 2xDN63 windows for ESR , , , , 20.05.21, DONE, Not Needed, 18.05.21, Setup 1, 02.06.21, Accepted, 18.06.21, R.Sanchez 
Entry  Tue Jun 8 10:19:14 2021, Cristina, test without bakeout, Dipole Module, , , , 25.05.21, DONE, Not Needed, 25.05.21, Customised, 27.07.21, Cond. Accep., TH, F.Kaether 
Entry  Tue Jun 8 10:27:49 2021, Cristina, test with bakeout, Mirror system ESR-Brandau, 07.06.21, Delayed, , 21.06.21, DONE, Not Needed, 25.06.21, Mobile 2, 13.07.21, Cond. Accep., 24.09.21, Brandau 
Entry  Tue Jun 8 10:28:46 2021, Cristina, test with bakeout, Pockets for ESR, KW25, , , 21.06.21, DONE, Not Needed, 24.06.21, Setup 1, 12.07.21, Accepted, 19.07.21, Glorious 
Entry  Mon Jun 14 11:48:43 2021, Cristina, test with bakeout, Antrieb für SIS100, , , , 07.06.21, DONE, Not Needed, 14.06.21, Setup 1, 22.06.21, Accepted, 28.06.21, M.Müller 
Entry  Thu Jun 24 12:05:07 2021, Cristina, test with bakeout, Bearings for HEBT-foil-stripper -Zeller, KW26, , , 01.07.21, DONE, Not Needed, 14.07.21, Mobile 2, 05.08.21, Refused, ,  
Entry  Thu Jun 24 12:06:49 2021, Cristina, test with bakeout, Test for polymide coated sample- Fischer, , , , , DONE, , 2.07.21, HEBT Setup, 6.07.21, Cond. Accep., 8.07.21, L.Fischer 
Entry  Thu Jun 24 12:07:27 2021, Cristina, test with bakeout, Injection Septa SIS100, , , , 21.06.21, DONE, Not Needed, 23.06.21, Customised, 14.07.21, Cond. Accep., 19.07.21, Report sent to I.Pongrac (Component in TH) 
Entry  Mon Jul 12 13:45:55 2021, Cristina, test with bakeout, BPM SIS100, , , , 09.07.21, DONE, Not Needed, 13.07.21, Mobile 3, 14.07.21, Cond. Accep., 20.07.21, R.Mahr 
Entry  Mon Jul 12 13:46:30 2021, Cristina, test without bakeout, Experimental Chamber, 5.07.21, , , 14.07.21, DONE, , 15.07.21, Customised, 22.07.21, Cond. Accep., 26.07.21, Bömsch 
Entry  Mon Jul 12 13:47:03 2021, Cristina, test without bakeout, Trafos for isolation vacuum-Piotr, , , , 02.07.21, DONE, Not Needed, 07.07.21, Mobile 3, 12.07.21, Refused, 19.08.21, P. Kowina 
Entry  Wed Jul 14 14:09:31 2021, Cristina, test with bakeout, Profil Gitter for HEBT, , , , 09.07.21, DONE, Not Needed, 14.07.21, Setup 1, 19.07.21, Cond. Accep., ,  
Entry  Thu Aug 19 09:53:54 2021, Cristina, test with bakeout, MCP for ESR-Giacomini, , , , 05.08.21, DONE, Not Needed, 11.08.21, Setup 1, 17.08.21, , 17.08.21, F. Wolf 
Entry  Thu Aug 19 09:58:04 2021, Cristina, , Profil Gitter for HEBT, , , , , DONE, Not Needed, 14.07.21, , 19.07.21, Refused, ,  
Entry  Thu Aug 19 10:00:46 2021, Cristina, , BPM Kyocera (8 pieces), 28.07.21, , , 30.07.21, DONE, Not Needed, 02.08.21, Mobile 3, 28.08.21, Accepted, 31.08.21, F.Wolf 
Entry  Fri Aug 20 09:21:08 2021, Cristina, test with bakeout, Diagnostic chambers (2), , , , 19.08.21, DONE, Not Needed, 14.09.21, Customised, 25.09.21, Cond. Accep., 02.11.2021, M. Mueller 
Entry  Wed Sep 15 10:29:42 2021, Cristina, test with bakeout, Al chamber, , , , , DONE, Not Needed, 02.09.21, Mobile 3, 13.09.21, Accepted, 16.09.21, N.Staldmann 
Entry  Tue Sep 21 11:38:16 2021, Phe, test without bakeout, Kyocera ceramics - 4x, , On schedule, , 21.09.2021, DONE, , 23.09.21, Mobile 3, 15.10.21, Accepted, ,  
Entry  Tue Sep 28 11:55:07 2021, Cristina, test without bakeout, BPM with ceramic, , , , 12.09.21, DONE, Not Needed, 14.09.21, Mobile 3, 16.09.21, Refused, 28.09.21, M.Müller 
Entry  Wed Oct 20 11:25:04 2021, Phe, test without bakeout, BPM Chambers - 2x, , On schedule, , 20.10.2021, DONE, Not Needed, 21.10.21, , 27.10.21, Cond. Accep., 02.11.21, M.Mueller 
Entry  Tue Nov 2 09:06:05 2021, Phe, test without bakeout, Cecom chamber for FAT K2030-1123, 06004016122, , On schedule, , , on-going, , , , , , ,  
Entry  Mon Nov 8 15:10:43 2021, Phe, test with bakeout, SIS100 bunch compressor with ceramic gap, , On schedule, , 08.11.2021, DONE, Not Needed, 25.11.21, Setup 1, 01.12.21, Accepted, ,  
Entry  Wed Nov 17 11:46:15 2021, Cristina, test with bakeout, Coated Al sheet metall bent (Brandau), , , , 5.11.21, DONE, Not Needed, 8.11.21, Setup 1, 15.11.21, Cond. Accep., 03.02.22, R.Sanchez 
Entry  Wed Nov 17 11:48:30 2021, Cristina, test without bakeout, Fluorescence chamber SIS100, , , , 12.11.21, DONE, Accepted, 17.11.21, Mobile 3, 18.11.21, Accepted, ,  
Entry  Wed Nov 17 11:50:00 2021, Cristina, leak check, SIS100 bunch compressor, , , , 15.11.21, DONE, Not Needed, 16.11.21, Customised, 17.11.21, Accepted, ,  
Entry  Wed Nov 17 11:51:00 2021, Cristina, test with bakeout, Second SIS100 injection Septa , , , , , DONE, Not Needed, 11.11.21, Customised, 19.11.21, Cond. Accep., ,  
Entry  Thu Dec 2 11:08:38 2021, Cristina, test without bakeout, BPM, , , , 30.11.21, DONE, Not Needed, 02.12.21, Mobile 3, 06.12.21, Accepted, 23.02.22, M.Müller 
Entry  Thu Dec 9 11:41:47 2021, Cristina, test with bakeout, Tube with ceramic gap- resistence study, , , , 03.12.21, DONE, Not Needed, 06.12.21, Setup 1, 09.12.21, , Dec 21,  
Entry  Thu Dec 9 11:42:50 2021, Cristina, test without bakeout, BPM, , , , 07.12.21, DONE, Not Needed, 09.12.21, Mobile 3, 13.12.21, Cond. Accep., 17.12.21, Müller 
Entry  Wed Jan 12 08:40:00 2022, Cristina, , Windows for ESR, , , , 10.01.22, DONE, Not Needed, 13.01.22, Setup 2, 21.10.22, Cond. Accep., 03.02.22, R.Sanchez 
Entry  Wed Jan 12 08:40:41 2022, Cristina, , XHU detector ESR, , , , 16.12.21, DONE, Not Needed, 12.01.22, Setup 1, 26.01.22, Cond. Accep., 24.02.22, D.Winters 
Entry  Tue Jan 18 08:50:13 2022, Cristina, test with bakeout, Mirror chamber ESR (Brandau), , , , 16.01.22, DONE, Not Needed, 17.01.22, Customised, 31.01.22, Cond. Accep., 31.01.22, ESR 
Entry  Tue Jan 18 08:51:15 2022, Cristina, test without bakeout, Grids for pLinac (Siebert), 07.01.22, , , 17.01.22, DONE, Not Needed, 19.01.22, HEBT Setup, 31.01.22, Cond. Accep., 31.01.22, T.Sieber 
Entry  Wed Feb 9 14:19:51 2022, Cristina, test without bakeout, CECOM chamber, , , , KW5, DONE, Not Needed, 08.02.2022, Customised, 09.02.22, Accepted, , M.Müller 
Entry  Tue Feb 15 09:56:13 2022, Cristina, test without bakeout, NTG chamber HEBT special installation, , , , 03.02.22, DONE, Not Needed, 10.02.22, Customised, 14.02.22, Cond. Accep., 25.06.22, S.Zeller 
Entry  Fri Feb 25 09:36:32 2022, Cristina, test with bakeout, Grid+manipolator, , , , KW7, DONE, , 23.02.22, Setup 1, 11.03.22, Accepted, ,  
Entry  Fri Feb 25 09:37:36 2022, Cristina, test without bakeout, 2 BMP, , , , 23.02.22, DONE, , 28.02.22, Mobile 3, 04.03.22, Accepted, 04.03.22, M.Müller 
Entry  Tue Mar 15 14:06:51 2022, Cristina, , Indian diagnostic chamber, , , , 11.03.22, DONE, Not Needed, 15.03.22, Customised, 16.03.22, Accepted, ,  
Entry  Tue Mar 22 11:27:51 2022, Cristina, test with bakeout, SIS100 Qpole, , , , , on-going, Not Needed, 22.03.22, Customised, , , ,  
Entry  Mon Mar 28 11:50:59 2022, Cristina, test without bakeout, Missing dipole, , , , 28.03.22, TO DO, , , , , , ,  