HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, all entries  Not logged in ELOG logo
Entry  Thu Sep 13 11:32:17 2018, Jan Glorius, Collaboration, Proposal E121_Litvinov.pdfE121_Approval.pdf
Attached is the beam time proposal submitted and accepted by the G-PAC in 2017.
Entry  Mon Dec 3 15:06:04 2018, Chen, Sidhu, DAQ, Test of two preamplifier. 20181121_ElectronicCircuits_1.png20181121_ElectronicCircuits_2.png20181121_ElectronicCircuits_3.png20181121_ElectronicCircuits_4.png
[B]Description:[/B]
   We have two pre-amplifiers:
   New: Max. range 5GeV, Two sensitivity options: 1 GeV and 5 GeV,  Decay time = 30 us, pulse input 220 MeV/u, Ser. #MPR-32-D-5000-30-1118380.
Entry  Wed Dec 5 17:29:24 2018, Chen, Sidhu, Detectors, signal map 13x
[B]Description:[/B]

  Here is a summary of signal map. The charged particle detector includes 6 layers of Si-Pad, 1 DSSD and 1 CsI. 
Entry  Fri Dec 7 10:56:04 2018, Jan Glorius, SlowControl, EPICS ioc on raspberry 
We have an EPCIS server (ioc) running on our raspberry (ext-027377). It talks to our MesyTec modules (MSCF shapers, MHV4 high-voltages).
In principal it should be running all the time, but here is the manual how to check/start it:
Entry  Fri Dec 7 11:39:41 2018, Jan Glorius, SlowControl, GUI for remote control of MSCF+MHV4 
We have a GUI for remote controlling our MesyTec modules MSCF16 and MHV4 for E121 experiment.

Here is the instructions to run it:
Entry  Mon Dec 10 11:59:15 2018, Chen, Sidhu, Detectors, Test of shaping amplifier. TestOfShapingAmplifier.jpg20181207_Test_of_shaping-amplifier2.jpg20181207_Test_of_shaping-amplifier3.jpg20181207_Test_of_shaping-amplifier4.jpg
[IMG]elog:6/1[/IMG]

[IMG]elog:6/2[/IMG]
Entry  Tue Mar 12 12:54:58 2019, Chen, Sidhu, DAQ, how to start DAQ and plot histogram. 000000000001_edit.png55_PM.pngdrawing-1.png
[B]1. login litv-exp account[/B]
rchen@lxg1254:/data.local2/2002_238UIMS$ ssh -X litv-exp@lxg0155.gsi.de
(don't login on lx-pool.)
Entry  Tue May 7 15:52:47 2019, Chen, Sidhu, SlowControl, GUI for remote control of MSCF+MHV4 [detailed] 000000000003.png
We have a GUI for remote controlling our MesyTec modules MSCF16 and MHV4 for E121 experiment.

Here is the instructions to run it:
Entry  Tue May 28 08:36:14 2019, Jan, DAQ, MBS start & RFIO server 
You need a DAQ-PC and the RIO crate computer.
All of the DAQ proceedures laid out here are operated from inside the DAQ screen session.
Right now for e121 the following DAQ-setup is used: (might change in the future)
Entry  Wed Jun 26 16:20:31 2019, Jan, DAQ, unpacker: lmd > root E121.specdet_mapping.hh
I have written an unpacker for the lmd data taken with the current daq-system for E121.
The crate configuration is as follows:
ADC1 channels 1-32 (Caen 785)
Entry  Tue Aug 27 14:53:47 2019, Chen, Sidhu, Detectors, The thickness uncertainty of Ta is less than 1%.  20180711ChargeParticleDetectorV8.png20180711ChargeParticleDetectorV8.png2019_08-Ta-Blech.xlsx
The thickness of Ta plate have been measured by target group. The result is show as following.
According to this measurement, the thickness uncertainty is less than 1%. 
This thickness uncertainty is good enough for Tl experiment. 
Entry  Thu Oct 24 15:36:13 2019, Chen, Sidhu, Detectors, Detector installation process Detector_installation_process1.pngDetector_installation_process2.pngDetector_installation_process3.pngDetector_installation_process.pdf
[IMG]elog:12/1[/IMG]
[IMG]elog:12/2[/IMG]
[IMG]elog:12/3[/IMG]
Entry  Wed Jan 29 10:42:42 2020, Shahab, General, Gas target control with the new control system event IMG_20200128_153508.jpgIMG_20200128_145345.jpgIMG_20200128_145340.jpgIMG_20200128_145307.jpgIMG_20200128_144555.jpg

Many thanks to Sergey and Nikos we have tested the connection of the new control system for turning on and off of the gas target.
Entry  Fri Feb 21 11:30:52 2020, Laszlo, General, Shift plan 
e127: https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0

e121: https://docs.google.com/spreadsheets/d/10MUzA5-Ilf2WzCyNj8u_KSG6yzPg0e4vtZGGPFB3K-k/edit#gid=0
Entry  Tue Feb 25 15:48:31 2020, ruijiu chen, DAQ, Important folders of e121 eperiments: 
1. slow control:
1.1. program file:
litv-exp@ringpi:~/epics/mrcc_ioc/db $ 
Entry  Tue Feb 25 15:49:58 2020, ruijiu chen, DAQ, changing scaling factor. 
How to change scaling factor?
The parameters is in f_user.c file:
1. open the f_user.C with emacs :
Entry  Thu Feb 27 14:04:12 2020, Ruijiu Chen, Detectors, Remote control of HV module 20180711ChargeParticleDetectorV8.jpg
Be careful. The voltage value on user interface is 10 times of real value. e.g. if the real value is 32V, the voltage value on UI has to be 320V. 
[IMG]elog:17/1[/IMG]
Entry  Thu Mar 26 17:21:40 2020, Ragan, General, Stochastic cooling 
1) From SIS, 206Pb67+ @401.17 MeV/u goes to FRS where only SEETRAM is placed in the target area to strip off 206Pb67+ to get 206Pb81+.
2) There is 206Pb81+ (H-like primary beam) inside ESR at 400 MeV/u.
3) The ESR team is now trying Stochastic cooling with 206Pb81+ beam at 400 MeV/u.
Entry  Fri Mar 27 13:02:07 2020, Ragan, General, Stochastic cooling stochastic_cooling.PNG
1) ESR team is successful with the Stochstic cooling of primary H-like 206Pb81+ beam @400 MeV/u.
2) Now, they are trying for stacking of the beam.
Entry  Fri Mar 27 13:04:17 2020, Ragan, General, FRS Settings until now frs.pdfFRS.pdf
Yuri and Helmut have been extensively involved in tuning and optimizing of the FRS.

26th March, 2020 (Evening setting):
Entry  Fri Mar 27 13:40:54 2020, Ragan, General, NTCap start and shutdown information ntcapmanual.pdf
The attachment contains information on how to start and shutdown NTCap and bridge computer.
Entry  Fri Mar 27 19:51:37 2020, Ragan, General, ESR Machine 
By changing the tune to Qx=2.33, Qy=2.36 the momentum acceptance was significantly improved. A variation of the cooler voltage of 10300 V was possible without
beam loss. That corresponds to a momentum acceptance of 2.7 %. That should provide good conditions for longitudinal stacking.
Entry  Fri Mar 27 19:59:09 2020, Ragan, General, Beam stacking in ESR is achieved 8B7F254E-DB10-48B6-9E2E-9CA0FF998C12.MOVstacking.png
Thanks to Sergey and Markus, stacking of primary H-like 206Pb81+ beam in ESR is achieved.

The stacking of the primary beam was established. There is continuous cooling on the injection orbit by stochastic cooling and by electron cooling on the
Entry  Fri Mar 27 20:05:43 2020, Ragan, General, H2 gas jet ready BAFA7906-5F66-4108-86F9-6D61573B43CD.MOV
Thanks to Nikos, stable H2 gas jet target with 10^14 particles/cm^3 is ready.
(More information can be found on: https://ulpc24.gsi.de/cgi-bin/jet.py?gasart=Helium )
Entry  Fri Mar 27 20:52:31 2020, Ragan, General, Plans for the measurement with 206Pb81+ 
We plan to measure:

1. Lifetime of H-like 206Pb81+ beam with two electron cooler currents:
Entry  Sat Mar 28 01:14:19 2020, Ragan, General, Cross-section for capture and ionisation of 206Pb81+ with H2 target  GLOBAL.pdf
Cross-section for capture and ionisation of 206Pb81+ with H2 gas jet target are calculated using GLOBAL code.
The ionisation (on CsISiPHOS) and capture (on MWPC) trigger rates are calculated for 206Pb81+ beam with 10^6 particles revolving in ESR ~2 MHz frequency
with H2 gas jet target density ~ 10^14 particles/cm3.
Entry  Sat Mar 28 04:32:15 2020, Ragan, Detectors, Ionisation events on DSSSD 9800D808-D570-466D-8411-512D069F9233.jpeg
XY co-relation of DSSSD showing 206Pb82+ beam hitting the CsISiPHOS detector present in the inner pocket of ESR after the first dipole after the gas jet.
206Pb82+ is 
produced by ionisation of 
Entry  Sat Mar 28 04:50:34 2020, Ragan, Detectors, MWPC 4475A53F-48AB-430E-8A22-7D92E5FEACBF.jpeg
Alex and Pierre-Michel applied 1500 V to the anode and adjusted the threshold in Messhute.
x1 signal was small & noisy and rest of the signals were fine.
Entry  Sat Mar 28 11:00:14 2020, Ragan, RuiJiu, Mei, Yuri, Tino, Detectors, Movement of detector IMG_20200328_110253.jpgIMG_20200328_110258.jpg
10:51 am the CsISiPHOS is moved to 65 mm from 60 mm.The spot on the DSSSD is changed by 5 mm which confirms the hit of the beam.

11:05 
Entry  Sat Mar 28 11:07:49 2020, Ragan, RuiJiu, Tino, , General, Nikos is changing gas jet target 
The gas jet target is now being changed from H2 to Ar by Nikos.
Entry  Sat Mar 28 11:20:10 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, Reducing beam intensity in ESR 
Yuri reduces beam intensity in the ESR to reduce the countrate on the detectors.
Entry  Sat Mar 28 11:28:11 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, ESR open 
ESR is open now
Entry  Sat Mar 28 12:19:21 2020, Ragan, RuiJiu, DAQ, Change of the polarity of Amplifiers 7888530B-DE66-4D37-A0A8-933307DD2AB8.MOV
Since last night, the signals from the p-side of all the Si pads were seen as negative on picoscope.
The signals from DSSSD, all n-sides of Si pads and CsI were positive which all are in MSCF-5.
Thus, I and RuiJiu, changed the polarity jumpers of MSCF 1,2,3 and 4(all the four jumpers inside the mentioned MSCF) and now hope to see positive signals
Entry  Sat Mar 28 13:09:11 2020, Mei,Yury, Tino, Ragan, Ruijiu, General, Shift plan 
From Yury,

For now, measure the beam life time with 3 different electron current in the e-cooler,i.e. 200mA(default), 10mA, and 20mA. For each current, 4 sets of
Entry  Sat Mar 28 13:19:56 2020, Ragan, Runs, Template 
beam: 
energy: 
storage time:
Entry  Sat Mar 28 14:19:24 2020, Ragan, RuiJiu, Mei, Yuri, General, Instructions to change the electron cooler current instructions.pdf
Attached are the instructions on how to change the electron cooler current for the lifetime measurements of 206Pb81+ beam (interaction with residual gas
and electron cooler).
Entry  Sat Mar 28 15:07:40 2020, ruijiu, DAQ, start run  
 
Entry  Sat Mar 28 15:19:23 2020, ruijiu, , start run e121_run_0236.lmd 
store 206Pb81+ beam inside ESR and measure its halflife. 
The HV of detector is off.
Start DAQ to record the ESR current in lmd file.
Entry  Sat Mar 28 15:23:05 2020, Alex, Ragan, Mei Bai , General, beam lifetime measurement 15854053877798703970476301545600.jpg
We see two species in the Schottky spectra during the beam lifetime measurement without the target. The one (probably the primiary beam) is significantly
better cooled than the other.
So, we were wondering what is the other beam? Maybe the recombined ones?
Entry  Sat Mar 28 16:09:50 2020, Alex, General, no beam in the ESR 
Ragan and Ruijiu went in the ESR for short time to fix something with the slow control of the silicon detector.
After this, there is no beam in the ESR.
Entry  Sat Mar 28 16:12:25 2020, ruijiu, ragan, DAQ, enter ESR and turn on the HV crate. 
 
Entry  Sat Mar 28 16:29:27 2020, Ragan, RuiJiu, Esther, General, Malfunction of several ESR machines 
The HKR crew informs us that several machines in ESR are showing malfunctions.
The on-call expert cannot be reached.
Entry  Sat Mar 28 18:11:13 2020, Alex, Yuri, General, no beam in the ESR 
Yuri and Sergey (on phone) have investigated extensively the problem with having no beam in the ESR. The FRS has been checked and seems OK. The ESR is fine
as well.
The problem seems to be the timing. Ths SIS and the ESR seem to be completely out of synchronization. The on-call service for the control system has been
Entry  Sun Mar 29 09:40:35 2020, ruijiu, DAQ, restart go4 IMG_20200329_093354.jpg
go4 crush up. 
the problem is 
due to  mbs. 
Entry  Sun Mar 29 09:57:26 2020, ruijiu, Detectors, the HV of charged particle detector IMG_20200329_095014.jpg
        MHV1     MHV2
ch1:1st Sipad  4th 
Sipad
Entry  Sun Mar 29 10:09:14 2020, ruijiu, , start run e121_run_0237.lmd 
Sergey and Yuri are tuning Tl beam. The particle number in ers is about 1e4. I(SIS)=5e8
run stop: after few minutes (garbage data)
Entry  Sun Mar 29 11:12:00 2020, Ragan, Runs, start run e121_run_0239.lmd  
Sergey and Yuri are tuning Tl beam. The particle number in ers is about 1e4. I(SIS)=5e8

some events on MWPC can be seen !
Entry  Sun Mar 29 12:56:02 2020, Ragan, RuiJiu, General, Good positive signals from MSCF E1DF3452-4051-4EFF-ADC2-519389D0E60F.MOV
As we (RuiJiu and me) changed the jumpers of MSCF 1, 2,3 and 4 yesterday, now we see nice positive signals on picoscope.
Yuri and Sergey are still working on optimising the Tl fragments !
Entry  Sun Mar 29 13:04:32 2020, Ragan, RuiJiu, Runs, run file: 1298 61308F61-2C4C-4651-8C74-608E4E585B14.jpegEB5CA42A-B8DC-4892-8357-9006A1C3BAC0.jpeg
The Tl fragments are being stacked (almost ~20 staacks) and tried to store nicely in ESR.
The plan is to see the number of contaminants on the inner detector (CsISiPHOS) after the gas jet is on (Ar gas jet) and minimise this number for different
FRS settings !!
Entry  Sun Mar 29 13:05:36 2020, ruijiu, DAQ, start ntcap IMG_20200329_130438.jpg
IQ_2020-03-29_13-05-
56
SC_2020-03-29_13-05-
Entry  Sun Mar 29 13:43:46 2020, , ,  5765BDDD-C10A-44AD-AF85-07134B06F34E.jpeg
 
Entry  Sun Mar 29 14:01:45 2020, ruijiu, , beam position on DSSD IMG_20200329_140003.jpg
move the detector 1cm 
outside.from 60mm to 
70mm.
Entry  Sun Mar 29 14:29:13 2020, ruijiu, , e121_run_00240.lmd 
s6 positon at 50mm.
Entry  Sun Mar 29 18:41:31 2020, ruijiu, Analysis, Ratio between MPWC rate and DSSD rate ratio.png
slit Ratio error
-1 18.64 0.4
-2 18.18 0.38
Entry  Sun Mar 29 18:55:19 2020, Shahab, Runs, Frequency list for identification freqs.jpg
Here are some frequencies for identification of the fragments.

Center freq: 243.352675
Entry  Sun Mar 29 20:32:20 2020, Ragan, General, Template for Pb halflive measurement 
beam: 
energy: 
Entry  Sun Mar 29 21:02:43 2020, ruijiu, Analysis, decay line of 205Tl beam main_s6_neg8_202003292059.pngmain_s6_neg8_202003292059.root
decay line of 205Tl beam with Ar gas jet target on and S6 slit at -8mm
Ar gas density~1e12 atoms/cm2
Entry  Sun Mar 29 21:34:46 2020, Ragan, Runs, First run 
beam: 206Pb81+
energy: 400 MeV/u
Entry  Sun Mar 29 21:39:27 2020, ruijiu, Analysis, Ionization cross section and capture cross section for h-206Pb + Ar 202003292141.png
Ionization cross section = 1320 barn.
Capture cross section = 557+137+44.5=735.5.
sigma_Ion/sigma_cap=1.79
Entry  Sun Mar 29 21:55:47 2020, Ragan, General, MWPC Comparison.png
Alex goes to Messhute to check the signals from MPWC. After he completes, we start with the measurements with the primary beam )
Entry  Sun Mar 29 23:48:12 2020, Jan, Analysis, run0251: E_spectra for CsISiPhos  14x
This is a collection of energy spectra of the CsISiPhos detectors from run0251 with primary beam.

There is no good spectra for n-side of Si-pad 1!
Entry  Mon Mar 30 00:32:32 2020, Ragan, Runs, First measurement with 206Pb81+ beam 
beam: 206Pb81+
energy: 400 MeV/u
Entry  Mon Mar 30 01:01:53 2020, Ragan, Runs, First measurement with 206Pb81+ beam 
beam: 206Pb81+
energy: 400 MeV/u
Entry  Mon Mar 30 01:07:29 2020, Ragan, General, Problem with SIS runstop: 0256 
There is problem with SIS
Run stop: 0257.lmd (at1:06)
Entry  Mon Mar 30 01:25:57 2020, Ragan, Runs, First measurement with 206Pb81+ beam 
01:17 Problem with SIS is solved
01:19 run start 0258.lmd
Entry  Mon Mar 30 01:43:58 2020, Ragan, General, First measurement with 206Pb81+ beam pattern details 90FC7D41-6C97-4760-B5A3-3CF60643A405.jpegBF20DBD8-1672-4817-8412-13B29CBF2E0A.jpeg
The following shows the pattern for first measurement in ESR (gas jet is on for = 60*5 secs = 300 secs as it can be seen on step SC7 in pattern).
One injection cycle runs for ~ 6 mins.
Entry  Mon Mar 30 02:00:46 2020, Ragan, Runs, First measurement with 206Pb81+ beam 

beam: 206Pb81+
energy: 400 MeV/u
Entry  Mon Mar 30 02:27:44 2020, Ragan, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
I_cooler = 200 mA

beam: 206Pb81+
Entry  Mon Mar 30 02:58:51 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
I_cooler = 200 mA

beam: 206Pb81+
Entry  Mon Mar 30 03:30:03 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
I_cooler = 200 mA

beam: 206Pb81+
Entry  Mon Mar 30 04:00:19 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
I_cooler = 200 mA

beam: 206Pb81+
Entry  Mon Mar 30 04:15:29 2020, Ragan, General, Second measurement with 206Pb81+ beam at I_cooler = 200 mA 1A7AE154-6A88-4AED-BA5D-748025FCD226.jpeg
In the picture below, a very nice storage of 206Pb81+ at 200 mA electron cooler current for no gas jet target can be seen in ESR. The measurement started
at 02:24 and we will now finish it in 5-10 mins. We will now do two more measurements for I_cooler = 10 mA ans 20 mA.
Entry  Mon Mar 30 04:30:17 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA  
I_cooler = 200 mA

beam: 206Pb81+
Entry  Mon Mar 30 06:15:13 2020, Ragan, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 06:30:52 2020, Ragan, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 06:34:47 2020, Ragan, General, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  C7A2736D-9C0A-4531-A768-85A55943EB5A.jpeg
In the ESR picture below, the decay of beam is very fast initially for few minutes and then the decay is constant. But why does it decay for first few minutes
?
Entry  Mon Mar 30 07:02:15 2020, tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 07:34:06 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 08:00:40 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 08:32:05 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Mon Mar 30 08:56:04 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  
I_cooler = 10 mA

beam: 206Pb81+
Entry  Mon Mar 30 09:26:37 2020, Tino, Runs, Stopped Second measurement with 206Pb81+ beam at I_cooler = 10 mA  
Stopped Data recording for Restart of the measurement

I_cooler = 10 mA
Entry  Mon Mar 30 09:34:02 2020, Tino, Runs, Restart of second measurement with 206Pb81+ beam at I_cooler = 10 mA  
Stopped Data recording for Restart of the measurement

I_cooler = 10 mA
Entry  Mon Mar 30 10:01:31 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 10:32:01 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 10:57:43 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 12:12:25 2020, ruijiu, General, Instruction of NTCAP for shift person Instruction_of_NTCAP_for_shift_person.png
To start a new run with NTCap, we need to retart NTCAP. 
1. Stop labview program. 
2. Start labview program and start a new run.
Entry  Mon Mar 30 12:16:04 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 12:33:04 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 13:02:49 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 13:31:58 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 13:40:57 2020, ruijiu, Detectors, HV of Inner detector IMG_20200330_133909.jpg
 
Entry  Mon Mar 30 13:41:20 2020, ruijiu, Detectors, HV of Inner detector IMG_20200330_133909.jpg
 
Entry  Mon Mar 30 14:02:41 2020, Tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 10 mA  


I_cooler = 10 mA
Entry  Mon Mar 30 14:24:46 2020, ruijiu, DAQ, stop taking data. 
1. stop run0272.lmd.
2. stop NTCAP. 
  NTCAp file:
Entry  Mon Mar 30 14:48:02 2020, ruijiu and Tino, Detectors, The leakcurrent of SiPad is over the setting limit. Screenshot_20200330-145551.jpgScreenshot_20200330-145544.jpgIMG_20200330_144915.jpg
Because the 
leakcurrent of 
6 Sipads is 
Entry  Mon Mar 30 15:03:58 2020, ruijiu Tino, Yuri, Lasoro, Nik and Uli, Detectors, the gas bottle is empty. IMG_20200330_152735_mh1585575780057.jpg
The gas bottle was empty. Tino replaced 
the previous old bottle with 50 bar gas left. 
Entry  Mon Mar 30 16:25:05 2020, ruijiu, Detectors, turn down the HV 
turn down the hv and pull out the detector.  

suggest by 
Entry  Mon Mar 30 16:37:53 2020, ruijiu, Analysis,  
 
Entry  Mon Mar 30 20:51:06 2020, Ragan, Detectors, Bias Voltage for Si-pads Si_pad_bias-voltage.ods
The limit of the leakage current for all Si pads was increased from 1500 nA to 5000nA and 
leakage current was recorded for different Bias Voltages (32V, 35V, 40V, 45V, 50V, 55V 
and 60V).
Entry  Mon Mar 30 23:30:35 2020, Jan, Analysis, run251 - Si-pad performance & status 7x
Attached are plots for Si-pad 2 with hits from ionization of 206Pb81+ at the target.
The plots are representative for all Si-pads, the pattern is always the same!
Entry  Tue Mar 31 00:47:18 2020, Yuri, Runs, S2 slits 0/+35 mm, target bump +13 mm 
Run start: 0276.lmd
Entry  Tue Mar 31 15:30:43 2020, ruijiu, Analysis, The beam position on DSSD with different conditions on on the dEE spectrum 6x
I analyzed the first measurement with 206Pb81+ beam, run 250-267. 
Entry  Tue Mar 31 20:32:05 2020, Ragan, General, 203Tl80+ 200Hg79+ 205Tl81+ 85AD7203-736C-4531-BA80-D045CC690BED.jpeg
Below in the schottky spectrum, on left is 203Tl80+ contamination, in middel is 200Hg79+ contamination and on right most is 205Tl81+.
These contaminations cannot be seen on CsISiPHOS but can only be seen on schottky.
The goal now is to get rid of these contaminations by putting slits.
Entry  Tue Mar 31 20:50:05 2020, Ragan, General, 200Hg79+ 205Tl81+ 31E7D028-F469-4BFF-B683-203821C174E9.jpeg
203Tl80+ impurity is removed by moving scrapper inside ESR.
Only 220Hg79+ is left now
Entry  Tue Mar 31 21:07:05 2020, Ragan, General, Separation of 203Tl80+ and 200Hg79+ using scrapper in ESR 06B012F5-5435-41D7-AD82-4A5FDADF281E.MOV
It can be seen in the video how 203Tl80+ (on extreme left) and then 200Hg79+ (in middle originally) is separted from 205Tl81+ by using scrapper in ESR.
Now, we want 205Pb81+ mixed with 205Tl81+ to be separated as much as possible in FRS.
Entry  Tue Mar 31 23:31:41 2020, Shahab, Runs, alpha_p calibration ap_calibration.jpg
Vc = 212849.9349
Ic = 0.2
Entry  Wed Apr 1 01:02:24 2020, ruijiu, Detectors, the detector cable is disconnected. 
 
Entry  Wed Apr 1 01:05:36 2020, ruijiu, Detectors, detector position fixed at 60 mm VID_20200401_010416.mp4
The detector cable was disconnected . We entered and reconnected the cable.
Entry  Thu Apr 2 02:36:48 2020, Ragan, General, Stochastic cooling and orbit problem 
On 1 April by 5 pm, we could stop the stochastic cooling after the stacking process and also change the orbit of the Tl beam to centre. 
Thanks to the efforts by the ESR team !
Entry  Thu Apr 2 02:38:32 2020, Ragan, Yuri, Sergey, Esther, Oliver, Runs, First measurement with zero storage time 
beam: 205Tl81+ (with no scraping)
energy: 400 MeV/u
storage time: zero
Entry  Thu Apr 2 02:46:57 2020, Ragan, Yuri, Sergey, Esther, Oliver, Runs, Measurement with 2 hrs storage time E682FBC9-1374-4582-8202-C8AA5DC8E6D5.jpeg


Entry  Thu Apr 2 05:00:44 2020, Ragan, Esther, Oliver, Runs, Second measurement with 2 hrs storage time 734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg
Electron cooler was off here. Thus, this measurement is not what we needed.
(in the picture below, it can be seen that the beam is not cooled)
Entry  Thu Apr 2 06:25:13 2020, Ragan, Runs, Template 
beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: ___ hrs
Entry  Thu Apr 2 07:01:32 2020, Ragan, Esther, Oliver, Runs, Measurement with 4 hrs storage time 
beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 4 hrs
Entry  Thu Apr 2 09:21:19 2020, Ruijiu, Runs, 2nd measurement with 2 hrs storage time (repeat) IMG_20200402_092631.jpg
Because the electron cooler was not switched on during beam accumulation in the previous measurement, we repeat this measurement again.
(In the picture below, it can be seen that the beam cooled. On right most is the Tl beam and rest are the contaminants.)
Entry  Thu Apr 2 12:52:25 2020, ruijiu, General, setup FRS with 2 g/cm2 degrader. 
Yuri sets up FRS with 2 g/cm2 degrader (previous one is 1 g/cm2). The ESR is not changed. The contamination should be less now.
Entry  Thu Apr 2 15:24:15 2020, Ragan, General, How to know whether electron cooling is working IMG_8238.JPGIMG_8239.JPG
For Alle and Kuehler the bottom left status should look like as shown in pictures below.
Entry  Thu Apr 2 21:03:40 2020, Ragan, Yuri, Sergey, Nikos, Runs, Zero hour measurement (S2:-10/35 mm) 
beam: 205Tl81+ (no scraping, Al ~1g/cm2)
energy: 400 MeV/u
storage time: zero hrs
Entry  Thu Apr 2 21:10:57 2020, Ragan, Yuri, Sergey, Nikos, Runs, One hour measurement (S2:-10/35 mm) 
beam: 205Tl81+ (no scraping, Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hrs
Entry  Thu Apr 2 21:12:39 2020, Ragan, Nikos, Pierre-Michel, Dima, Runs, Three hour measurement (S2: 0/35 mm) 46CBD7E3-0AF1-447C-847E-31BA5224684D.jpeg7A404038-88E9-4CAF-91E3-A26A0F8A51EF.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 3 hrs
Entry  Fri Apr 3 00:39:07 2020, Ragan, Pierre-Michel, Dima, Runs, Half hour measurement (S2: 0/35 mm) CC419497-E2AA-4C71-92AD-7F282775FFC2.jpegAB10D6CB-87FC-4D9E-9AF0-AA9279D62066.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Fri Apr 3 01:22:13 2020, Ragan, Pierre-Michel, Dima, Runs, One hour measurement (S2: 0/35 mm) 8E469F1D-992F-4E96-A30A-022B0D1A0E5A.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
Entry  Fri Apr 3 03:18:06 2020, Ragan, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm) 3C7167D2-5B67-4A2A-BB16-76DE5DCE6D7F.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Fri Apr 3 03:19:46 2020, Ragan, Pierre-Michel, Dima, Runs, Half hour measurement (S2: 0/35 mm) FD4F77A6-57C8-40EE-A5D6-B8E84D87C0EF.jpegD9AB6DAC-8CB1-4AA6-8D65-EF0BEB1BC913.jpeg7ECADF49-BD0A-4AB0-82E3-8825C08C81E3.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Fri Apr 3 03:59:14 2020, Ragan, Pierre-Michel, Dima, Runs, Two hour measurement (S2: 0/35 mm) 2B409195-AF78-46AA-9B5B-F0990B564238.jpegED3309B6-82E5-4484-A787-ADF94FD55814.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 2 hr
Entry  Fri Apr 3 04:36:21 2020, Ragan, Pierre-Michel, Dima, General, Electron cooler problem which was then solved 
04:09 Electron cooler had some problem when we were stacking for 2 hours measurement.
04:20 GECEBG2T and GECEBG5T were Reset and then Switched on. Electron cooler started working again
Entry  Fri Apr 3 06:35:37 2020, Ragan, Pierre-Michel, Dima, Mei, Shahab, Runs, Half hour measurement (S2: 0/35 mm) A04655E8-EF30-4ECB-A6F4-2B98982502FA.jpegAE7CF1AD-0E03-45AA-8234-D36D34E85252.jpeg95BAD6CD-5C2E-4B93-8CE5-0F7F6E62B4FA.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Fri Apr 3 10:06:15 2020, Shahab, Runs, Plots from Scopes magnets.pngkicker.png
Just two plots from the scopes for documentation:

magnets.png:
Entry  Fri Apr 3 11:52:27 2020, Shahab, Runs, Stacking 54 times! 2020-04-03_11-48-11-781.png
 
Entry  Fri Apr 3 11:59:50 2020, Ragan, Pierre-Michel, Dima, Runs, Four hour measurement (S2: 0/35 mm) 708F0673-2D65-4EFA-902F-7067FA5885B4.jpeg8D6B87F7-B622-41B6-8CBC-E6404443987F.jpeg2D175AD1-813B-4C6B-93E0-43B90EFE2584.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
Entry  Fri Apr 3 12:02:32 2020, Ragan, Mei, Shahab, Runs, Half hour measurement (S2: 0/35 mm) 44FE81B4-D167-4B4D-9E6E-D0C54CD79F23.jpeg6FFE01F8-FC91-4A7A-A8E0-52BFC068DD27.jpeg19EBC2DF-C029-4655-A697-7CD69C6E4ADF.jpeg68740E5C-468F-476A-9D81-FC3D4995D61E.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Fri Apr 3 13:21:16 2020, Ragan, Mei, Shahab, Runs, Zero hour measurement (S2: 0/35 mm) 8560F317-7B65-476E-84EF-CFFB9C021878.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Fri Apr 3 13:39:58 2020, Ragan, Mei, Shahab, Laszlo, Runs, Eight hour measurement (S2: 0/35 mm) A9A3E9A0-85E9-4A47-93FA-5D722730FCFC.jpegB24C41F3-BD4D-4400-9A30-B9CEF7928BBE.jpeg7B276C07-1E38-4858-924E-DFEC12F10578.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 8 hr
Entry  Fri Apr 3 14:08:41 2020, Shahab, Runs, Stacking 2020-04-03_14-07-13-250.png
 
Entry  Fri Apr 3 17:55:13 2020, Shahab, Runs, Nice picture from 205-Tl Tl-daughter_spurs.PNG
In this high contrast Schottky recording, the main three frequency peaks are resolved w.r.t. time from left to right:

203 Hg 80 +, 200 Hg 79+ and 205 Tl 81+
Entry  Sat Apr 4 00:00:20 2020, Ragan, Laszlo, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm) 0453DD6F-453B-4751-96A3-D9D1CD808CD5.jpeg99B7B973-C12E-4621-BD2B-DDF1D6753DF2.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Sat Apr 4 00:11:23 2020, Ragan, Pierre-Michel, Dima, Runs, Half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 55E962C4-6891-44E5-937B-5D11AC0FEFCD.jpeg9F371840-1E58-45D2-9EF9-273D72C28626.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sat Apr 4 00:40:29 2020, Ragan, Pierre-Michel, Dima, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm) D6F92CFB-C5D3-4A7E-BEEC-4DB50BDA1CB5.jpeg8DC5D5E0-C8B0-4614-A826-1692982FB75F.jpeg67EEB2B9-5D29-45A3-BB4E-D9E466F0716E.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Sat Apr 4 03:06:12 2020, Ragan, General, Instructions if electron cooler goes off during long storage time measurements electron_cooler.pdf
Please read the attachment.
Entry  Sat Apr 4 03:27:48 2020, Ragan, Pierre-Michel, Dima, Shahab, Runs, Six hour measurement (S2: 0/35 mm and S6: -20/7 mm) 06F75D44-5DC0-4EF5-A574-C79E559EA8E0.jpegE0E0700F-4164-44C8-86D8-8F782D4A81E6.jpeg689A47E2-D32B-4721-A6F8-F4FC53BB513E.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 6 hr
Entry  Sat Apr 4 10:32:16 2020, Ragan, Shahab, Runs, Five hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_10-46-44-779.png245A948B-69B3-47C0-9F15-0EB6E27FACF0.jpegC49C19FE-7274-46AB-87BA-6C10292DC620.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 5 hr
Entry  Sat Apr 4 13:41:04 2020, Shahab, Runs, cooler down 
cooler is down. only one device is off GECEBG2T. updated now it is working.
Entry  Sat Apr 4 15:59:16 2020, Ragan, Shahab, Alex, Esther, Runs, 0.5 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_16-04-30-807.png636A1F49-737F-4147-8CF0-CA7F4108B719.jpeg2020-04-04_16-49-50-990.png7B45A7EA-0421-497B-8A37-674B6792D7E9.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sat Apr 4 17:32:01 2020, Ragan, Alex, Esther, General, No beam in ESR 
The beam is coming from SIS but doesn't arrive in ESR because the quadrupole magnets in ESR have failed.

Update (18:01): Problem has been resolved. 
Entry  Sat Apr 4 18:29:44 2020, Ragan, Alex, Esther, Runs, 0 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_18-27-53-442.png2020-04-04_18-41-54-901.pngF5D184AC-FB3E-4F9F-B839-F71BC55C0996.jpegE4176CCB-1828-4E2E-85FB-0AC4BDC2808B.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Sat Apr 4 18:57:49 2020, Ragan, Alex, Esther, General, Timing problem with SIS & ESR and problems with stacking 
There are further problems with beam stacking in ESR. It works occasionally but keeps failing.
There is also timing problem between SIS and FRS.
Entry  Sat Apr 4 19:55:37 2020, Ragan, Alex, Esther, Runs, Failed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_19-54-47-760.png2020-04-04_20-02-26-363.png
FAILED - measurement was stopped by sudden loss of the beam 

beam: 205Tl81+ (no scraping , Al ~1g/cm2)
Entry  Sat Apr 4 22:31:02 2020, Alex, Esther, General, Beam in ESR lost 2020-04-04_22-50-23-470.png
The beam in ESR was lost suddenly at ~22:20 due to a power supply failure of the quadrupoles.

Update (~20:40): Failure was resolved and new stacking started.
Entry  Sat Apr 4 23:44:22 2020, Ragan, RuiJiu, Laszlo, Runs, Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_23-43-29-909.png2020-04-05_09-41-00-904_10.png6275225E-0E05-42AF-9F64-F666263D89B8.jpegA12CCF1C-16DC-4869-A54C-ED812E921E3C.jpegC075E863-D102-41EE-A8CF-62220D949F4A.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
Entry  Sun Apr 5 10:21:54 2020, Shahab, Runs, 10 hour measurement pictures 2020-04-05-10h-aftergasjet2.PNG2020-04-05-10h-aftergasjet.PNG205Tl_gasjet_view3.PNG
Schottky pictures from the 10 hour measurement gas target, including the time before gas target.
Entry  Sun Apr 5 10:31:08 2020, Ragan, Shahab, Runs, Two hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-05_10-30-25-440.png2020-04-05_10-51-22-398.png2020-04-05_12-44-55-857.png93A21749-0099-4D69-8D40-32D8EC02342C.jpegFC9B44C4-D9C7-48B0-98DA-132A6CEF3596.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time:  hr
Entry  Sun Apr 5 12:48:58 2020, Shahab, Runs, 2hour measurement parent pictures 6x
 
Entry  Sun Apr 5 13:05:43 2020, Ragan, Shahab, Runs, Zero measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-05_13-04-08-686.png22A1BDA0-CAC3-4CB3-951E-F99ACD9CAED6.jpeg2020-04-05_13-58-21-916.pngCC28F701-F809-4100-982D-25E67770CAA7.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Sun Apr 5 15:28:35 2020, Ragan, Alex, Esther, Runs, Four hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
Entry  Sun Apr 5 20:23:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sun Apr 5 21:50:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sun Apr 5 23:28:01 2020, Ragan, Alex, Esther, Runs, One-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
Entry  Mon Apr 6 01:02:00 2020, Ragan, Laszlo, Nikos, Runs, Three hour measurement (S2: 0/35 mm and S6: -20/7 mm) 9x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 3 hr
Entry  Mon Apr 6 05:28:55 2020, Ragan, Laszlo, Nikos, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm) 46C168E2-D1D5-4CD3-B87F-7F82D045D527.jpegC55A1803-E814-412F-B3DC-40FE24946F8A.MOV75662B09-68EE-49FD-9BB2-71766305ECF8.jpeg1C0040AA-3CE4-4019-B85E-0049EBE85384.jpeg2020-04-06_05-40-47-352.png
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Mon Apr 6 05:43:50 2020, Ragan, Laszlo, Nikos, Runs, One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-06_06-18-59-809.png946073FA-3077-4CBF-900B-565BD19CF040.jpeg10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg2020-04-06_08-03-40-493.png
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
Entry  Mon Apr 6 08:37:02 2020, Ragan, Shahab, Pierre-Michel, Runs, 10 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 8x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
Entry  Mon Apr 6 09:34:58 2020, Shahab, Runs, Pictures from one and a half hour measurement wideband_rec_001.PNG
cheers!
Entry  Mon Apr 6 14:17:54 2020, Yuri, Shahab, Runs, FRS valves 2020-04-06_14-22-20-965.png
We saw reduction in ESR beam life. It turned out that FRS has opened valves and venting caused us reduction of the quality of vacuum in ESR leading to beam
loss. We manged to closed GEE5VV so that now beam is stable somehow.
Entry  Mon Apr 6 14:57:04 2020, Shahab, Runs, cooler down 
cooler component GECEBG2T again had to be reset.
Entry  Mon Apr 6 20:03:50 2020, Ragan, General, Experiment finished )) 
E121 experiment is finished with the last 10 hours measurement at 19:47 ))
Many thanks to everyone for there significant contributions ))
Entry  Thu Apr 9 11:16:35 2020, Ragan, General, Measurements done in the experiment storage11.pdfstorage12.pdfstorage13.pdf
 
Entry  Thu Apr 9 11:47:28 2020, ruijiu, , backup data IMG_20200409_113155.jpg
2020.4.8  12:00Started copying 
data。
2020.4.9    11:52 Copied 6.3TB 
Entry  Fri Apr 17 18:27:34 2020, ruijiu, Analysis, backup data IMG_20200417_162202.jpg
1.connect USB harddisk  to computer lxg1254 and  copy data to sever.

sync -rtmv --progress --checkSUD  /media/sdgl/data/ litv-exp@sbk0l9:/lustre/ap/litv-exp/2020-
Entry  Mon Apr 20 11:17:18 2020, Ragan, General, Logbook logbook.pdfcombined_FRS.pdfcombined_data.pdf
 
Entry  Wed Aug 5 17:19:16 2020, Rui-Jiu Chen, Analysis, Data structure DataStructure.pdf
 
Entry  Thu Oct 1 22:20:03 2020, Jan, DAQ, final unpacker config E121.specdet_mapping.hh
We identified an issue with randomly missing adc channels in all lmd-files before run 0273.
This led to errors in the unpacking process. 
Entry  Mon Nov 2 16:45:55 2020, Jan, DAQ, f_user & mbslog f_user.cmbslog.l
Attached is the f_user.c and the mbslog.l files.
The readout function is for the following setup:
3x ADC CAEN V785 
Entry  Thu Nov 5 15:13:43 2020, Jan, Analysis, root script example e121_analysis.Ce121_mapped.he121_raw.h
Attached is an example root script/macro that shows how to use scripts for analysis.

Usage:
Entry  Thu Nov 19 09:14:40 2020, Jan, Detectors, remote MSCF settings for CsISiPHOS setting.1585477986det_mapping.png
Attached is a list of all set values for the 5 MSCF shaper modules.
This was done prior to run0251, which served as a final benchmark for those settings.
See: https://elog.gsi.de/esr/E121/62
Entry  Tue Dec 8 15:47:07 2020, Jan, Detectors, manual preamp & shaper settings for CsISiPhos amp_settings.pdf
attached is a document showing fotos of all involved amplifiers in the chain to document the manual settings active during the experiment.

Summary:
Entry  Tue Dec 15 09:25:41 2020, Jan, DAQ, SiCsIPhos signal/amplitude reconstruction amps.pdf
 
Entry  Mon Mar 29 16:31:09 2021, Pierre-Michel, DAQ, cross section Pb81onAr.png
(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8 = 1.29595
Entry  Sun May 30 12:09:00 2021, Ragan, General, NTCAP ntcap_carsten.pdf
Attached is the info given by Carsten.
The instructions to operate NTCAP are given on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP
Entry  Wed Aug 25 15:13:41 2021, Jan, DAQ, SC13 clock frequency 
The frequency of the clock used as reference in scaler channel 13 has been measured precisely.
In contrast to what was expected (1.5MHz precisely), it is: 
ELOG V3.1.5-fc6679b