  2   Mon Sep 30 11:04:15 2019 Cristinaleak checkCryo collimator 11-1-18-8   24.09.2019DONEAccepted25.09.2019Customised25.09.2019Accepted26.09.2019L. Bozyk
  3   Mon Sep 30 11:11:26 2019 Cristinatest with bakeoutLaser chamber -WintersBeginning 2019Delayed 16.08.2019DONEAccepted30.08.2019Customised12.02.2020AcceptedKW10D.Winters
The measurement was stopped because of the wrong heating jackets
Attachment 1: Laser_chamber.jpg
Laser_chamber.jpg
  4   Mon Sep 30 11:15:47 2019 Cristina test with bakeoutDetector Recoil chamber ESR   2.09.2019DONEAccepted9.09.2019Customised29.10.2019Cond. Accep.1.11.19Hillenbrand
The chamber was brought in the lab without heating jackets, which where shipped on the 17.10. Conditionally Accepted because the RGA after bakeout does not fulfil the requirements.
Attachment 1: Recoil_ESR_chamber.jpg
Recoil_ESR_chamber.jpg
  5   Mon Sep 30 14:00:51 2019 Cristinapumping speed800 l/s Agilent   20.09.2019DONEAccepted1Test:7.10.2019; 2Test: 14.11.2019Fischer-Mommsen1.11.19Cond. Accep. Sent back to Agilent
Pumping Speed measured a bit lower than stated
  6   Mon Sep 30 14:04:43 2019 Cristinapumping speedCombi pump DN40   09.08.2019DONEAccepted20.08.2019Fischer-Mommsen20.09.2019Accepted Sent back to Agilent
Attachment 1: Agilent_combi_DN40.jpg
Agilent_combi_DN40.jpg
  7   Mon Sep 30 14:06:07 2019 Cristinapumping speedSlim SIP 150   9.08.2019DONEAccepted07.02.2020Fischer-Mommsen06.03.2020Accepted  
Attachment 1: Comparison.jpg
Comparison.jpg
  8   Wed Oct 9 07:55:47 2019 Pheleak checkAll metal gate valve (Bender)   08.10.2019DONEAccepted21.10.2019Customised24.10.2019Accepted24.10.2019M.Bender
Leak check required by Markus Bender for a "all metal gate valve". The gate valve was received on the 08.10.2019. No deadline. The gate valve is on Edgar's desk - so Edgar can check it when he's back from holiday. 23.10.2019 Test DONE
Attachment 1: All_metal_valve.jpg
All_metal_valve.jpg
  9   Wed Oct 9 07:57:44 2019 Phetest with bakeoutCryring Detector Tube    09.10.2019DONEAccepted10.10.2019Setup 122.10.2019Accepted24.10.2019Spillmann
Detector tube has been received from Grossmontage (given to Andreas Kraemer). This Detector tube is for Cryring - measurement request from Dr. Uwe Spillmann. The Detector tube needs to have some additional components, which will be assembled by Alexander Borovik (from Giessen University). Email has been sent to Alexander Borovik and he might pick the Detector Tube on 09.010.2019. The Detector Tube is on Phe's desk. The detector tube has been picked up by Alexander Borovik (09.10.2019). The additional component has been assembled to the Detector tube (09.10.2019)
Attachment 1: 20191008_094940.jpg
20191008_094940.jpg
  10   Wed Oct 9 08:01:51 2019 Phetest with bakeoutMacor Samples from Tino Giacomini   02.10.2019DONEAccepted10.10.2019Mobile 26.11.19Accepted8.11.19Giacomini
Macor samples have been received from Tino Giacomini on the 02.10.2019. These Macor samples will be used for IPM chamber. The test request is a vacuum acceptance test with bake-out.
  11   Wed Oct 9 14:19:09 2019 Phetest with bakeoutScrapper for ESR (for Markus Steck)   09.10.2019DONEAccepted14.10.2019Setup 218.10.2019Accepted24.10.2019Schwarz
Measurements asked as "urgent" for ESR. This piece was already measured in 2014, and then stored in an unkwon place.
Attachment 1: ESR-Scraper.jpg
ESR-Scraper.jpg
  12   Mon Oct 14 10:08:14 2019 Cristinaleak checkDipole chamber SIS100 First charge   10.10.2019DONEAccepted11.10.2019Customised29.11.2019Accepted Stored in the TH
6 dipole received on the KW41. Integral leak check and 1 test without bakeout After the vacuum test the chambers must be inserted on the magnet: 1 chamber was not fitting easy into the magnet. It will go today (15.11.19) in the technology lab for mechanical measurements.
  13   Mon Oct 14 10:09:36 2019 Cristinaleak checkRoughing CWT 3 charge   10.10.2019DONEAccepted14.10.2019Customised14.11.19Accepted Stored in Weiterstadt
Integral leak check to be done for all CWT. DONE: 07-51-23-0; 07-51-26-1; 07-51-30-8; 07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6 (Black-orange spots visible);07-51-36-0; 07-51-37-7; 07-51-32-2; 07-51-14-8;07-51-35-3;07-51-18-6; 07-51-29-2; 07-51-34-6
Attachment 1: CWT.jpg
CWT.jpg
  14   Wed Oct 16 08:24:29 2019 Tonileak checkKryokollimator June 2019DelayedAugustfrom September 2019DONENot Needed02.09.2019Customised09.12.2020Accepted  
Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01; 11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9; 11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4; 11-1-17-1; 11-1-18-8; 11-1-20-1;11-1-25-6; 11-1-22-5;11-01-24-4;11-1-28-7;11-1-27-0;11-1-29-4;11-1-26-3;11-1-13-3;11-1-21-8;11-1-40-9; 11-1-39-3;11-1-30-0;11-1-19-5 (LEAK!!!); 11-1-33-1;11-1-23-2; 11-1-43-0;11-1-42-3; 11-1-37-9; 11-1-63-8; 11-1-57-7; 11-1-45-4; 11-1-49-2; 11-1-44-7; 11-1-58-4; 11-1-24-9;11-1-36-2; 11-1-31-7; 11-1-38-6; 11-1-55-3; 11-1-53-9; 11-1-32-4;11-1-50-8; 11-1-34-8; 11-1-61-4;11-1-65-2; 11-1-64-5; 11-1-60-7;11-1-62-1;11-1-66-9; 11-1-51-5;11-1-59-1; 11-1-35-5; 11-1-52-2;11-1-48-5; 11-1-41-6; 11-1-46-1; 11-1-56-0; 11-1-54-6
Attachment 1: criocollimator.jpg
criocollimator.jpg
  15   Mon Oct 21 10:24:59 2019 CristinaOtherTube Heidelberg   17.10.2019DONEAcceptedFirst Test: 24.10.2019; Second Test:30.01.20 Horizontal Coating Setup29.10.2019: Refused; Second Test: 05.02.2020Accepted11.02.2020C.Schröter
Tube to be coated for HD. After the first coating: PEELING. STOP and waiting for the nextstep to be decided in HD. We cleaning the tubes many times, to try to remove all the film, and then we performes succesfully the second coating.
Attachment 1: HD_tube.jpg
HD_tube.jpg
  Draft   Thu Oct 24 14:55:28 2019 Toni              
  Draft   Thu Oct 24 14:58:25 2019 Toni              
  18   Fri Nov 1 10:41:45 2019 Cristinatest with bakeoutIPM Chamber   4.09.2019DONERefused   Refused1.11.19Angelo
Bellows to short
  19   Fri Nov 8 10:52:43 2019 Cristinatest with bakeoutMacor 2 for IPM   8.11.19DONEAccepted11.11.2019Mobile 218.11.2019Accepted04.12.19T. Giacomini
  20   Mon Nov 11 08:06:09 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator (Hackhalle)   unknownDONEAccepted11.11.2019; 10:15 am, stopped 12.11.2019Customised Refused  
Broken gauge (cold cathode gauge).
  21   Thu Nov 14 14:00:28 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator   unknownDONEAccepted14.11.2019; 10:30 amCustomised22.11.2019Cond. Accep.N/AN/A
Wide range gauge is now installed on the chamber. The previous test with cold cathode gauge failed due to broken gauge. Another complete new gauge is now installed on the chamber.
  22   Fri Nov 22 11:07:36 2019 Phetest without bakeoutBeam Diagnostic Chambers from India for HEBT - small one   unknownDONERefused09.01.2020Customised10.01.2020 - still pumpingAccepted15.01.20Mahr Rainer
Inside of the chamber is dirty (black mark when wiped with tissue). At the moment (16.12.2019), the chamber is under cleaning. Chamber has been cleaned on the 18.12.2019, stored in the Testing Halle. Vacuum acceptance test on the chamber - started on the 09.01.2020.
  23   Fri Nov 22 11:08:19 2019 Phetest with bakeoutSEM-Monitor for Beam Diagnostic SIS18   02.12.2019DONEAccepted03.12.2019Setup 213.12.2019Cond. Accep.06.01.2020Fiedler, Sebastian
Attachment 1: foto.jpg
foto.jpg
  24   Fri Nov 22 11:09:19 2019 Phetest with bakeoutGrid for Beam Diagnostic SIS18   02.12.2019DONEAccepted03.12.2019Setup 113.12.2019Cond. Accep.06.01.2020Fiedler, Sebastian
  25   Fri Nov 22 11:09:59 2019 PheOtherSeptum SIS100 - NEG coated chamberEnd 2019Delayed unknownTO COME       
  26   Fri Nov 22 11:10:33 2019 Phetest with bakeoutDipole Chambers for SIS100 (2box)25.11.19DelayedUnknown17.01.20DONEAccepted12.02.2020 End februarAccepted  
All chambers are inserted with success into the magnet. Leak check for: 07-6-013-3; 07-6-009-6; 07-6-011-9
  Draft   Fri Nov 22 11:11:00 2019 Phetest with bakeoutQuad Chambers for SIS100   unknownTO COME       
  28   Fri Nov 22 11:11:24 2019 Pheleak check4th batch of roughing CWT for SIS100   06.01.20DONEAccepted10.02.2020Customised13.03.20Accepted Stored in Weiterstadt
07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9; 07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1; 07-51-48-3; 07-51-40-7; 07-51-49-0;07-51-45-2; 07-51-46-9
  29   Fri Nov 22 11:11:56 2019 Phetest with bakeout'Spill-Cavitaet" ???August 2019DelayedKW26 TO COME       
  30   Thu Nov 28 11:09:29 2019 Cristinatest with bakeoutReference chamber for Grid for beam diagnostic SIS18   06.01.2020DONENot Needed09.01.2020; Setup 119.01.20Accepted--------------------
  Draft   Thu Nov 28 11:11:16 2019 Cristinatest with bakeoutReference chamber for Monitor for beam diagnostic   09.01.2020on-goingNot Needed08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 amSetup 2    
  32   Mon Dec 2 14:28:58 2019 CristinaGeneralTS1MU1-test with magnetAugust 2019 delayed to KW6 2020DelayedUnkwonN/ADONEAccepted04.03.2020Customised Accepted Grossmontage
Test bakeout inside the magnet
  34   Wed Dec 4 10:08:42 2019 Cristinatest with bakeoutMacor 3 charge   04.12.19DONEAccepted11.02.2020Customised20.03.2020Cond. Accep.23.03.2020T. Giacomini
  35   Thu Dec 12 09:20:54 2019 Cristinatest with bakeoutIPM SIS100-GiacominiJannuary 2020DelayedUnknown21.04.2020DONENot Needed04.05.2020Customised15.05.2020AcceptedMai/JuniBrough to the TH
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage
  37   Thu Dec 12 10:19:06 2019 Cristinatest with bakeoutPumping chamber SIS100 -StefanEnd 2019DelayedBeginning202010.12.19DONEAcceptedJanuaryCustomised05.02.2020Accepted Stored in the TH
  38   Fri Dec 13 09:03:27 2019 Christianleak checkFasersonde Unilac   12.12.19DONEAccepted12.12.19Customised16.12.19Refused16.12.19Sthraldiagnose
  39   Mon Dec 16 15:27:50 2019 Phetest without bakeoutBeam Diagnostic from Inida - big one   13.13.2019 DONERefused15.01.20Customised19.01.20Accepted24.01.201M.Müller
The chamber has a dent. At the moment (16.12.2019), the chamber is under test for mechanical acceptance.
  40   Tue Dec 17 13:39:20 2019 Pheleak checkFasersonde Unilac -2 test   17.12.2019DONENot Needed17.12.2019Customised17.12.2019Accepted20.12.2019Beam diagnostic
This phase probe was tested by Christian Kolligs on the 12.12.2019 and it has leak rate of 1E-6 mbar.l/s.

The probe was then repaired by the Beam Diagnostic and tested again on the 17.12.2019 by Toni Coronato: it was leaky again. Repaired again and installed in the Unilac on the 20.12.19
Attachment 1: 20191217_134243.jpg
20191217_134243.jpg
  41   Wed Dec 18 11:27:54 2019 Pheleak checkTransistion tube for SIS100 string testBeginning 2020DelayedFebruary06.02.2020DONERefused   Refused  
  42   Thu Jan 16 09:05:12 2020 Cristinatest without bakeoutBPM SIS100- 2010-327.01.20Delayed30.01.2030.01.20DONEAccepted03.02.2020Customised05.02.2020Refused10.02.2020M.Müller
New mobile pumping station - the controller for the IMG did not work. The pressure is recorded from the gauge controller of Mobile pumping setup 2.
  43   Mon Jan 20 10:40:00 2020 Cristinatest with bakeoutCeramic Tube Diagnostic-Dorn 06-004-01376-3KW4On scheduleKW420.01.20DONEAccepted21.01.2020Setup 127.01.20Accepted29.01.20M.Müller
  44   Thu Feb 6 10:33:17 2020 Cristinatest without bakeoutBPM 2010-17 (keept in the new cryostat)KW7On scheduleKW710.02.2020DONEAccepted12.02.2020Mobile 314.02.2020Refused18.02.2020M.Müller
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller
  47   Thu Feb 6 11:11:21 2020 CristinaGeneralIn kind contribution Sweden -NikoMarch 2020On schedule          
  48   Thu Feb 6 12:45:52 2020 Cristinatest without bakeoutProtoype BV CWTMarchOn schedule 26.08.20DONENot Needed14.09.20Customised21.09.20Accepted22.09.20S. Wilfert
  49   Thu Feb 6 12:47:18 2020 Cristinaleak checkInterconnction bellows between Dipole and QuadrupoleOctober On schedule 3.11.20DONEAccepted04.11.20Customised04.11.20Refused04.11.20in Büro of S.Wilfert
  50   Thu Feb 6 12:48:46 2020 Cristinaleak check30 SIS 100 pumping chambersMay 20DelayedDecember 20         
1 chamber required: acceptance test without bakeout
  51   Tue Feb 11 09:53:14 2020 Cristinaleak checkSIS100 Sextupole (6)September 2020Delayed          
  52   Tue Feb 11 09:54:49 2020 Cristinatest with bakeoutSIS100 Injection Kicker September 2020Delayed          
  53   Tue Feb 11 09:57:17 2020 Cristinatest with bakeoutSIS100 diagnostic chambersJune 2020Delayed 17.11.2020DONENot Needed17.11.20Customised25.11.20Cond. Accep.01.12.20Grossmontage
There are a total of 6 chambers. We have to do leak check to all 6, and a complete SAT (with bakeout) to 1 chamber
  54   Tue Feb 11 09:59:48 2020 Cristinaleak checkSIS100 Quadrupole chambersMarch 2020DelayedSeptember 20September 20DONEAccepted30.09.20HEBT Setup06.10.20Accepted8.10.20I.Pongrac
  55   Fri Feb 14 13:34:54 2020 Cristinatest with bakeoutBerrilium Copper Stripes Dermati14.02.2020On schedule14.02.202014.02.2020DONENot Needed17.02.2020; 11:30 amSetup 124.02.2020Cond. Accep.26.02.2020Bardonner
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita
Attachment 1: pumpingspeed.jpg
pumpingspeed.jpg
  58   Tue Mar 3 09:34:40 2020 CristinaCoatingSPARC chambers June 2019DelayedFebraury 202012.02.2020DONEAccepted01.09.2020Horizontal Coating Setup03.11.20Accepted10.12.20Track to Jülich
HR11VU61 (21.09.20); HR18VU63 (06.10.20); HR19VU64 (26.10.20); HR12VU62(02.11.20)
  59   Tue Mar 3 09:58:03 2020 Cristinatest with bakeoutFerrite RI (as received)15.MarchOn schedule 20.03.2020DONENot Needed23.03.2020Setup 127.03.2020Cond. Accep.-----------------
  60   Tue Mar 3 13:50:28 2020 Cristinatest with bakeoutMacor 4 -IPM GiacominiKW10On schedule 03.03.2020DONENot Needed18.03.2020; 07:45 amMobile 227.03.2020Cond. Accep.11.05.2020T. Giacomini
  61   Wed Mar 4 10:06:09 2020 Pheleak checkTransistion tube for SIS100 string test_Second testBeginning 2020DelayedFebruaryEnd of FebruaryDONEAccepted03.03.2020Customised03.03.2020Accepted5.03.2020Ivan and Stefan (for integration @BNG)
Attachment 1: IMG-20200304-WA0001.jpg
IMG-20200304-WA0001.jpg
  62   Mon Mar 9 08:46:22 2020 Phetest without bakeoutBPM SIS100 2010-3, repeat after long pumping @ Hackhalle On schedule 06.03.2020DONEAccepted09.03.2020; 07:00 amMobile 310.03.2020Accepted12.03.2020M.Müller
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller
  64   Thu Mar 12 13:49:09 2020 Phetest without bakeoutBPM SIS100 2010-17 (ceramic only)ReceivedOn schedule 12.03.2020DONENot Needed18.03.2020; 08:25Setup 119.03.2020; 11:00Cond. Accep.19.03.2020M.Müller
  66   Thu Mar 19 11:23:38 2020 Phetest without bakeoutBPM SIS100 2010-15 (after cryo) On schedule 19.03.2020DONENot Needed19.03.2020; 15:00Mobile 325.03.2020Cond. Accep.26.03.2020M.Müller
  67   Wed Mar 25 14:22:40 2020 Phetest without bakeoutBroken ceramic for BPM On schedule 25.03.2020DONENot Needed26.03.2020Setup 227.03.2020Cond. Accep.28.03.2020M.Müller
  68   Mon Apr 6 15:33:45 2020 Phetest with bakeoutUnbaked Ferrites from RI (bigger size) On schedule 06.04.2020DONENot Needed Setup 122.04.2020Cond. Accep.  
  69   Wed Apr 22 08:35:13 2020 Phetest without bakeoutBPM 2010-15 - 2 weeks pump down in Hackhalle On schedule 21.04.2020DONENot Needed21.04.2020; 17:00Mobile 324.04.2020Accepted23.04.20M.Müller
  70   Wed Apr 22 10:14:43 2020 Cristinatest with bakeoutCeramic Tube for Cryring (SieberKW13Delayed22.04.202024.04.2020DONENot Needed27.04.2020Setup 206.05.2020Refused8.05.2020T.Sieber
  71   Wed Apr 22 13:45:53 2020 Cristinatest without bakeoutp-linac dipoles20.04.2020On schedule 20.04.2020DONEAccepted21.04.2020HEBT Setup29.04.2020Cond. Accep.27.05.2020Florian (Grossmontage)
  72   Fri Apr 24 09:56:27 2020 Cristinatest with bakeoutBe windows-SpillmanKW18On schedule 28.04.2020DONENot Needed26.05.2020Setup 2MEASUREMENTS STOPPED 02.10.20Collegue Spillman
  73   Wed May 13 15:26:53 2020 Phetest with bakeoutBig Baked Ferrites PLT 90/50/30 8C11 and Small baked Ferrites CMD5005 On schedule 11.05.2020DONENot Needed13.05.2020; 7:40 amSetup 125.05.2020Cond. Accep.--------------------
  74   Tue May 19 09:20:24 2020 Cristinatest with bakeoutCeramic parts Hillenbrand25.05.20On schedule 25.05.2020DONEAccepted26.05.2020Setup 130.05.2020Accepted09.06.2020Hillenbrand
  75   Tue May 19 12:03:40 2020 PheProblemTurbo Pump from Thomas Seiber On schedule KW19DONENot Needed19.05.2020Customised20.05.2020Refused27.05.2020Student from T.Sieber
Die Pumpe hat den Fehlercode 088 und hat eine Störung des Axiallagersensors.(checked by Graziano)
Attachment 1: pump_Sieber.jpg
pump_Sieber.jpg
  76   Wed May 27 10:34:37 2020 Phetest without bakeoutBPM SIS100 X2010-16   KW21DONENot Needed20.05.2020Customised22.05.2020Cond. Accep.26.08.20M.Müller
  77   Wed Jun 17 10:13:57 2020 Cristinatest with bakeoutIPM SIS18End MayOn schedule End May (the gewind had to be redone by Pfeiffer)DONEAccepted17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20Customised31.08.20Cond. Accep.04.09.2020Back to Tino G.
  78   Wed Jun 17 12:58:02 2020 Cristinatest without bakeoutSIS100 Dipole 07-6-016-4---- ------17.06.2020DONEAccepted17.06.2020HEBT Setup19.06.2020Cond. Accep.22.06.2020brought back to the TH
  79   Fri Aug 28 11:51:30 2020 Phetest without bakeoutSIS100 dipole 07-00009-020-01    DONEAccepted26.08.20HEBT Setup28.08.20Refused1.09.20in the TH
  80   Fri Aug 28 11:52:43 2020 Phetest without bakeoutBPM SIS100 2010-61   26.08.20DONEAccepted26.08.20Mobile 328.08.20Cond. Accep.09.09.20S. Fiedler
  81   Fri Sep 11 09:56:40 2020 Cristinatest without bakeoutBPM SIS100 X2010-63    DONEAccepted31.08.2020Mobile 301.09.20Accepted09.09.20S. Fiedler
  82   Fri Sep 11 09:59:20 2020 Cristinatest without bakeoutBellows IPM SIS18   01.09.2020DONERefused02.09.2020HEBT Setup03.09.2020Refused11.09.2020Zentrale Dienst (back to Giacomini)
  83   Fri Sep 11 10:07:46 2020 Cristinatest with bakeoutNuts company TwinNut    DONEAccepted01.09.2020Mobile 210.09.2020Accepted--------------
  84   Fri Sep 11 10:13:59 2020 Cristinatest without bakeoutCecom diagnostic chamber HEBT   01.09.2020DONEAccepted02.09.2020Setup 104.09.2020Cond. Accep.23.09.20M.Müller
  85   Mon Sep 14 09:15:03 2020 Cristinatest without bakeoutBPM SIS100 2010-17   09.09.20DONEAccepted09.09.2020Mobile 310.09.2020Cond. Accep.17.09.2020M. Müller
  86   Mon Sep 14 09:16:54 2020 Cristinatest with bakeoutMirror Laser cooling SIS100   14.09.2020DONEAccepted6.10.20Mobile 221.10.20Cond. Accep.KW47D.Winters
  87   Mon Sep 14 10:38:59 2020 Cristinatest without bakeoutTest on Viton gasket   14.09.2020TO DONot Needed      
  88   Tue Sep 15 11:14:44 2020 Cristinaleak checkSIS100 Dipole chambers    on-going July 2019Customised    
07-00006-001-0; 07-00006-002-7; 07-00006-003-4; 07-00006-004-1; 07-00006-005-8; 07-00006-006-5; 07-00006-007-2; 07-00006-009-6; 07-00006-010-2; 07-00006-011-9; 07-00006-012-6; 07-00006-013-3; 07-00006-014-0; 07-00006-016-4 (mit RGA); 07-00006-017-1; 07-00006-018-8; 07-00006-019-5; 07-00006-020-1 (mit RGA); 07-00006-022-5; 07-00006-023-2; 07-00006-024-9; 07-00006-026-3; 07-00006-028-7; 07-00006-033-1; 07-00006-048-5; 07-00006-036-2;07-00006-049-2; 07-00006-042-3; 07-00006-046-1;07-00006-040-9;07-00006-053-9;07-00006-039-3; 07-00006-050-8; 07-00006-047-8;07-00006-015-7; 07-00006-021-8;07-00006-025-6;07-00006-027-0;07-00006-034-8;07-00006-035-5;07-00006-049-2; 07-00006-046-1; 07-00006-047-8; 07-00006-045-4; 07-00006-044-7; 07-00006-055-3; 07-00006-054-6; 07-00006-051-5; 07-00006-059-1; 07-00006-041-6; 07-00006-065-2; 07-00006-038-6;07-00006-030-0; 07-00006-037-9; 07-00006-031-7;07-00006-032-4; 07-00006-056-0; 07-00006-057-7; 07-00006-052-2; 07-00006-069-0; 07-00006-060-7; 07-00006-072-0; 07-00006-058-4; 07-00006-067-6;07-00006-070-6; 07-00006-066-9;07-00006-062-1
  90   Mon Sep 21 11:31:47 2020 Cristinatest without bakeoutHEBT BPMKW39On schedule 28.09.20on-goingAccepted05.10.20. Test started again: 08.12.20Mobile 3 Refused  
Since 19. Okt we wait for the decision of the diagnostic group on how(who has to clean the BPM. Since then the test is stopped. Meeting on the 2.12.20: The japanise company will clean a BPM and they will send us to be tested. Email from Dorn on the 07.12.20: we have to test the other 3 BPM, and later they will take care of the cleaning of the refused BPM. On the 7.12 we tested another BPM: dirty. We sent on the 14.12 an email to Dorn and Kowina, showing that the ceramic are dirty and that they make dirty also our reference chamber. Measurement stopped again.
  91   Mon Sep 21 11:32:46 2020 Cristinatest with bakeoutFerrite RI after firing   18.09.20DONEAccepted22.09.2020Setup 11.10.20Accepted------------------
  92   Mon Sep 21 11:39:27 2020 Cristinatest without bakeoutSteel with epoxy glueAugust 20Delayed 21.09.20DONE 22.09.2020 03.10.20Refused??
  93   Mon Sep 21 14:26:53 2020 Cristinaleak checkBeam line CWT   21.08.20  21.09.20Customised23.09.2020Accepted24.09.20S.Wilfert
  95   Wed Sep 30 13:39:48 2020 Cristinatest with bakeoutTube CCC Cryring   30.09.2020DONEAccepted5.10.20Setup 107.10.20Accepted8.10.20T. Sieber
  96   Tue Oct 13 07:54:31 2020 Phetest without bakeoutEpoxy - baked in the oven @ 80 deg C09.10.2020On schedule 09.10.2020DONENot Needed22.10.20Mobile 229.10.20Refused  
  97   Wed Oct 21 10:51:47 2020 Cristinatest with bakeoutIPM SIS18 mit diagnostic parts   25.09.2020DONERefused20.10.20 29.10.20Cond. Accep.2.11.20Grossmontage
  98   Tue Nov 3 09:55:20 2020 Cristinatest with bakeoutMCPs for IPM SIS18SeptemberDelayed 2.11.20DONEAccepted2.11.20Setup 109.11.2020Cond. Accep.10.11.2020T.Giacomini
  99   Tue Nov 17 09:43:55 2020 Cristinatest without bakeoutBPM 2010-16   ?DONEAccepted16.11.20Mobile 317.11.20Cond. Accep.01.12.20Grossmontage
  100   Thu Nov 19 10:15:23 2020 CristinaCoatingParts for Cryring    Beginning October 20DONEAccepted16.11.20Horizontal Coating Setup17.11.20Accepted26.11.20David (Cryring)
There are some parts which were not coated: 2 bellows (the Cryring people still did not receive them from the company) and a T-piece, which was brought to the cleaning on the 20 of October and it is not yet ready.
  101   Thu Nov 19 10:17:06 2020 CristinaCoatingCoating chamber Glorius   16.11.20DONEAccepted27.11.20Horizontal Coating Setup3.12.20Accepted14.12.20Glorius
  102   Mon Nov 30 11:14:30 2020 CristinaCoatingT-piece CryringOct  KW48DONEAccepted26.11.20Horizontal Coating Setup3.12.20Accepted10.12.20Nikita
  103   Mon Nov 30 11:15:48 2020 Cristinatest with bakeoutAntrieb for ESR-Beata1 Dec.Delayed?3.12.20DONENot Needed3.12.20Setup 110.12.2020Accepted11.12.20Müller
  104   Mon Nov 30 11:17:49 2020 Cristinaleak check5 x SIS100 Diagnostic ChambersKW 49   DONENot Needed01.12.20 16.12.20Accepted  
06-00401-099-1 (abgeholt on the 07.12 M.Müller); 06-00401-100-4 (abgeholt 09.12.20 Müller); 06-00401-101-1; 06-00401-103-5
  105   Tue Dec 1 11:49:07 2020 Cristinatest with bakeoutBellows IPM SIS18-Second measurement after cleaning   12.10.20DONENot Needed12.10.20HEBT Setup14.10.20Accepted15.10.20Zentrale Dienst
  106   Tue Jan 12 12:48:45 2021 Cristinatest without bakeoutHEBT BPM-Cleaned @KyoceraBeginning 21On schedule 12.01.21DONEAccepted12.01.21Mobile 314.01.21Accepted19.01.21M.Müller
  107   Wed Jan 20 11:48:54 2021 Cristinatest without bakeoutHEBT BPM cleaned @GSI   19.01.21DONEAccepted20.01.21Mobile 321.01.21Refused24.02.21M.Müller
  108   Fri Jan 29 11:50:13 2021 CristinaGeneralPillow seals SFRS   14.01.21DONEAccepted18.01.21Customised26.02.21Cond. Accep.12.03.21Cristos
  109   Fri Jan 29 11:52:53 2021 Cristinapumping speedNEG strips CRYRing   End Dec 20DONEAccepted25.01.21Fischer-Mommsen17.02.2021Accepted02.03.21Nikos
  110   Fri Jan 29 11:54:20 2021 Cristinaleak checkGate Valve   14.01.21DONEAccepted28.01.21Customised28.01.21Refused29.01.21A.Tauschwitz
  111   Fri Jan 29 11:55:45 2021 CristinaGeneralLower pressure of primary pumps   Dec 20DONEAccepted18.01.21Customised22.01.21Accepted-----G.Savino
  112   Mon Feb 1 16:04:00 2021 Phetest with bakeoutAntriebe SIS100 On schedule 01.02.2021DONE 02.02.2021Setup 110.02.2021Accepted11.02.21M.Müller
  113   Wed Feb 3 11:47:32 2021 Cristinaleak checkCARME vacuum chamberDec 2020Delayed 02.02.2021DONEAccepted02.02.2021Customised02.202.2021Accepted03.02.2021N.Petridis
  114   Wed Feb 3 11:50:09 2021 Cristinatest with bakeoutDetector Pockets for scintillators SIS18   02.02.2021on-going 08.02.21HEBT Setup11.03.21Cond. Accep.12.03.21M.Müller
  115   Wed Feb 17 11:30:26 2021 Cristinatest without bakeoutCECOM diagnostic chamber1.02.21  17.02.21DONEAccepted18.01.21Customised19.02.21Cond. Accep.  
  116   Wed Feb 17 11:31:08 2021 Cristinatest without bakeoutSIS100 BPM   15.02.21DONEAccepted16.02.21 18.02.21Accepted24.02.21M.Müller
  117   Wed Feb 17 11:50:45 2021 Cristinaleak checkSIS100 HF Cavities   15.02.21DONEAccepted15.02.21Customised16.02.21Accepted17.02.21In Weitestadt
  118   Fri Feb 19 08:39:57 2021 Cristina HEBT BPM cleaned @GSI-second measurement   10.02.21DONEAccepted10.02.21Customised18.02.21Accepted24.02.21M.Müller
  119   Fri Feb 19 08:41:46 2021 Cristinaleak check2x Cryostats-Kujouharov1.02.21 11.02.2111.02.21DONE 12.02.21Customised02.03.21Cond. Accep.09.03.21Kojouharov
  120   Wed Feb 24 13:50:25 2021 Cristinaleak checkCavity for DALINAC22.02.21Delayed01.03.2109.03.21DONENot Needed10.03.21Customised11.03.21Cond. Accep.18.03.21Dmytriiev D.
The cavity is dirty und must be cleaned
  121   Wed Feb 24 13:51:01 2021 Cristinatest with bakeout3D printed tube per pLinac01.03.21  08.03.21DONEAccepted16.03.21Setup 118.03.21Accepted18.01.21Büro Andreas
  122   Wed Mar 10 12:11:04 2021 Cristinatest with bakeoutViewports DN100 ESR   16.02.21on-goingNot Needed16.02.21Setup 116.03.21Cond. Accep.26.03.21R.Sanchez
  123   Thu Mar 18 11:40:02 2021 Cristinatest with bakeoutSIS100/HEBT Manipulator C.Dorn   17.03.21DONENot Needed18.03.21Setup 124.03.21Accepted29.03.21M.Müller
  124   Wed Apr 28 10:05:13 2021 Cristinatest without bakeoutSIS100 pumping chambers -after cleaning by the Company   23.04.21on-goingAccepted26.04.Customised21.05.21Cond. Accep.  
5 chambers checked: 07-00052-05-3; 06-00052-06-0; 07-00052-02-2; 07-00052-03-9; 07-00052-04-6
  125   Wed Apr 28 10:21:27 2021 Cristinatest without bakeoutCecom after cleaning   06.04.21DONENot Needed06.04.21Customised08.04.21Accepted12.05.21M.Müller
  126   Wed Apr 28 10:23:18 2021 Cristinatest without bakeout3Dprinting Copper coated sample   25.03.21DONENot Needed25.03.21 26.03.21Cond. Accep.  
  127   Wed Apr 28 10:28:18 2021 Cristinatest without bakeoutCeramic for SIS100 BPM   22.03.21DONE 22.03.21Mobile 329.03.21Accepted M.Müller
  128   Wed Apr 28 10:30:54 2021 Cristinatest with bakeoutHEBT Antrieb (in-kind Slovenia) 06-0050-39-54   23.04.21DONENot Needed26.04.21Setup 103.05.21Accepted06.05.21M.Müller
  129   Tue May 18 10:50:26 2021 Cristinatest with bakeoutHEBT Antrieb 06-0050-036-40   06.05.21DONENot Needed06.05.21Setup 112.05.21Accepted17.05.21M.Müller
  130   Tue May 18 14:10:04 2021 Cristinatest without bakeoutTrafos BPM   12.05.21DONENot Needed18.05.21Customised21.05.21Refused07.06.21M.Müller
  131   Tue May 18 14:11:08 2021 Cristinatest without bakeoutBPM CID: 06005002605   18.05.21DONE 19.05.21Mobile 321.05.21Cond. Accep.07.06.21M.Müller
  132   Fri May 21 13:29:15 2021 Cristinatest with bakeout2xDN63 windows for ESR    20.05.21DONENot Needed18.05.21Setup 102.06.21Accepted18.06.21R.Sanchez
  133   Tue Jun 8 10:19:14 2021 Cristinatest without bakeoutDipole Module   25.05.21DONENot Needed25.05.21Customised27.07.21Cond. Accep.THF.Kaether
  134   Tue Jun 8 10:27:49 2021 Cristinatest with bakeoutMirror system ESR-Brandau07.06.21Delayed 21.06.21DONENot Needed25.06.21Mobile 213.07.21Cond. Accep.24.09.21Brandau
  135   Tue Jun 8 10:28:46 2021 Cristinatest with bakeoutPockets for ESRKW25  21.06.21DONENot Needed24.06.21Setup 112.07.21Accepted19.07.21Glorious
  136   Mon Jun 14 11:48:43 2021 Cristinatest with bakeoutAntrieb für SIS100   07.06.21DONENot Needed14.06.21Setup 122.06.21Accepted28.06.21M.Müller
  137   Thu Jun 24 12:05:07 2021 Cristinatest with bakeoutBearings for HEBT-foil-stripper -ZellerKW26  01.07.21DONENot Needed14.07.21Mobile 205.08.21Refused  
  138   Thu Jun 24 12:06:49 2021 Cristinatest with bakeoutTest for polymide coated sample- Fischer    DONE 2.07.21HEBT Setup6.07.21Cond. Accep.8.07.21L.Fischer
  139   Thu Jun 24 12:07:27 2021 Cristinatest with bakeoutInjection Septa SIS100   21.06.21DONENot Needed23.06.21Customised14.07.21Cond. Accep.19.07.21Report sent to I.Pongrac (Component in TH)
  140   Mon Jul 12 13:45:55 2021 Cristinatest with bakeoutBPM SIS100   09.07.21DONENot Needed13.07.21Mobile 314.07.21Cond. Accep.20.07.21R.Mahr
  141   Mon Jul 12 13:46:30 2021 Cristinatest without bakeoutExperimental Chamber5.07.21  14.07.21DONE 15.07.21Customised22.07.21Cond. Accep.26.07.21Bömsch
  142   Mon Jul 12 13:47:03 2021 Cristinatest without bakeoutTrafos for isolation vacuum-Piotr   02.07.21DONENot Needed07.07.21Mobile 312.07.21Refused19.08.21P. Kowina
  143   Wed Jul 14 14:09:31 2021 Cristinatest with bakeoutProfil Gitter for HEBT   09.07.21DONENot Needed14.07.21Setup 119.07.21Cond. Accep.  
  144   Thu Aug 19 09:53:54 2021 Cristinatest with bakeoutMCP for ESR-Giacomini   05.08.21DONENot Needed11.08.21Setup 117.08.21 17.08.21F. Wolf
  145   Thu Aug 19 09:58:04 2021 Cristina Profil Gitter for HEBT    DONENot Needed14.07.21 19.07.21Refused  
  146   Thu Aug 19 10:00:46 2021 Cristina BPM Kyocera (8 pieces)28.07.21  30.07.21DONENot Needed02.08.21Mobile 328.08.21Accepted31.08.21F.Wolf
  147   Fri Aug 20 09:21:08 2021 Cristinatest with bakeoutDiagnostic chambers (2)   19.08.21DONENot Needed14.09.21Customised25.09.21Cond. Accep.02.11.2021M. Mueller
  148   Wed Sep 15 10:29:42 2021 Cristinatest with bakeoutAl chamber    DONENot Needed02.09.21Mobile 313.09.21Accepted16.09.21N.Staldmann
  149   Tue Sep 21 11:38:16 2021 Phetest without bakeoutKyocera ceramics - 4x On schedule 21.09.2021DONE 23.09.21Mobile 315.10.21Accepted  
  150   Tue Sep 28 11:55:07 2021 Cristinatest without bakeoutBPM with ceramic   12.09.21DONENot Needed14.09.21Mobile 316.09.21Refused28.09.21M.Müller
  151   Wed Oct 20 11:25:04 2021 Phetest without bakeoutBPM Chambers - 2x On schedule 20.10.2021DONENot Needed21.10.21 27.10.21Cond. Accep.02.11.21M.Mueller
  Draft   Tue Nov 2 09:06:05 2021 Phetest without bakeoutCecom chamber for FAT K2030-1123, 06004016122 On schedule  on-going       
  153   Mon Nov 8 15:10:43 2021 Phetest with bakeoutSIS100 bunch compressor with ceramic gap On schedule 08.11.2021DONENot Needed25.11.21Setup 101.12.21Accepted  
  154   Wed Nov 17 11:46:15 2021 Cristinatest with bakeoutCoated Al sheet metall bent (Brandau)   5.11.21DONENot Needed8.11.21Setup 115.11.21Cond. Accep.03.02.22R.Sanchez
  155   Wed Nov 17 11:48:30 2021 Cristinatest without bakeoutFluorescence chamber SIS100   12.11.21DONEAccepted17.11.21Mobile 318.11.21Accepted  
  156   Wed Nov 17 11:50:00 2021 Cristinaleak checkSIS100 bunch compressor   15.11.21DONENot Needed16.11.21Customised17.11.21Accepted  
  157   Wed Nov 17 11:51:00 2021 Cristinatest with bakeoutSecond SIS100 injection Septa     DONENot Needed11.11.21Customised19.11.21Cond. Accep.  
  158   Thu Dec 2 11:08:38 2021 Cristinatest without bakeoutBPM   30.11.21DONENot Needed02.12.21Mobile 306.12.21Accepted23.02.22M.Müller
  159   Thu Dec 9 11:41:47 2021 Cristinatest with bakeoutTube with ceramic gap- resistence study   03.12.21DONENot Needed06.12.21Setup 109.12.21 Dec 21 
  160   Thu Dec 9 11:42:50 2021 Cristinatest without bakeoutBPM   07.12.21DONENot Needed09.12.21Mobile 313.12.21Cond. Accep.17.12.21Müller
  161   Wed Jan 12 08:40:00 2022 Cristina Windows for ESR   10.01.22DONENot Needed13.01.22Setup 221.10.22Cond. Accep.03.02.22R.Sanchez
  162   Wed Jan 12 08:40:41 2022 Cristina XHU detector ESR   16.12.21DONENot Needed12.01.22Setup 126.01.22Cond. Accep.24.02.22D.Winters
  163   Tue Jan 18 08:50:13 2022 Cristinatest with bakeoutMirror chamber ESR (Brandau)   16.01.22DONENot Needed17.01.22Customised31.01.22Cond. Accep.31.01.22ESR
  164   Tue Jan 18 08:51:15 2022 Cristinatest without bakeoutGrids for pLinac (Siebert)07.01.22  17.01.22DONENot Needed19.01.22HEBT Setup31.01.22Cond. Accep.31.01.22T.Sieber
  165   Wed Feb 9 14:19:51 2022 Cristinatest without bakeoutCECOM chamber   KW5DONENot Needed08.02.2022Customised09.02.22Accepted M.Müller
  166   Tue Feb 15 09:56:13 2022 Cristinatest without bakeoutNTG chamber HEBT special installation   03.02.22DONENot Needed10.02.22Customised14.02.22Cond. Accep.25.06.22S.Zeller
  167   Fri Feb 25 09:36:32 2022 Cristinatest with bakeoutGrid+manipolator   KW7DONE 23.02.22Setup 111.03.22Accepted  
  168   Fri Feb 25 09:37:36 2022 Cristinatest without bakeout2 BMP   23.02.22DONE 28.02.22Mobile 304.03.22Accepted04.03.22M.Müller
  169   Tue Mar 15 14:06:51 2022 Cristina Indian diagnostic chamber   11.03.22DONENot Needed15.03.22Customised16.03.22Accepted  
  170   Tue Mar 22 11:27:51 2022 Cristinatest with bakeoutSIS100 Qpole    on-goingNot Needed22.03.22Customised    
  171   Mon Mar 28 11:50:59 2022 Cristinatest without bakeoutMissing dipole   28.03.22TO DO       