HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025, all entries  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Apr 25 15:45:39 2025, Jan Glorius, DAQ, DR DAQ - MBS & Go4 
The DR DAQ is located in AP Messhuette, here is the basic info.

[H2]MBS[/H2] 
Entry  Wed Apr 30 19:59:18 2025, Carsten, DAQ, DR_DAQ 
       enum{TRIG_INJECTION=1, 
    TRIG_NEWRAMP=2, 
    TRIG_NEWVOLTAGE=3, 
Entry  Mon May 5 11:29:28 2025, Rodolfo, Simon, Nils, Volker, Detectors, PMTs SolarBlind_ET_9422_SN1042.pdfThornEmi_PMT9422A_SN1001_(1987).pdfPMT_Arrangement_Libelle2025.jpgPMT_R1017_Configuration_Beamtime2025.png
These are the PMTs installed at the optical detection region:

[TABLE border="1"]
Entry  Mon May 5 16:26:07 2025, Carsten, DAQ, DR Computer Names and IPs 
Computers used for control of HV amplifiers and DR microcontrollers are
[LIST]
[*] main control (big Philips monitor): sadpc058.gsi.de - 140.181.98.68
Entry  Mon May 5 21:13:29 2025, Rodolfo, Laser, Collimation of laser beam Cobra593nm_Laserbeam_Collimation_2025-05-05.JPG
Here some parameters for the collimation of the laser beam

Periscope: 
Entry  Tue May 6 15:35:12 2025, Rodolfo, Konstantin, Laser, MRC Settings MRC_Settings_Cobra593_VolleLeistung_2025-05-06.JPGMRC_Controller_Settings_2025-05-06.jpgAFG3202C_Settings.jpg
Following settings (P-Factor, Directions and Bandwidth) are used for the laser beam stabilization. Full energy (ca. 150 mJ @ 593 nm).

The triggers for the MRC are generated by AFG3102C. The settings (the same for both CH1 and CH2) are saved under "Abrufen / Setup2"
Entry  Wed May 7 14:02:58 2025, Konstantin, DAQ, DAQ Folder 
The folder of the data acquisition are:

[B]Go4[/B] (atplaser@lxg1297):[B] ~/go4/drals[/B]
Entry  Wed May 7 17:29:19 2025, Rodolfo, Simon, DAQ, Fast Photodiodes FastPD-Signals_Messhütte_2025-05-07.jpg
Signal for the fast photodiodes. The laser beam
[LIST]
[*] enters at the Nord-Ost (NO) Arc and
Entry  Wed May 7 20:31:52 2025, Carsten, DAQ, DRALS cabling (DR part) 
[B] Green Corner, patch panel to ESR[/B]
All signals from/ to ESR TTL 5V.
Signals are GND decoupled with grey boxes! Don't use the signals directly.
Entry  Thu May 8 10:11:37 2025, Carsten, General, Schottky spectrum ( 2 Harmonics) from the earlier 209Bi80+ Libelle run (thesis C. Trageser) Schottky_Libelle_on_209Bi80.png
 
Entry  Thu May 8 10:21:10 2025, Carsten, , Link to thesis of C. Trageser NTCAP/ Automated Schottky analysis of cooler voltage and space charge) 
The thesis of Christian might be helpful w.r.t. to energy calibration as it shows how to link Schottky frequency to ion energy (might be required since
in DRALS the exact ion energy will be difficult to derive from voltage measurements only).
Cf., chapter 6  (thesis is in German)
Entry  Thu May 8 13:33:13 2025, Rodolfo, Simon, Laser, Camera @ South-West Screen Laserbeam@SW-Screen_2025-05-08.JPG
Network camera to monitor the position of the laser beam after the electron cooler.  
[B]
apdev017.gsi.de
Entry  Thu May 8 17:23:51 2025, Shahab, General, Schottky TV 
setup Schottky TV:

connect to atppc030 using:
Entry  Thu May 8 19:35:18 2025, Simon, , PMT count rates 
I tested the PMTs and tried to reduce the background signal as far as possible.

[TABLE border="1"]
Entry  Thu May 8 22:50:37 2025, Carsten, DAQ, Preliminary Timing Settings 
Tentatively:

[B]DAC:[/B]
Entry  Thu May 8 23:36:19 2025, Konstantin, DAQ, Fileserver MBS_SshowAcq.png
To save files, the rfio-server must be started on lxg1297 in the folder /data.local2/BiDrals/. The file structure is

[B]/data.local2/BiDrals/208Bi_XXX.lmd[/B]
Entry  Fri May 9 00:56:07 2025, Konstantin, DAQ, First Files  
Files 91 + 92 were recorded with the Trigger logic as explained in [URL=https://elog.gsi.de/esr/E0038/15][COLOR=blue][B]ID 15[/B][/COLOR][/URL]. The laser
was scanned from 593 to 592 in 101 steps. 100 laser steps were accumulated at each step. Bunching HF was synthesized by an AFG with a frequency of 1.787327MHZ
and divided by 89
Entry  Fri May 9 14:21:18 2025, Rodolfo, Accelerator, T-Scrapers Scrapereinstellung_am_ESR.pdf
Information about the T-Scrapers at the ESR Electron Cooler. The width of the scraper is approx. 9 mm.

There was some issue about the Scraper GECEDS2VU. Herr Boywitt solved this issue and shortly communicated the procedure about how to move it. 
Entry  Fri May 9 17:47:07 2025, Konstantin, DAQ, HV Divider  
The HV voltage applied at the high-voltage platform of the electron cooler can be observed at [URL=https://lxyrpc01.gsi.de/grafana/d/bec8zc1424agwc/esr-electron-cooler-voltages?orgId=1&from=now-5m&to=now&refresh=5s]HV-divider[/URL].
Entry  Fri May 9 18:34:08 2025, Konstantin, DAQ, Important diagnoses of analysis parameters QSwitchDiagnose.pngSetConditions.pngMHzScaler.pngMHZWinC.pngSetParameters.png
The filling of some histograms in the go4 analysis framework is controlled by the SetParameters.C and SetConditions.C files.

The WinC conditions are applied to all histograms under the folder [B]"Analysis/Histograms/0_Raw/Scaler"[/B]
Entry  Sat May 10 00:52:21 2025, Finn, Simon, Konstantin, Rodolfo, DAQ, Bunching - ammendment late shift 
Some 209Bi80+ beam was provided for tests measurement over the weekend. Currently the beam is bunched at the second harmonic, corresponding to a bunching
frequency of [B]3.87421MHz[/B] and a revolution frequency of [B]1.937105MHz[/B]. The setting of the rate dividers were 2 and 99. Two is important since
we are working with the second harmonic, and 99 provides approximately 20kHz, which is expected by the DAQ. The measurement of the frequency was performed
Entry  Sat May 10 03:32:18 2025, Finn, Simon, General, Beam not bunched (?) Bildschirmfoto_2025-05-10_03-31-28.pngBildschirmfoto_2025-05-10_03-31-28.png
We think the beam in the ESR is not bunched. There is a clear difference in PMT signal if ions are in the ESR compared to no ions (see screenshot of scaler
PMT mid, high level with ions, low level without) but we see no structure of an ion bunch (see screenshot of accumulated bins). 
We also increased the accumulation to 10 injections, still no bunch visible.
Entry  Sat May 10 03:46:57 2025, Finn, Simon, Detectors, PMT north Bildschirmfoto_2025-05-10_04-17-00.png
In contrast to PMT Mid, the difference between ions and no ions in the ESR (see screenshot scaler) is not visible. Signal gets higher with injection and
shows some kind of exponential decay afterwards. 
Beam was dumped at 500 and 1200s. Even after the dump, the signal steadily drops.
Entry  Sat May 10 03:54:46 2025, Finn, Simon, Carsten , General, Night shift sum up - ammendment day shift Bunching_Screenshot_2025-05-10_125634.png
As the beam in the ESR is most probably not bunched, there was not much we could do. During the night shift we:
- adjusted the threshold of the PMTs mid and north with beam in the ring
- found that the delay generator for PMT mid is broken, so the timing is off and needs to be remeasured
Entry  Sat May 10 12:58:54 2025, Carsten, Detectors, Scrapers do not work reliably / Scraper positions for further tests 
I tried scraping with pressurized-air devices in order to verify the beam poistion. All 4 devices that we use do not work reliable (at least when driven
"manually" via Device Control).
1) Sometimes they do not reach the set position
Entry  Sat May 10 17:05:24 2025, Konstantin, Detectors, XUV detector and copper mirror control Manual.pdfCopperMirrorControl.png
I attach the manual of the XUV and copper mirror control software, which is hosted at the Raspberry Pi (140.181.91.15) below the optical detection region
at ESR. The Motor position of the stepper motor is at 0mm, which corresponds to the outer park position. 
Entry  Sat May 10 17:47:50 2025, Carsten, Wilfried, Accelerator, Drifttube Cooling works 
The cooling ith a tentative DRALS pattern works well. 
Cooling voltage in SC8 is now 905 V higher:
ESR manipulations -> Cooler maniuplations -> GECEBG1E is changed from +150V to +1055V. Please note the sign conventions. This means that the electrons
Entry  Sat May 10 20:14:47 2025, Rodolfo, Wilfried, Carsten, General, Lights in ESR 
The light (Beleuchtung) inside the Cave have been ON since probably yesterday evening (9. May) when Uli was inside the cave for fixing some issues. 

We have now turned off the light.
Entry  Sat May 10 20:53:17 2025, Rodolfo, Konstantin, Accelerator, Reading of E-Cooler Voltage Grafana_ECoolerVoltage_Bildschirmfoto_2025-05-10_21-09-46.png
We do not have the reading of the electron cooler voltage. According to Grafana the reading of the voltage stopped at 11:53:00, when the voltage was 205070
V.
Entry  Sat May 10 22:47:29 2025, Konstantin, DAQ, HV Divider HVReadout.png
The readout of the hv dividers is running again. In order to restart the acquisition if it has crashed, connect to the raspberry pi and restart the analysis.
Therefore, use the following procedure (Optional steps are indicated with [B](*)[/B]):
[LIST]
Entry  Sat May 10 23:30:37 2025, Rodolfo, Accelerator, Ion Pumps at the target section Vakuum_IOP_EIN_2025-05-05.pngVakuum_IOP_AUS_2025-05-05.png
The ion pumps (E02VP16i and E02VP17i) which nearby the optical detection region produce high count rate into the photomultipiers. Therefore they were turned
off on May 5th by our colleague from UHV (Herr Mia). He checked the vacuum before (EIN) and after (AUS) turning off the pumps. 
Entry  Sun May 11 03:10:41 2025, Konstantin, Simon, Detectors, Bunched beam on PMT Bildschirmfoto_2025-05-11_02-11-44.pngBildschirmfoto_2025-05-11_02-12-11.pngBildschirmfoto_2025-05-11_03-41-52.png
We checked again the time-resolved signal on the PMTs and after several minutes of accumulation we saw a the bunch shapes on PMT mid (att. 1 right) and
also a tiny indication on PMT north (att. 1 left).
On the particle detector, the bunches are clearly visible (att. 2).
Entry  Sun May 11 03:23:18 2025, Simon, Konstantin, Calibration, Delaytime measurement 
We performed another set of delay time measurements to substitude the broken channel of PMT middle. We did this in two step:

1.) Measurement of the total delay between the origin of a signal (AFG 10kHz, -50mV amplitude) and the detection directly before the DAQ after traveling
Entry  Sun May 11 05:16:22 2025, Konstantin, Simon, Accelerator, Breeding of Lithium 
We measured the breeding efficiency of Li-like ions in the ESR and the rates are way below the expected 25%.

[TABLE border="1"]
Entry  Sun May 11 05:25:07 2025, Simon, Konstantin, General, Detector drives 
Currently, the particle detectors show a weird behavior. Sometimes they drive too far. [B]IMPORTANT: As long as it is unclear what is the reason for this,
only ask for a new injection with the BSS Control once it is checked that the devices [COLOR=red]GE02DD2[/COLOR], [COLOR=red]GE02DS3HG[/COLOR], [COLOR=red]GE01DD2IG[/COLOR],
and [COLOR=red]GE01DS3HG[/COLOR] are at their outer end positions. [/B]
Entry  Sun May 11 15:42:18 2025, Carsten, General, Particle detector / dielectronic recombination measurements DR_500mA_bunched.pngDR_500mA_DC_long_ramp.png
The DR setup was put into operation yesterday and first spectra recorded (see below).
Particle detector behind cooler ("SA_SZ") presently has voltage of 1350. The threshold at the CAEN CFD was set to 100 and changed to 150 today. There is
a huge gap between noise and signal, however, today it seemed in DR that we had a burst of higher pulses.
Entry  Sun May 11 17:30:24 2025, Carsten, Rodolfo, Jonas, General, Accidentally Skipped Breeding Step in File 0012.LMD 
At ~17:26:30 the beam process was accidentally set to not wait on breeding, affecting the data in file 0012.LMD
Entry  Sun May 11 20:08:37 2025, Carsten, Runs, DR runs with DC beam DR_500mA_Not_Bunched.pngRR_500mA_Not_buched.png
We have 4 valid DR files for DR with unbunched beam. Iel = 500mA
run_0011.lmd
run_0012.lmd
Entry  Sun May 11 23:16:14 2025, Carsten, Runs, Switched back to bunching beam 
At about 22:30 we switched back to the bunched beam.
The new NTCAP directory is IQ_2025-05-11_22-37-04, started NTCAP Schottky data.
Same ramp as before 24 eV to 4 eV. 1001 steps dE = 0.02 eV,
Entry  Mon May 12 07:19:16 2025, Finn, Simon, Konstantin, DAQ, DR Measurements 
During this night we recorded several DR measurements. Before the DR, we charged bread for about 10 minutes.

1. We took over at 0:00 with file no.16 (started 22:15) 
Entry  Mon May 12 10:09:21 2025, Christopher, Nils, Accelerator, Intervention TK Chopper - no beam for one hour 
At 11am there will be an intervention for about one hour related to the TK chopper - hence no beam for SIS as well as ESR.
During that time, the pneumatic drives within ESR will be mechanically checked (lubricated).
Entry  Mon May 12 14:47:52 2025, Christopher, DAQ, frequency counter BG7TBL_FA-2_Frequency_Counter_Operator_Manual-62519_English_Ed.pdf
FA-2 frequency counter
Entry  Mon May 12 21:39:49 2025, Zoran, Runs, DR running again with Bi209 
Stronger spectra than before, probably due to a stronger overlap with the electron beam.
Open files starting with run_0022, finished with 0025, each one about 6 min charge breeding and 11 min ramp
ntcap stopped, electron current 500 mA, DC beam
Entry  Mon May 12 22:44:00 2025, Zoran, Runs, 209Bi bunched beam 
ntcap restarted (05-12_22-22-23), measuring with bunched beam
10 min breeding time
Entry  Mon May 12 23:34:39 2025, Carsten, Analysis, Sample DR Spectra DR_209Bi_500mA_newESR_settings.pngDR_209Bi_500mA_newESR_settings_bunched.png
See attachment - electron current 500 mA.
First spectrum DC,
Second spectrum bunched.
Entry  Tue May 13 00:05:39 2025, Konstantin, Calibration, Cooler HV 
The DR measurement was repeated with proper electron cooler settings. Readout of electron cooler HV is not affected by the Grafana failure and can be displayed
in Medusa in the View "Log-Display". Measured voltages in Subchain 8 are:
Entry  Tue May 13 00:36:27 2025, Finn, Simon, Konstantin, , DR measurements. Night shift. 
[TABLE border="1"]
Time |File | PTB 32 | PTB 33 | Ohmlabs | ESR intensity SC8 | Typical SIS injections | comments |-
00:18 | 27 | 205819 | 205819 | 205812 | 2.24e7 | 4e8 | |-
Entry  Tue May 13 00:43:31 2025, Konstantin, General, Connection interrupt 
Connection reset to all NUCs by accident manual power cut.
Entry  Tue May 13 12:59:49 2025, Carsten, Wilfried, Christopher, Nils, General, Setup of ESR for 208Bi 
In the morning the colleagues from ESR setup the beam for production of 208Bi81+, however the identification (via the schottky) of the correct fragments
and charge states is still ongoing.
Entry  Tue May 13 15:34:23 2025, Yuri, Calibration, Particle Identification 
Setting on 208Bi81+
Manipulation after accumulation and orbit shift, before slowing down
Entry  Tue May 13 17:46:35 2025, Carsten, Runs, Start of DR measurements with 208Bi DR_208Bi_500mA_unbunched(DC).pngDR_208Bi_500mA_unbunched(DC)_true_counts.png
Same ramps as before, 8 repetitions.
ESR is set-up for breeding of 208Bi80+.
In order to reduce unwanted primary at injection to the ESR, in the transfer line scrapers are in use, presently GTE4DS5HL -5.0, GTE4DS5HR +7.0
Entry  Tue May 13 21:37:09 2025, Carsten, Runs, DR run with bunched beam / 500 mA /208Bi80+ 
Just changed settings towards a new scanning range and bunched beam.
Stopped and started NTCAP, now: IQ_2025-05-13_21-01-44
new ADC file
Entry  Wed May 14 00:11:52 2025, Dimitrios, Simon, Runs, Night shift DR Bi-208 Screenshot_2025-05-14_06-33-45.png
[TABLE border="1"]
Time |File | PTB 32 | PTB 33 | Ohmlabs | ESR intensity SC8 | Typical SIS injections | comments |-
00:15 | 36 | 205860 | 205861 | 205853 | 0 | 8e8 | something killed the beam after deceleration, particle detectors look fine|-
Entry  Tue May 13 01:21:16 2025, Konstantin, Simon, Analysis, Longitudinal bunch length Bildschirmfoto_2025-05-13_01-24-40.pngBildschirmfoto_2025-05-13_01-33-06.pngBildschirmfoto_2025-05-13_01-38-19.png
We measured the longitudinal bunch length for all different detectors

[TABLE border="1"]
    Reply  Wed May 14 02:19:46 2025, Dimitrios, Simon, Analysis, Longitudinal bunch length Bildschirmfoto_2025-05-14_02-16-42.pngBildschirmfoto_2025-05-14_02-17-58.pngBildschirmfoto_2025-05-14_02-15-05.png
We repeated this measurement for 208-Bi. The bunch lengths are about half as long (due to lower space charge and consequently less heating?)

[TABLE border="1"]
Entry  Wed May 14 06:31:28 2025, Dimitrios, Simon, Runs, DR scans @300mA 
We reduced the electron cooler current to 300mA and continued measuring the DR spectrum.

[TABLE border="1"]
Entry  Wed May 14 08:24:39 2025, Danyal, Nils, Hendrik Day shift, Runs, DR scans @300mA 
Continuing with the measurements of the last shift, also at 300mA. Creating new file, as beam got killed during last run.

[TABLE border="1"]
Entry  Wed May 14 11:59:39 2025, Nils, Analysis, Current DR spectra 208Bi DR_208Bi_300mA_raw.pngDR_208Bi_300mA_Time_normalized_.png
Results so far for the DR scans @300mA e-cooler current.
Entry  Wed May 14 12:43:43 2025, Danyal, Nils, Hendrik Day shift, Runs, DR scans @300mA 
Continuing with the measurements of the last shift, also at 300mA. Creating new file, as beam got killed during last run.

[TABLE border="1"]
Entry  Wed May 14 19:06:51 2025, Carsten, Runs, Different pattern/ Fixes during the day new runs for 300 mA (increased intensities) DR_208Bi_300mA_optimized_ion_beam.pngDR_208Bi_300mA_optimized_ion_beam_cts.png
During the day several things were discussed concerning intensity and the pressurized air devicees.
In total 6 to 7 different things are not ok for a proper opreation of the devices (not to be discussed here).
Entry  Wed May 14 22:05:54 2025, Rodolfo, Laser, Laser settings 
Here are summarized some settings of the laser system.

[B]Dye:[/B] Pyrromethene 597 in Ethanol 
Entry  Thu May 15 00:45:19 2025, Carsten, DAQ, DRALS preliminary timing settings (DR part) 
[B]DAC control on sadpc115[/B]
[LIST]
[*] Total measurement window: 600 001 ms (10 min + 1ms)
Entry  Thu May 15 02:14:17 2025, Rodolfo, Konstantin, Simon , Laser, Laser broken IMG_1716.jpg
The pump laser is broken!

To be more specific the YAG crystal looks cracked (see att.) and we don't have a spare one.
Entry  Thu May 15 02:34:30 2025, Dimitrios, Konstantin, Simon, Accelerator, Ion beam position 
We measured the ion beam position with the T-scrapers. Not that the blades are 8mm wide, which must be considered to calculate the central beam position
where the laser must be aligned to.
Entry  Thu May 15 13:40:47 2025, Carsten, Runs, DR run DC with 300mA and very fine stepwidth 
Just changed settings towards a new scanning range and bunched beam.
NTCAP, now: IQ_2025-05-15_12-00-29
new ADC file
Entry  Fri May 16 03:19:23 2025, Dimitrios, Finn, Konstantin, Accelerator, Changed settings to DRALS setup 
Switched to bunching: Ring HF Bucket_fill(RF_manipulation)(SC7,BP2) changed from [3.0, 0.0] -> [3.0, 3.0]
Injections 5 | Breeding 30
Entry  Fri May 16 03:22:05 2025, Carsten, Dimitrios, Konstantin, Calibration, DR scan and HV Calibration against Schottky frequency (NTCAP) 
DR scan and HV Calibration against Schottky frequency (NTCAP).
Since DR measurements are presently running with DC beam we can easily do a calibration of cooler voltage against Schottky frequency at the end of the
DR scan.
Entry  Fri May 16 04:56:51 2025, Finn, Konstantin, Dimitrios, Runs, Night shift DR runs 
We conducted some more DR runes in this night shift at I_el = 300mA:

[TABLE border="1"]
Entry  Fri May 16 08:01:27 2025, Finn, Konstantin, Dimitrios, Detectors, Schottky channels 
1kHz read out trigger NTCAP

DC Trafo --> B1 SRC1
Entry  Fri May 16 08:19:00 2025, Danyal, Christopher, Hendrik, Runs, morning shift DR runs 
We are continuing taking more DR runes in the morning shift at I_el = 300mA:

opened new file
Entry  Fri May 16 11:09:38 2025, Danyal, Christopher, Laser, laser damage No_1.jpgNo_2.jpgNo_3.jpgNo_4.jpg
here are some pictures of the laser damage 

The Innolas technician is here now. 
The new crystal has arrived (Wilfried just delivered it). 
The old
crystal broke because of overheating. 
Entry  Fri May 16 15:25:54 2025, Rodolfo, Christopher, Laser, Pumplaser 
The pump laser is back into the operation. 

Output energy @ 532 nm: 690 mJ
Entry  Fri May 16 18:37:32 2025, Rodolfo, Carsten, Wilfried, Zoran, Ragandeep, Nils, Laser, Timing Screenshot_2025-05-16-18-31-35.png
After some minor adjustments for the laser done by Rodolfo, the laser is back 
at ESR and visible by the PD-SO.
We checked the timing between the cooling signal of the e-cooler and the 
Entry  Fri May 16 19:22:43 2025, Carsten, DAQ, New vlaues for DRALS  
The Timing for DRALS has changed to a 12 min measurement window (max time for laser scan). The duration of the laser ramp planned to be 10 min. So we have
2 mins to openfile / closefile etc.
Entry  Fri May 16 21:23:44 2025, Ragandeep, Rodolfo, Zoran, Nils, Accelerator, Ion and laser beam position screenshot-2025-05-16_21-44-5912125648191471033043.png
We checked the ion beam position as well as the laser position with the two scraper in front (north) of the e-cooler (GECEDS1VU, GECEDS1HA) and after (south)
the e-cooler (GECEDS2VU, GECEDS2HA). The values for the ion beam slightly changed in comparsion to the mesasurment performed in [URL=https://elog.gsi.de/esr/E0038/65]ELOG
65[/URL].
Entry  Fri May 16 22:15:33 2025, Ragandeep, Rodolfo, Zoran, Nils, Laser, Scan range laser 
The scan range according to Wilfried should be

593.15 nm - 592.55 nm
Entry  Fri May 16 22:50:00 2025, Ragandeep, Rodolfo, Zoran, Konstantin, Nils, Laser, Timing Laser + Ion Timing_208_DRALS.png
We adjusted the delay of the laser according to the signal of the PD and the PMTs.
Entry  Fri May 16 22:55:36 2025, Dimitrios, Finn, Konstantin, Laser, Starting first laser scan 2025-05-16_23-14-28-051.png
NTCAP file name: SC_2025-05-16_22-54-39

We are starting now the laser scans. Therefore we changed the HV offset voltage back to 880V. 
Entry  Sat May 17 08:36:20 2025, Wilfried, Christopher, Kristian , Laser, Laser Scans in coasting beam 
switched to coasting beam
bucketfill (RF manipulation) (SC7, ...): [[3.0],[3.0]] ---> [[3.0],[0.0]]
Entry  Sat May 17 11:57:13 2025, Wilfried, Christopher, Kristian, Laser, Scans with bunched beam 
switched to bunched beam
bucketfill (RF manipulation) (SC7, ...): [[3.0],[0.0]] ---> [[3.0],[3.0]]
Entry  Sat May 17 21:06:52 2025, Rodolfo, Christopher, Kristian, Laser, New dye 
We have exchanged the dye laser and filled the dye pumps with fresh dye. We also noticed that the seeder was off, we turned on again and set the pump energy
to 350 mJ (at 532 nm).
Entry  Sat May 17 21:27:17 2025, Wilfried, Rodolfo, Laser, Scraping the laser beam Laserspot_at_SO_2025-05-17.JPG
The beam stabilization in not working properly. So we have turned it off. We also scraped the laser beam at the E-Cooler and bring the laser beam to the
right position.
Entry  Sat May 17 21:40:40 2025, Wilfried, Rodolfo, Hendrik, Ragandeep, Yuri, Laser, Eveningshift data runs  

[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | ESR intensity SC8 / 1e6 | Typical SIS injections / 1e9 | NTCAP file | comments |-
Entry  Sun May 18 00:25:08 2025, Finn, Konstantin, Dimitrios, Laser, Nightshift data runs 
Took over from afternoon shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | ESR intensity SC8 / 1e6 | Typical SIS injections / 1e9 | NTCAP file | comments |-
Entry  Sun May 18 01:47:56 2025, Konstantin, DAQ, Particle detector ParticleDetectorModulation.png
The attachment shows the signal of the particle detector for bunched beam (red, files 104-112) coasting beam (black, files 113-117) as a function of the
time for one cycle of the DRALS pattern. One can identify modulations of the signal during the cooling step in both traces. However, there are some clear
differences:
Entry  Sun May 18 02:24:46 2025, Wilfried, Rodolfo, Carsten, Detectors, Antrieb Cu-Mirror defekt 
On Saturday afternoon we moved the Cu mirror to the inner position, however an issue appeared when we tried to move the mirror to the "park" position. The
stepping motor did not react properly, it clamped. After restarting the software we could actually move the mirror out, but the stepping motor as well
as driving system made a lot of noise until the parking position was reached. This issue has to be investigated specialists after the beamtime. 
Entry  Sun May 18 04:33:46 2025, Dimitrios, Finn, Konstantin, Laser, Laser position 
We changed the position of the laser back to the position which was set up in [COLOR=blue][B][URL=https://elog.gsi.de/esr/E0038/85]E 85[/URL][/B][/COLOR]
by changing the motor position of motor 4 in the kangoo software at ATPPC031 from -0.1 to -0.3.
Entry  Sun May 18 08:06:55 2025, Danyal, Christopher, Jonas, Runs, morning shift 2025-05-18_11-10-39-917_tcl1146.pngBildschirmfoto_2025-05-18_12-22-37.png2025-05-18_14-19-08-249_tcl1146.png
Took over from night shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | ESR intensity SC8 / 1e6 | Typical SIS injections / 1e9 | NTCAP file | comments |-
Entry  Sun May 18 16:08:58 2025, Wilfried, Carsten, Rodolfo, Hendrik, Runs, Afternoon shift, continued measurements Bildschirmfoto_2025-05-18_21-10-46.png
Took over from morning shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | ESR intensity SC8 / 1e6 | Typical SIS injections / 1e9 | NTCAP file | comments |-
Entry  Sun May 18 21:30:20 2025, Wilfried, Rodolfo, Markus, Zoran, Accelerator, T-Scrapers, Update 
Here are the right instructions to drive the T-Scrapers inside the ESR Electron Cooler

[LIST]
Entry  Mon May 19 00:28:40 2025, Simon, Finn, Runs, Night shift measurement Bildschirmfoto_2025-05-19_05-56-15.pngBildschirmfoto_2025-05-19_05-56-41.png
Took over from afternoon shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | ESR intensity SC8 / 1e6 | Typical SIS injections / 1e9 | NTCAP file | comments |-
Entry  Tue May 27 10:56:44 2025, Konstantin, DAQ, Common stop 
The common stop was wired through a 1:2, and subsequently through a 1:99 rate divider channel. However, since the pulse width was too long, the 1:2 channel
was translated into a 1:4 reduction. This must be considered, when the data is processed via go4. The reduction factor in the SetParameters.C file must
be set to 198 accordingly.
ELOG V3.1.5-fc6679b